China factories

China factory - Suzhou orl power engineering co ., ltd

Suzhou orl power engineering co ., ltd

  • China
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Sa210 Sa192 Boiler Water Cooling Wall Pipes For Power Plant
China Sa210 Sa192 Boiler Water Cooling Wall Pipes For Power Plant

  1. China Sa210 Sa192 Boiler Water Cooling Wall Pipes For Power Plant

Sa210 Sa192 Boiler Water Cooling Wall Pipes For Power Plant

  1. MOQ: 1 Set/Sets 10tons
  2. Price: Contact me | Get Latest Price
  3. Get Latest Price
Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability 500Ton/Tons per Month
Delivery Time 50~100 Days
Packaging Details Iron Frame Package
Style Style
Condition New
Fuel Coal、Gas、Oil-fired, Water Heat
Output Hot Water、Steam
Dimension(L*W*H) Customization
Type Once Through、Natural Circulation
Weight 10~1000ton
Pressure High、Low Pressure
Product name Water Wall Panels for Boiler power station
Keywords Water Wall Panels
Brand Name ORL Power
Model Number Customization
Certification ISO9001/SGS/TUV/ASME/EN
Place of Origin Zhangjiagang,Jiangsu,China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram Supply Ability 500Ton/Tons per Month
Delivery Time 50~100 Days Packaging Details Iron Frame Package
Style Style Condition New
Fuel Coal、Gas、Oil-fired, Water Heat Output Hot Water、Steam
Dimension(L*W*H) Customization Type Once Through、Natural Circulation
Weight 10~1000ton Pressure High、Low Pressure
Product name Water Wall Panels for Boiler power station Keywords Water Wall Panels
Brand Name ORL Power Model Number Customization
Certification ISO9001/SGS/TUV/ASME/EN Place of Origin Zhangjiagang,Jiangsu,China
High Light Sa210 Boiler Cooling WallSa192 Boiler Cooling WallSa210 Water Cooling Wall

Sa210 Sa192 Boiler Water Cooling Wall Pipes For Power Plant

 
 
Website:www.orlpower.com

 
 
Our membrane water wall are manufactured using high grade raw material and contemporary production equipment at our advanced manufacturing unit. The offered range is available in various sizes, shapes and specifications, as per the requirements of our esteemed clients. Further, these are delivered to the clients within promised time frame.
 
 
Product Description
 
Advantages of Membrane Water Wall
1). To guarantee the leakproofness of furnace wall and reduce the air leak of combustion chamber.
2). To achieve the full water cooling of combustion chamber, and the boiler accessories membrane water wall is benefit to prevent coking under the condition of supplemental firing.
3). The thermal storage capacity is small, the warming of combustion chamber is fast and the cooling is also fast, which could shorten the cooling time of boiler’s start and furnace shut down.
4). It is good to adopt top supported water cooled wall and it could reduce the load of boiler framework, which is benefit to overhang.
5) Compared with the bare tubes, the membrane water wall improves the heat absorption capacity of tubes.
6) The factory direct boiler membrane water wall could improve the Preliminary combination degree of boiler parts and reduce the installation workload.

 
Application
Boiler water walls are membrane walls that are made of tubes welded together with or without a strip of metal in between. These walls form the enclosure of the coal combustion chamber. Water wall tubes are also referred to as the evaporator section; they contain water mostly in liquid form which gradually evaporates as it rises in the boiler.
Challenges
As the water wall tubes form a lining along the whole boiler, they are submitted to a temperature gradient of 300 °C to 500 °C between the bottom section of the boiler and its top. To facilitate fitting, the panels in the boiler should preferably be made of steel grades that do not require any post-weld heat treatment. Vallourec supplies tubes for water walls in all grades, from carbon steel to advanced low-alloy steel, with outside diameters ranging from 31.8 mm to 63.5 mm.

 
Materials
BS 3059 Grade 440 seamless carbon steel tubes.
Welding Processes / Procedures
STT II – Surface Tension Transfer (STT) Process with certified & tested weld procedures.
TIG welding process.

Fabrication Standards / National Codes
AS1228 – Power Boilers
AS4458 – Pressure Equipment Manufacture
AS4041 – Pressure Piping
AS4037 – Pressure Equipment – examination & testing

Quality Assurance Requirements
Material certification for all materials

Inspection and Test Plan (ITP)
100% radiography on butt weld joints

 

Company Exhibition
 


 
 

Company Business
 


 
 
 

Packaging & Shipping
 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Total Annual:

    $5000000-$10000000

  • Employee Number:

    500~600

  • Ecer Certification:

    Active Member

    Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province. ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin ...     Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province. ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin ...

+ Read More

Get in touch with us

  • Reach Us
  • Suzhou orl power engineering co ., ltd
  • https://www.boiler-units.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement