Delivery Time | 60-90DAYS |
Packaging Details | PALLET |
application | aluminium smelter |
Applicantions | Anode Assembly |
Material | Carbon steel |
process | welding and casting |
shape | two stubs, three stubs, four stubs |
Brand Name | RUISEN |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Lost Foram Casting Steel Anode Bracket Welded Structure For Electrolytic
Lost Foam Cast Anode Yoke High Strength Compact Structure With Two Pins
Four Pins Anode Yoke Corrosion Proof For Electrolytic Aluminum Industry
Lost Foam Casting Steel Anode Yoke With Six Pins For Electrolytic Aluminum
Product Specification
Delivery Time | 60-90DAYS | Packaging Details | PALLET |
application | aluminium smelter | Applicantions | Anode Assembly |
Material | Carbon steel | process | welding and casting |
shape | two stubs, three stubs, four stubs | Brand Name | RUISEN |
Place of Origin | CHINA | ||
High Light | Carbon Anode Bracket ,Three Stubs Anode Bracket ,Three Stubs Steel Yoke |
Casting Carbon Anodes Gusset With One/Two/Three/Four Stubs In The Reduction Cell For Aluminium Smelter
Background
Carbon anodes are used in the reduction process, which operates about 960℃ to make aluminium. The electrolyte or molten“BATH” as it is commonly known, is predominantly made of recycled cryolite, with addition of alumina and other materials as necessary to maintain the desired chemistry. The carbon anodes are supported in the molten bath by copper and cast steel "anode rod assemblies" (conductors) joined to the carbon with molten castin iron to form a "complete anode assembly". These complete anode assemblies are prepared in the Rodding Room.
The anodes are consumed to about one quarter of their original weight over a period of about 18 days in the reduction process. After service the spent carbon anodes are returned to the Rodding Room for the removal so that the anode rod assemblies can be resued. The anode rod assemblies act as both a mechnical support and to transfer the largeg amounts of electrial current to the anode.
Chemical Composition
Cast steel gusset shall come suppplied with appropriate material certificates to verify the material to the standard AS 2074-2003, Grade C2 and chemical composition specified in table below.
Element | Work rangeg Min(%) | Work rangeg Max(%) | Max.Allowable Min(%) | Max.Allowable Max(%) |
C | 0.09 | 0.15 | 0.20 | |
Si | 0.40 | 0.60 | 0.60 | |
S | 0.03 | 0.03 | ||
P | 0.05 | 0.05 | ||
Mn | 0.25 | 0.50 | 0.75 | |
Cr | 0.25 | 0.25 | ||
Ni | 0.40 | 0.40 | ||
Mo | 0.15 | 0.15 | ||
Cu | 0.30 | 0.30 | ||
Carbon Equivalent | 0.00 | 0.45 |
Melt Ragnge: 1494-1515℃.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1997
Total Annual:
1,000,000-12,000,000
Employee Number:
250~300
Ecer Certification:
Verified Supplier
Shaanxi Ruisen Metallic Composite Material Co., Ltd (Xian Ruisen Clad Metal Material Co., Ltd., in 1997) was established in 2018, with a registered capital of 100 million yuan, covering an area of 84 acres, including 36,000 square meters of workshops.With a number of patented technologies, is s... Shaanxi Ruisen Metallic Composite Material Co., Ltd (Xian Ruisen Clad Metal Material Co., Ltd., in 1997) was established in 2018, with a registered capital of 100 million yuan, covering an area of 84 acres, including 36,000 square meters of workshops.With a number of patented technologies, is s...
Get in touch with us
Leave a Message, we will call you back quickly!