China factories

China factory - Zhangjiagang HuaDong Boiler Co., Ltd.

Zhangjiagang HuaDong Boiler Co., Ltd.

  • China ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Convective Radiant Pendant Superheater High Temperature Resistance In Thermal
China Convective Radiant Pendant Superheater High Temperature Resistance In Thermal

  1. China Convective Radiant Pendant Superheater High Temperature Resistance In Thermal
  2. China Convective Radiant Pendant Superheater High Temperature Resistance In Thermal
  3. China Convective Radiant Pendant Superheater High Temperature Resistance In Thermal
  4. China Convective Radiant Pendant Superheater High Temperature Resistance In Thermal

Convective Radiant Pendant Superheater High Temperature Resistance In Thermal

  1. MOQ: 1 set
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T, Western Union, MoneyGram
Supply Ability 1500 Tons / Month
Delivery Time 50 ~ 100 Days
Packaging Details Seaworthy packing
Fuel Coal
Type Energy Saving
Size Customized
Usage Industry
Surface Treatment Painted
Pressure Low / High
Structure Fire / Water Tube
Manufacturing Level A
Brand Name HD BOILER
Model Number Heating area
Certification ISO9001 , SGS , TUV , ASME , EN
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, Western Union, MoneyGram Supply Ability 1500 Tons / Month
Delivery Time 50 ~ 100 Days Packaging Details Seaworthy packing
Fuel Coal Type Energy Saving
Size Customized Usage Industry
Surface Treatment Painted Pressure Low / High
Structure Fire / Water Tube Manufacturing Level A
Brand Name HD BOILER Model Number Heating area
Certification ISO9001 , SGS , TUV , ASME , EN Place of Origin China
High Light superheater in boiler reheater in power plant

 

Description

 

The function of Super heater in the thermal power plant is to remove the last traces of moisture from the saturated steam coming out of boiler and to increase its temperature above saturation temperature as per requirement at inlet of steam turbine.

 

Details

 

• Superheating raises overall efficiency as well as avoids too much condensation in last stages of turbine which avoids blade erosion.

The heat of combustion gases from furnace is utilised for removal of moisture from steam and to superheat the steam.

Super-heaters ususlly have several tube circuits in parallel with one or more return bends,connected between headers.

Heat from the hot gases to the vapour in the surperheater is transferred at high temperatures.

Therefore promary section of superheater is arranged in counterflow and secondary section in parallel flow to reduce the temp.stressing of the tube wall.

 

Principle

 

• Principle of superheater is similar to steam generating tubes of boiler.

• The hot gases at high temperature sweep over superheater tubes and raise the temperature of steam which magnitude depends upon exit gas temperature leaving the superheater and gas velocity.

 

Differences

 

Type Advantages Disadvantages Supporting method
Pendant-type 1.Firm structural support 1. Flow blockage by condensed steam 2. Needs slow restart to purge the water that accumulates in the bottom. supported from above
Inverted-type 1.Proper drainage of the condensed steam 1. Lack the structural rigidity, especially in high speed gas flow Supported from below
Horizontal -type

1. Proper drainage

2. Good structural rigidity.

1. They do not view the flam directly so they are mainly from the convective type Usually supported in the vertical gas ducts parallel to the main furnace.
 

 

 

Company Introduction

 

Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.

 

1. Fabrication area of 200,000 square meters

2. 150 Engineers

3. 600 Coded welders

4. 60 Licensed Inspectors(NDT Level-III instructors)

5. Class-A Licenses for Design and Manufacture Boiler

6. ISO 9001:2008 Quality System

7. ASME Certificate of Power Boilers

8. ASME 'S','U' and NB stamp authorization

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    1985

  • Total Annual:

    100,000,000-120,000,000

  • Employee Number:

    1000~1100

  • Ecer Certification:

    Verified Supplier

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang HuaDong Boiler Co., Ltd.
  • Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.boilerfabrication.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement