China factories

China factory - Shandong Boyoun Heavy Industries Co., Ltd.

Shandong Boyoun Heavy Industries Co., Ltd.

  • China,Beijing ,Beijing
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Concrete Lining Tunnel Formwork System Waterproof Heavy Duty For Construction
China Concrete Lining Tunnel Formwork System Waterproof Heavy Duty For Construction

  1. China Concrete Lining Tunnel Formwork System Waterproof Heavy Duty For Construction

Concrete Lining Tunnel Formwork System Waterproof Heavy Duty For Construction

  1. MOQ: 50 Ton/Tons
  2. Price: Negotiable
  3. Get Latest Price
Supply Ability 60000 Ton/Tons per Year
Delivery Time 50days
Packaging Details Standard or according to your requirement
Material Q235B Steel
Certificate ISO9001
Usage Easy to use
Color according to your requirement
Surface treatment Painted
Type Bridge form
MOQ 50 TONS
Tolerance Standard or according to your requirement
Formwork design Boyoun supply
Port Tianjin/Qingdao
Brand Name BOYOUN
Model Number Formwork System
Certification SGS; ISO
Place of Origin Shandong, China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Supply Ability 60000 Ton/Tons per Year Delivery Time 50days
Packaging Details Standard or according to your requirement Material Q235B Steel
Certificate ISO9001 Usage Easy to use
Color according to your requirement Surface treatment Painted
Type Bridge form MOQ 50 TONS
Tolerance Standard or according to your requirement Formwork design Boyoun supply
Port Tianjin/Qingdao Brand Name BOYOUN
Model Number Formwork System Certification SGS; ISO
Place of Origin Shandong, China
High Light tunnel lining formworkhydraulic tunnel formwork
Tunnel Concrete Lining steel quality Formwork Waterproof Heavy-duty tunnel formwork system for construction
 
PRODUCT DESCRIPTION
 
 

Tunnel lining trolley

 

Boyoun's self-developed tunnel lining trolleys focus on versatility

and humanized construction, which can effectively improve theconstruction progress. lt has the advantages of reliable structure,convenient operation and good tunnel forming surface. It is widely used in roads, railways, water conservancy and hydropower.Municipal, defense, military and other construction.Heavy-duty tunnel formwork system for construction of subway stations, road or train tunnels and hydraulic galleries
Equipment for lining tunnels.Self-supporting formwork that is moved using hydraulically driven carriages.

 

Tunnel Formwork

1. The trolley developed by Boyoun which is concentrated on commonality, humanity construction. Structure reliable, convenient operation, good tunnel surface etc.

2. The trolley widely used in highway, railway, water projects, hydraulic engineering, public projects, and defense industry projects.

3. The tunnel trolley which consist of formwork assembly, traveling device, portal-frame assembly, Principal and master-slave traveling device, lateral hydraulic oil cylinder, lateral support jack and portal-frame support jack etc.

Tunnel lining trolly

There are 6m, 7.5m, 9m, 10.5m, 12m different specifications. Customers can choose it according to tunnel length and construction period. The lining trolley can be divided into side & roof arch type, fully round acerate-beam type, the bottom platform needle-beam type, fully round through type etc.

Design principles:

- light weight;
- simple, strong and stable structure;
- moved, mounted and stripped easily;
- strong reusability;
- small deformation under force;
- adequate space under traveler and providing a big space for bars and formwork construction operation.

 
Online customer service 

Mon-Fri: (other time please reserve)

08:30 - 12:00  (Beijing time)

13:00 - 17:00  (Beijing time)

All-in-one solution

Professional solution for each project

Prompt offer with competitive price

Process every unique project for client

Formwork instructors

The Boyoun formwork in­struc­tors are  spe­cial­ly trained and ex­pe­ri­enced prac­ti­tion­ers who know how to install

CERTIFICATIONS
 
FAQ

1. Where is your factory?

Our factory is located in Binzhou city, Shandong province, where is 350km far from Beijing, 240km far from Tianjin port. Our sales office is located in Beijing city.

2. How fast can my order be delivered?

You can state your desired Delivery date for your order. The order and the desired delivery date will be checked after your order got sent.
When you receive your order confirmation, you will find the information on your final delivery date (outgoing). We will, of course, try our best to meet the specified delivery date.

3. What's the material of your products?

Steel Q235B or Q345B. 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company,Seller

  • Year Established:

    2006

  • Total Annual:

    1000000-30000000

  • Employee Number:

    300~400

  • Ecer Certification:

    Active Member

Boyoun, founded in 2006, is a China-based company with wealth of experience, specializing in formwork and scaffolding. In addition, we provide a wide range of formwork solutions that are already been actively used in China.   The headquarter and main factory are located in Binzhou city, S... Boyoun, founded in 2006, is a China-based company with wealth of experience, specializing in formwork and scaffolding. In addition, we provide a wide range of formwork solutions that are already been actively used in China.   The headquarter and main factory are located in Binzhou city, S...

+ Read More

Get in touch with us

  • Reach Us
  • Shandong Boyoun Heavy Industries Co., Ltd.
  • Room 1907, Jincheng Center, Tongzhou, Beijing, China 101100
  • http://www.bridgeformworksystems.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement