Payment Terms | L/C, T/T, Western Union |
Supply Ability | 400 Tons per month |
Delivery Time | 50~100 Days |
Packaging Details | Seaworthy Packing |
Condition | New |
Structure | Fire / Water Tube |
Fuel | Coal / Gas / Coal-fired / Water heat |
Type | Natural Circulation / Once Through |
Specification | Customized |
HS Code | 3215960855 |
Brand Name | HD Boiler |
Model Number | Steam drum |
Certification | ISO9001 , SGS , TUV , ASME , EN |
Place of Origin | China |
View Detail Information
Explore similar products
1300hp Horizontal Waste Oil Natural Gas Steam Boiler Pollution Free
High Pressure Water Tube Boiler Steam Drum For 75 T / H Indonesia EPC Project
Horizontal Water Tube Coal Fuel ASME Boiler Steam Drum
Natural Circulation Alloy Steel Hrsg Drum Cylindrical Pressure Vessel
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 400 Tons per month |
Delivery Time | 50~100 Days | Packaging Details | Seaworthy Packing |
Condition | New | Structure | Fire / Water Tube |
Fuel | Coal / Gas / Coal-fired / Water heat | Type | Natural Circulation / Once Through |
Specification | Customized | HS Code | 3215960855 |
Brand Name | HD Boiler | Model Number | Steam drum |
Certification | ISO9001 , SGS , TUV , ASME , EN | Place of Origin | China |
High Light | high efficiency hrsg steam drum ,water tube hrsg steam drum ,Coal hrsg steam drum |
Power Plant Boiler Steam/Water Drum for Industrial Boiler High Efficiency
Description
The boiler headers have water wall header, superheater header,economizer header and so on, it acts as collection, mixture, re-distributing working medium, as the structure, it can be classified as the end cover type( end enclosure) and necking down type.
The header is consisted of header body ( large diameter seamless steel tube ), end cover ( enclosure ) , tube joint, hand hole, thermomter socket and so on. And the welding checking is strictly proceeded as the welding process to guarantee 100% qualified products.
Drum is a cylindrical pressure vessel used for steam water separation and steam purification in water tube boiler to form water circulation circuit and store boiler water. Its main function is to receive water from economizer, separate steam and water, supply water to circulating circuit and deliver saturated steam to superheater. There is a certain amount of water in the drum, which has a certain amount of heat and working medium storage. It can slow down the steam pressure change speed when the working condition changes, and play a certain buffer role when the feed water and load are not coordinated for a short time. The drum is equipped with internal devices for steam water separation, steam cleaning, dosing in the boiler and continuous blowdown to ensure steam quality, as shown in the figure.
Drum is the most bulky and expensive thick wall pressure bearing part in boiler. The drum not only bears high internal pressure, but also generates thermal stress due to the variation of operating conditions and the fluctuation of wall temperature. Therefore, the working conditions are poor, and effective monitoring of operating conditions is needed.
Steam-water separation details
Primary steam-water separation removes nearly all the steam from the water so that very little steam is recirculated from the drum bottom towards the heated tubes through the outlet connection (downcomer).
At secondary separation, steam is passed through a secondary stage of separators or scrubber elements (usually closely spaced corrugated parallel plates) for final water droplet removal. Steam is then exhausted through various ports.
Product Name | |
Steam Capacity | 6-30 tons of steam per hour |
Boiler Power | 30-1300hp |
Working Pressure | 1.25Mpa. 1.6Mpa, 2.5Mpa |
Steam Temperature | 193℃,204℃,226℃ |
Thermal Efficiency | 95% |
Operation Control | Intelligent PLC Control |
Company Introduction
Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.
1. Fabrication area of 200,000 square meters
2. 150 Engineers
3. 600 Coded welders
4. 60 Licensed Inspectors(NDT Level-III instructors)
5. Class-A Licenses for Design and Manufacture Boiler
6. ISO 9001:2008 Quality System
7. ASME Certificate of Power Boilers
8.ASME 'S','U' and NB stamp authorization
Design and Manufacturing capacity
1. Two automatic coiler production lines
2. Hot bending to minimum bending radius 0.6D
3. Membrane wall tube bending , with horizontal and vertical panel bending machines
4. Panel fabrication for up to for 1000MW power plant boilers
5. Fabrication of CFB Boiler Cyclone Separators
6. Fabrication of Header to Chinese standards(GB), US standards (ASME), or EU standard (EN)
7. Broad range of heat treatment equipment including 10 furnaces, offering normalizing and tempering
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us
Leave a Message, we will call you back quickly!