China factories

China factory - KingPo Technology Development Limited

KingPo Technology Development Limited

  • China,Hong kong ,Hong kong
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China IEC61215-2 Cord Anchorage Pull Tester For Non - Detachable And Movable Power
China IEC61215-2 Cord Anchorage Pull Tester For Non - Detachable And Movable Power

  1. China IEC61215-2 Cord Anchorage Pull Tester For Non - Detachable And Movable Power

IEC61215-2 Cord Anchorage Pull Tester For Non - Detachable And Movable Power

  1. MOQ: 1
  2. Price: To be quoted
  3. Get Latest Price
Payment Terms T/T
Supply Ability 100 sets per month
Delivery Time 7 working days
Packaging Details safety carton pack or plywood box
Standard IEC61215-2-MQT14.2
fuse 5A
Power 200W
Counter 0~9999(×1、×10、×100)can be preset
Test speed 5~60t/min
Weight 50KG
Dimension 750×500×700mm(W×D×H)
Brand Name KingPo
Certification ISO17025 Calibration certificate
Place of Origin China
Model Number KP-KF-8018

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 100 sets per month
Delivery Time 7 working days Packaging Details safety carton pack or plywood box
Standard IEC61215-2-MQT14.2 fuse 5A
Power 200W Counter 0~9999(×1、×10、×100)can be preset
Test speed 5~60t/min Weight 50KG
Dimension 750×500×700mm(W×D×H) Brand Name KingPo
Certification ISO17025 Calibration certificate Place of Origin China
Model Number KP-KF-8018
High Light led testing equipmentled lamp testing equipment

 
IEC61215-2 Cord Anchorage Pull Tester for Testing Pulling Force Of Non-Detachable And Movable Power Cord

Introduction

1.1 Purpose

This tester is suitable for testing pulling force of non-detachable and movable power cord.It has the advantages of beautiful appearance, reasonable layout, good reliability and convenient maintenance.
 

1.2 Standard

IEC61215-2-MQT14.2
 

1.3 Technical parameter

NoItemSpec
1Power supply220VAC±10%,50/60Hz
2fuse5A
3Power200W
4Counter0~9999(×1,×10,×100)can be preset
5Test speed5~60t/min
6Weight3N,15N,15N,42N,55N,70N,80N,100N one for each
7Dimension750×500×700mm(W×D×H)
8Weight50KG
 

 
Installation

2.1 Disassembling inspection

1. Check whether the instrument has been damaged or broken in transit;
2. Check whether the equipment is inverted;
3. Check whether the specifications on the nameplate are consistent with the order’s;
4. Check that the packing list is consistent with the object.
Do not use this instrument if any of the above occurs, and contact us in time.
 
 
2.2 Installation requirement
1. This instrument should be placed on a horizontal and stable worktable. If there is any, it should be adjusted first.
2. Operation ambient temperature:25 + 10 ° C, relative humidity: 50±30%RH RH.
This instrument should be kept away from heat source and corrosion source.
4. This instrument works with a good grounding of 220V / 50Hz + 10% power supply.

Operation

3.1 Photo


1. bar 2. centrifugal ring 3. weight 4. interface
 

3.2 Interface

  • Timer 2. Stop 3. Speed adjustment 4. Start 5. Power on/off

3.3 Procedure

1. Put the plug up, insert power cord into the hole of horizontal bar (1), and required weight (3) is attached to the bottom of the plug.
2. Connect with power supply, turn on the power (5), on the preset counter (1) set test number (set number and press the reset button to save it).Press test start button (4), tester operates;rotate speed control knob (3) to adjust test speed.
3. When all tests are done, it stops and alarm rings;then take off the sample to check damage degree.
4. Turn off the power and finish the experiment.

Daily maintenance

1.Cleaning: the surface of the instrument often needs to be cleaned and cleaned by anti-rust oil and dry cloth to prevent the dead or corroded parts of the unit.
2. Cleaning: make daily check list and check the device regularly to keep it clean.
3. Lubrication: Add a little lubricating oil on movable axis;wipe surface of electroplating and smelting tool with lubricating oil to avoid rust.
4. Power supply: before test, turn on the power for 2 ~ 5 minutes to check whether the machine is abnormal.If there is any abnormality, cut off the power immediately, and contact us in time.After the test, cut off the power.
Check: check regularly for cracks and breakage on the external skin of power cord to avoid unnecessary damage and other accidents.
 
Calibration:
 





























Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    2000

  • Employee Number:

    50~200

  • Ecer Certification:

    Verified Supplier

Kingpo Technology Development Limited is a pioneer and leader of global safety testing equipment manufacturer.We offer one-stop service for worldwide labs from R&D,testing,production to after-sales service.We dedicate ourselves in achieving optimal production quality for our customers,reduce cos... Kingpo Technology Development Limited is a pioneer and leader of global safety testing equipment manufacturer.We offer one-stop service for worldwide labs from R&D,testing,production to after-sales service.We dedicate ourselves in achieving optimal production quality for our customers,reduce cos...

+ Read More

Get in touch with us

  • Reach Us
  • KingPo Technology Development Limited
  • RM C, 13/F, HARVARD COMMERCIAL BUILDING, 105-111 THOMSON ROAD, WAN CHAI, HK
  • https://www.batterytestingmachine.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement