Payment Terms | T/T, L/C |
Supply Ability | 100pcs/day |
Delivery Time | 20-25 days |
Packaging Details | White paper, sealing bag, bubble bag, carton, wooden box,as requirement |
Material | Stainless Steel/Iron/copper |
Keywords | Quick clamping sleeve |
Quality control | GJB9001C-2017 |
Tolerance | ±0.15mm |
Color | as request |
thread | M26X1.25 |
Brand Name | Zhufu |
Model Number | 14034b |
Certification | ISO9001, CFA,, CASC |
Place of Origin | CHINA-GUANGDONG |
View Detail Information
Explore similar products
Customized Transparent 6mm Od Plastic Tube durable Length 108mm
D9.6mm L12mm Faucet Spare Parts , Tap Leak Sealer Stainless Steel 304
SS304 22.9mm Spare Parts For Kitchen Taps , Kitchen Faucet Replacement Parts
GJB9001C-2017 Standard SS316 Faucet Spare Parts Fast Installation
Product Specification
Payment Terms | T/T, L/C | Supply Ability | 100pcs/day |
Delivery Time | 20-25 days | Packaging Details | White paper, sealing bag, bubble bag, carton, wooden box,as requirement |
Material | Stainless Steel/Iron/copper | Keywords | Quick clamping sleeve |
Quality control | GJB9001C-2017 | Tolerance | ±0.15mm |
Color | as request | thread | M26X1.25 |
Brand Name | Zhufu | Model Number | 14034b |
Certification | ISO9001, CFA,, CASC | Place of Origin | CHINA-GUANGDONG |
High Light | Thread Die Casting Parts ,M18X1.25 Die Casting Parts ,CAFC Die Casting Parts |
Kitchen tap component 14034b stainless steel 304 Clamping Sleeve Die casting parts and core rough cast
Description:
Ra 1.6 cnc machining parts based on die casting, length 36.5mm.
Parameters:
product name | Handle casting |
application | kitchen tap |
diameter | D21.55 |
thread |
M18x1.25 |
tolerance | proceed as Standard GB/T 1800.1-2009 IT12 |
raw material | die casting |
thread checking standard | go gauge |
surface | no burs |
FAQ:
1.How can I get the price?
-We usually quote within 24 hours after we get your inquiry(Except weekend and holidays).
-If you are very urgent to get the price, please email us or contact us in other ways so that we can offer you a quote.
2. Can I buy samples placing orders?
-Yes.Please feel free to contact us.
3.What is your lead time?
-It depends on the order quantity and the season you place the order.
-Usually we can ship within 7-15 days for small quantity, and about 30 days for large quantity.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2009
Total Annual:
5000000-8000000
Employee Number:
100~150
Ecer Certification:
Active Member
Foshan Zhufu Mould Hardware Co., Ltd. was established in September 2009. The company is located in Shunde District, Foshan City, covering an area of more than 3,000 square meters. It is a manufacturer specializing in the design and manufacture of water supply pipeline valves and accessories and vari... Foshan Zhufu Mould Hardware Co., Ltd. was established in September 2009. The company is located in Shunde District, Foshan City, covering an area of more than 3,000 square meters. It is a manufacturer specializing in the design and manufacture of water supply pipeline valves and accessories and vari...
Get in touch with us
Leave a Message, we will call you back quickly!