China factories

China factory - Zhangjiagang HuaDong Boiler Co., Ltd.

Zhangjiagang HuaDong Boiler Co., Ltd.

  • China ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Grade A Steam Power Station Condensing Boiler Economizer
China Grade A Steam Power Station Condensing Boiler Economizer

  1. China Grade A Steam Power Station Condensing Boiler Economizer
  2. China Grade A Steam Power Station Condensing Boiler Economizer
  3. China Grade A Steam Power Station Condensing Boiler Economizer

Grade A Steam Power Station Condensing Boiler Economizer

  1. MOQ: 1 Set
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms Western Union, L/C, T/T, MoneyGram
Supply Ability 500 Tons per month
Delivery Time 30 Days
Packaging Details Seaworthy Packing
Condition New
Fuel Coal / Gas / Coal-fired / Water heat
Type Energy Saving
Pressure Low / High Pressure
Structure Fire / Water Tube
Range of Applications Industrial
Specification Customized
Surface Treatment Painted
Brand Name HD BOILER
Model Number Economizer
Certification ISO9001,ASME,Grade A,SGS,EN,TUV
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms Western Union, L/C, T/T, MoneyGram Supply Ability 500 Tons per month
Delivery Time 30 Days Packaging Details Seaworthy Packing
Condition New Fuel Coal / Gas / Coal-fired / Water heat
Type Energy Saving Pressure Low / High Pressure
Structure Fire / Water Tube Range of Applications Industrial
Specification Customized Surface Treatment Painted
Brand Name HD BOILER Model Number Economizer
Certification ISO9001,ASME,Grade A,SGS,EN,TUV Place of Origin China
High Light Condensing Boiler Economizerpainter surface Boiler EconomizerGrade A steam power station Economizer

Condensing gas hot water boiler Economizer for power/ suger/ paper industrial use saving energy


Economizer Description

 

Classifications

There are two versions of the device used in data centers: air-side economizers and water-side economizers.

• Airside economizers pull cooler outside air directly into a facility to prevent overheating.
• Water-side economizers use cold air to cool an exterior water tower. The chilled water from the tower is then used in the air conditioners inside the data center instead of mechanically-chilled water, reducing energy costs. Water-side economizers often operate during nightime to take advantage of cooler ambient temperatures.

 

Differences

• A conventional feedwater economizer reduces steam boiler fuel requirements by transferring heat from the flue gas to the boiler feedwater. For natural gas-fired boilers, the lowest temperature to which flue gas can be cooled is about 250°F to prevent condensation and possible stack or stack liner corrosion.
• The condensing economizer improves waste heat recovery by cooling the flue gas below its dew point, which is about 135°F for products of combustion of natural gas. The economizer reclaims both sensible heat from the flue gas and latent heat by condensing flue gas water vapor. All hydrocarbon fuels release significant quantities of water vapor as a combustion byproduct.

 

The key to a successful waste heat recovery project is optimizing the use of the recovered energy.By installing a condensing economizer,companies can improve overall heat recovery and steam system efficiency by up to 10 percent.Many boiler applications can benefit from this additional heat recovery such as district heating systems,wallboard production facilities,greenhouses,food processing plants,pulp and paper mills,textile plants,and hospitals.

 

Boiler Efficiency of Condensing Economizers
System Combustion Efficiency@4% ExcessO2(%) Stack Gas Temperature°F
Boiler 78 to 83% 350 to 550
-With Feedwater(FW)Economizer 84 to 86% 250 to 300
-With FW and Condensing Economizer 92 to 95% 78 to 150

 

Suggested Actions

• Determine your boiler capacity, average steam production, combustion efficiency, stack gas temperature, annual hours of operation, and annual fuel consumption.

• Identify in-plant uses for heated water, such as boiler make-up water heating, preheating, domestic hot water, or process water heating requirements.

• Determine the thermal requirements that can be met through installation of a condensing economizer. Determine annual fuel energy and cost savings.

• Determine the cost-effectiveness of a condensing economizer. Ensure that system changes are evaluated and modifications are included in the design (e.g., mist eliminator, additional water treatment, heat exchangers). Simple paybacks for condensing economizer projects are often less than two years.

 

Delivery

 

 

Company Introduction

Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.

 

1. Fabrication area of 400,000 square meters

2. 150 Engineers

3. 600 Coded welders

4. 60 Licensed Inspectors(NDT Level-III instructors)

5. Class-A Licenses for Design and Manufacture Boiler

6. ISO 9001:2008 Quality System

7. ASME Certificate of Power Boilers

8. ASME 'S','U' and NB stamp authorization

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    1985

  • Total Annual:

    100,000,000-120,000,000

  • Employee Number:

    1000~1100

  • Ecer Certification:

    Verified Supplier

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang HuaDong Boiler Co., Ltd.
  • Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.boilerfabrication.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement