Ecer asks for your consent to use your personal data to:
Personalised advertising and content, advertising and content measurement, audience research and services development
Store and/or access information on a device
Your personal data will be processed and information from your device (cookies, unique identifiers, and other device data) may be stored by, accessed by and shared with 135 TCF vendor(s) and 65 ad partner(s), or used specifically by this site or app.
Some vendors may process your personal data on the basis of legitimate interest, which you can object to by do not consent. Contact our platform customer service, you can also withdraw your consent.
30-40 days for 10-100 square meter , if more than 100 square meter,need to be negotiated foam layer and hard cardboard which is suitable for container shipping.
Packaging Details
foam layer and hard cardboard which is suitable for container shipping.
30-40 days for 10-100 square meter , if more than 100 square meter,need to be negotiated foam layer and hard cardboard which is suitable for container shipping.
Packaging Details
foam layer and hard cardboard which is suitable for container shipping.
Protection foam+heat contracted plastic film/carton/wooden packing/Metal pallet or depending on clients' special requirements
Step 1. Wrap the window corner with hard and thick corrugated board, tightened with protection film.
Step 2. Label all windows and door size, quantity, project name and floor number. Then Put products on iron steel pallets.
Step 3. All goods be fixed by steel bar with screws one by one to the iron pallets, nsure the unshakable the whole pallet. Wrap the whole pallet with protection film to avoid water and dust.
Step 4. Use folk lift to load the goods into the container, insert pallet space with air bags to ensure the 100% safe.transportation. Container loading process with careful inspection.
Quality Assurance Policy
We stand by our brand and sustainable relationship with clients. So one of our key goals is to provide a quality services whilst still maintaining Value to our partners.
This goal is supported by our sound management system and be responsibilities to clients and good name in industry area.
This management system provides confidence to partners.Our services is meeting theirs expectations.
The managment system also allows us to provide team work and effective look after the project.
Company Details
Bronze Gleitlager
,
Bronze Sleeve Bushings
and
Graphite Plugged Bushings
from Quality China Factory
Business Type:
Manufacturer
Year Established:
2015
Total Annual:
10000000-30000000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Factory Strength
Established in 2015, Guangzhou APRO Building Material Co.,Ltd is a professional one-stop building material supplier.
We concentrate on Aluminum Glass product, Sun shading product and Pre-fabricated Building.
We have 3 br...
Factory Strength
Established in 2015, Guangzhou APRO Building Material Co.,Ltd is a professional one-stop building material supplier.
We concentrate on Aluminum Glass product, Sun shading product and Pre-fabricated Building.
We have 3 br...