China factories

China factory - Shandong Boyoun Heavy Industries Co., Ltd.

Shandong Boyoun Heavy Industries Co., Ltd.

  • China,Beijing ,Beijing
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Steel Material Bridge Deck Formwork Underslung Form Traveler System One Year
China Steel Material Bridge Deck Formwork Underslung Form Traveler System One Year

  1. China Steel Material Bridge Deck Formwork Underslung Form Traveler System One Year
  2. China Steel Material Bridge Deck Formwork Underslung Form Traveler System One Year

Steel Material Bridge Deck Formwork Underslung Form Traveler System One Year

  1. MOQ: 50TONS
  2. Price:
  3. Get Latest Price
Payment Terms L/C, T/T
Supply Ability 5000TONS/MONTH
Delivery Time 60DAYS
Packaging Details EXPORT STANDARD PACKAGE
Material steel
Standard GB,ASTM
Usage Concrete bridge
Method Underslung Form Traveler
Warranty One year
Color Blue
Design Boyoun design and OEM
Delivery time within 60days
Technical service Online technical support and after sales on site
Brand Name Boyoun
Model Number Underslung
Certification ISO
Place of Origin CHINA

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T Supply Ability 5000TONS/MONTH
Delivery Time 60DAYS Packaging Details EXPORT STANDARD PACKAGE
Material steel Standard GB,ASTM
Usage Concrete bridge Method Underslung Form Traveler
Warranty One year Color Blue
Design Boyoun design and OEM Delivery time within 60days
Technical service Online technical support and after sales on site Brand Name Boyoun
Model Number Underslung Certification ISO
Place of Origin CHINA
High Light precast formwork systemmetal formwork system

High quality Cable stay concrete bridge underslung Form Traveler system for cast in situ project steel shutters

 

 

Underslung Form Traveller is a cost – effective and reliable solution! Both the overhead and the underslung FT are designed for free cantilever construction of pre-stressed girder and cable – stayed concrete bridges. And underslung FT designed for a segment length with 5 m to 9m.

 

The superstructure of cable-stayed bridge consists of three parts: main girder, tower and stay cable. Various materials and forms can be used for each part of the structure, so there are many construction methods. The construction method of the main girder of cable-stayed bridge is closely related to the structural characteristics of the bridge, such as the structural system, cable type, cable distance and the cross-section form of the main girder, in addition to the factors such as the construction technical equipment and site environmental conditions. Generally, the main girder of long-span cable-stayed bridge is constructed by cantilever casting or cantilever assembly. For small and medium span cable-stayed bridges, support method, jacking method or horizontal rotation method can be used according to the topographical, hydrological and meteorological conditions of the bridge site and the characteristics of the structure itself. It should be emphasized that the internal force of different construction methods is different in each construction stage, sometimes the structural design is often controlled by the internal force of construction, so the construction method, internal force and deformation of construction must be considered in the structural design. The selection of construction methods should meet the design requirements. New design concept can promote the progress of construction technology, while advanced and reasonable construction technology and experience can also promote the development of design theory.

 

The construction of suspension bridge mainly includes the fabrication and installation of anchorage, bridge tower, main cable, sling and stiffening beam. The anchorage structure is divided into three types: gravity type, tunnel type and rock type, and the former two types are mainly. Rock anchorage type is generally combined with tunnel type. The tower of long-span suspension bridge is made of steel or concrete. Small span suspension bridges are built with masonry materials. The main cables of suspension bridges are usually erected by air spinning or preformed parallel wire strands. Generally speaking, the erection of stiffening beams adopts prefabricated and assembled construction.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company,Seller

  • Year Established:

    2006

  • Total Annual:

    1000000-30000000

  • Employee Number:

    300~400

  • Ecer Certification:

    Active Member

Boyoun, founded in 2006, is a China-based company with wealth of experience, specializing in formwork and scaffolding. In addition, we provide a wide range of formwork solutions that are already been actively used in China.   The headquarter and main factory are located in Binzhou city, S... Boyoun, founded in 2006, is a China-based company with wealth of experience, specializing in formwork and scaffolding. In addition, we provide a wide range of formwork solutions that are already been actively used in China.   The headquarter and main factory are located in Binzhou city, S...

+ Read More

Get in touch with us

  • Reach Us
  • Shandong Boyoun Heavy Industries Co., Ltd.
  • Room 1907, Jincheng Center, Tongzhou, Beijing, China 101100
  • http://www.bridgeformworksystems.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement