Supply Ability | 10 Set/Sets per Month |
Video outgoing-inspection | Provided |
Core Components | Motor, pressure vessel, and PLC |
Coating | Powder Coating |
Applicable Industries | Construction projects, manufacturing facilities, retail establishments, and shops that repair machinery |
Manufacture time | 4 months |
Heating power | natural gas, LPG, diesel oil |
Voltage | 380~440V, 110V/220V, Customers Local Voltage, 50~60H |
Dimension(L*W*H)) | about 45x24x13.5 meters |
After-sales service provided | Engineers on hand to repair gear abroad |
Brand Name | ABD |
Certification | CE |
Place of Origin | Guangdong, China |
View Detail Information
Explore similar products
Metal Aluminum Vertical Powder Coating Line 1000T To 2000T/ Month
Steel Substrate Vertical Powder Coating Line Plant PLC
ISO9001 Vertical Powder Coating Line Manual Overhead Conveyor System
Stainless Steel Pre Treatment Plant Powder Coating Paint Plant 10KW
Product Specification
Supply Ability | 10 Set/Sets per Month | Video outgoing-inspection | Provided |
Core Components | Motor, pressure vessel, and PLC | Coating | Powder Coating |
Applicable Industries | Construction projects, manufacturing facilities, retail establishments, and shops that repair machinery | Manufacture time | 4 months |
Heating power | natural gas, LPG, diesel oil | Voltage | 380~440V, 110V/220V, Customers Local Voltage, 50~60H |
Dimension(L*W*H)) | about 45x24x13.5 meters | After-sales service provided | Engineers on hand to repair gear abroad |
Brand Name | ABD | Certification | CE |
Place of Origin | Guangdong, China | ||
High Light | Vertical Powder Coating Production Line |
This proposal is designed for aluminum profiles vertical powder coating line—One Booth
1,Design data
A, Coating Material : Aluminum Profile
B, Technical Description:Loading ,pre-treatment ,drying , powder coating, Curing ,unloading .
C, coating profile specifications:
a. Max size of the profile : 100mm×200mm×L7000mm
b. Max Weight of the profile: 30KG
c. Standard weight : 3.5kg
d. Standard surface area of the profile : 400m2/T
e. Conveyor speed 1200mm/min (500mm/min ----- 20000mm/min adjustable )
2, Energy supply
A,Power supply
Single-phase voltage:220V+10%
Three-phase voltage:380V+10%
Frequency:50Hz
Equipment group line and zero line
B,Natural gas
3,compressed air
A,pressure : 7.0bar
B,Max steam flux: 1.3g/nm3
C,Max oil content: 0.01ppm
D,Max Flux of the compressed air: 8m3/min
4,Industrial water required
A,Pressure : 3+0.2bar
B,Flux; 5m3/h
5,Pure water
A,Conductivity : 10us/cm
B,Flux; 4m3/h
6,Powder
A,Powder characteristic : LEL≥40g/Nm3
7,Space between material hanging : 66mm,100mm,133mm,150mm,200mm
8,Production Capacity
Conveying chain speed: 1.2m/minute
Total coating pcs per hour: 1200mm/minute÷150mm/pcs×60minutes=480pcs/hr
Total weight per hour:480pcs×3.5kg/pcs =1.68tons/hr
Daily capacitly: 1.68tons x 16 hrs/day = 26.8 tons/day
Monthly Capacity: 26.8 tons/day × 25 days/month= 670 tons/month
9,Energy consumption reference for powder coating
Max Energy Consumption of Common Powder Coating
No. | Equipment Names | Electric | Natural Gas | Water | Pure wate |
1 | Conveyor system | 4KW | |||
2 | Pre-treatment | 75KW | 5m3/H | 4m3/H | |
3 | Drying oven | 15KW | 31m3/H | ||
4 | Powder coating system | 60KW | |||
5 | Curing Over | 35KW | 65m3/H | ||
Total | 189KW | 96m3/H | 5m3/H | 4m3/H |
Foshan Anbang De Mechanical Equipment Co., Ltd. (formerly Dali Hongwei Aluminum Industry Co., Ltd. in Nanhai District, Foshan City) was established in 1996 and changed to Foshan Anbang De Mechanical Equipment Co., Ltd. in 2012. The company is located in Fanhu Economic Development Zone, Leping Town, Sanshui District, Foshan City. It covers an area of 50 acres and has a building area of 25000 square meters, with approximately 230 people. Its main products include a fully automatic vertical electrostatic powder spraying production line for aluminum profiles, a fully automatic vertical oxidation coloring electrophoresis production line for aluminum profiles, and a fully automatic vertical fluorocarbon spraying production line for aluminum profiles.
Q1: Are you trading company or manufacturer ?
A1: We are factory and can do the exporting work by ourselves.
Q2: How long is your delivery time?
A2: About 50 workdays after received the deposit.
Q3: What is your terms of payment ?
A3: T/T and Irrevcoable L/C. 30% T/T in advance, 70% balance before shippment.
Q4: Can engineers service overseas?
A4: Yes, totally no problem.
Q5: What about the guarantee period?
A5:You will have 12 months guarantee time for the powder coating booth, if the parts broken as our mistake, we will send you by DHL.
But as we do the pre install before the laoding, so this situation won't very easy to happen we believe.
After one year, if you still have any help about the equipment, please feel free to contact us at any time, as we will supply you lifelong service.
Company Details
Business Type:
Manufacturer,Importer,Exporter,Trading Company,Seller
Year Established:
2003
Total Annual:
47,000,000.00-80,000,000.00
Employee Number:
150~200
Ecer Certification:
Verified Supplier
Foshan ABD Equipment Co., Ltd was founded in 2003. Since we started, ABD has been doing great work on design, manufacturing, and installation of aluminum surface treatment equipment, including electrostatic powder coating lines, anodizing and coloring lines as well as fluorocarbon liqu... Foshan ABD Equipment Co., Ltd was founded in 2003. Since we started, ABD has been doing great work on design, manufacturing, and installation of aluminum surface treatment equipment, including electrostatic powder coating lines, anodizing and coloring lines as well as fluorocarbon liqu...
Get in touch with us
Leave a Message, we will call you back quickly!