Payment Terms | T/T, L/C |
Supply Ability | 100pcs/day |
Delivery Time | 20-25 days |
Packaging Details | White paper, sealing bag, bubble bag, carton, wooden box,as requirement |
Material | Stainless Steel/Iron/copper |
Other name | quick clamping sleeve |
Quality control certificate | GJB9001C-2017 |
Tolerance | ±0.015mm |
Color | as drawings |
delivery date | 30 days after receiving order |
Brand Name | Zhufu |
Model Number | 1502b |
Certification | ISO9001, CFA,, CASC |
Place of Origin | CHINA-GUANGDONG |
View Detail Information
Explore similar products
12.55 Mm Diameter CNC Machining Parts , M3 Button Go Gauge Checking
6mm Diameter Bathroom Faucet Components Precision Machining With CASC Approval
M5 Customized CNC Machining Parts 23mm Length For Kitchen Tap
CNC Machined Length 100mm 8mm Clear Plastic Tubing , Transparent PVC Pipe
Product Specification
Payment Terms | T/T, L/C | Supply Ability | 100pcs/day |
Delivery Time | 20-25 days | Packaging Details | White paper, sealing bag, bubble bag, carton, wooden box,as requirement |
Material | Stainless Steel/Iron/copper | Other name | quick clamping sleeve |
Quality control certificate | GJB9001C-2017 | Tolerance | ±0.015mm |
Color | as drawings | delivery date | 30 days after receiving order |
Brand Name | Zhufu | Model Number | 1502b |
Certification | ISO9001, CFA,, CASC | Place of Origin | CHINA-GUANGDONG |
High Light | OEM CNC Machining Parts ,GJB9001C-2017 CNC Machining Parts ,GJB9001C-2017 Clamping Sleeve |
Precision machining parts 1502b Quick Clamping Sleeve Roundness 0.5 die casting OEM acceptable
Description:
Made of stainless steel or other materials such as iron and cooper, widely used in all of fields. Die-casting can guarantee the safety usage, as well as good sealing.
This product is a common part used in tap for our current customers, but we could make a difference according to customer's drawing so that it can fully matched with demand.
All machining processes will be adjusted by our engineers, normally we provided samples first for confirmation.
Order procedure:
1. receiving drawing
2. confirm details and make improvements
3. sample order (sample is free of charge, freight collected)
4. making samples
5. sample for confirmation and delivery
6. purchase order for mass production
7. deposit for order
8. mass production
9. shipment
Quick details:
Factory Strength
1. Strong and Advanced Equipment
2. 20 Years of Casting Experience to Provide One-Stop Service
3. Advanced process standard system
4. 9 Steps of Tedious Process German standard casting
5. Senior Team with Multiple Honors
Packaging & Delivery:
Packaging Details: Neutral packing or as per customer's requirements. Inner box, outer carton and pallet
Port: Foshan Shunde,China
Lead time:
Qty | 1-1000 | 1001-10000 | >10000 |
Estimated time(days) | 10 | 20 | To be negotiated
|
After-sale service
Our working team and sales team can guarantee a fast and high efficiency after-sale service for our product sold to everywhere in worldwide.
ZHUFU has a complete supply system for machining parts, which can guarantee the company's demand of product accessories.
We have stocked the common parts in the major cooperation, which can shorten the lead time.
So, if customers have any question, just contact us anytime at your convenience.
FAQ:
Q1: How Can I get a quotation?
A1: Please provide 2D or 3D files or samples. Draw format: IGS, STEP, STP, JPEG, PDF, DWG, DXF, CAD etc.
Q2: What is your MOQ?
A2: Do not have MOQ limited, trial order before mass production is welcomed.
Q3: What about quality control?
A3: Self-inspection in every process by the production operator. Spot inspection and final inspection executed by QC, Defective rate controlled within 2% even lower.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2009
Total Annual:
5000000-8000000
Employee Number:
100~150
Ecer Certification:
Active Member
Foshan Zhufu Mould Hardware Co., Ltd. was established in September 2009. The company is located in Shunde District, Foshan City, covering an area of more than 3,000 square meters. It is a manufacturer specializing in the design and manufacture of water supply pipeline valves and accessories and vari... Foshan Zhufu Mould Hardware Co., Ltd. was established in September 2009. The company is located in Shunde District, Foshan City, covering an area of more than 3,000 square meters. It is a manufacturer specializing in the design and manufacture of water supply pipeline valves and accessories and vari...
Get in touch with us
Leave a Message, we will call you back quickly!