Payment Terms | T/T or L/C at sight |
Supply Ability | 10000 metric ton/month |
Delivery Time | 15~45days |
Packaging Details | All steel members are put into one steel holder |
Material: | Q345B & Q235B |
Size: | 15*20M |
Design: | PKPM |
Type: | I / H Beam |
Bracing: | D12 / D18 rod |
Treatment: | Hot-Dip Galvanized |
Connection: | By Bolt |
Application: | With Crane Warehouse |
Brand Name | SPDAR , Hongfa |
Model Number | SWH |
Certification | ISO9001:2008, AWS and BS EN ISO welding certificate by Singapore Setsco |
Place of Origin | Guangdong of China |
View Detail Information
Explore similar products
Q235B/Q355B Warehouse Steel Structure Building Workshop Warehouse Building Frame
Q345B Warehouse Steel Structure For Stocking With Normal Paint Plus Color Steel
Small Warehouse Steel Structure / Light Steel Frame Construction
Pre - Fabricated Warehouse Steel Frame With Steel Floor Decks Power Produce
Product Specification
Payment Terms | T/T or L/C at sight | Supply Ability | 10000 metric ton/month |
Delivery Time | 15~45days | Packaging Details | All steel members are put into one steel holder |
Material: | Q345B & Q235B | Size: | 15*20M |
Design: | PKPM | Type: | I / H Beam |
Bracing: | D12 / D18 rod | Treatment: | Hot-Dip Galvanized |
Connection: | By Bolt | Application: | With Crane Warehouse |
Brand Name | SPDAR , Hongfa | Model Number | SWH |
Certification | ISO9001:2008, AWS and BS EN ISO welding certificate by Singapore Setsco | Place of Origin | Guangdong of China |
High Light | steel building warehouse ,steel frame warehouse |
Warehouse Steel Structure With Hot-Dip Galvanized And Yellow Crane Beam
Characteristics:
Easy to assemble
Long using time over 50 years
Environment friendly
Recyclable
Excellent anti-shock and anti-impact ability
Laser Cutting Plate And Drilling The Hole
Production Showing
---What do our products can for?
Our products can do warehouse, workshop, storage shed, school, hanger shed, commercial building, high rise building, etc.
---How long can delivery?
Normally it needs around 45 days within 300 Tons when all drawing is confirmed.
---What’s the payment term?
30% deposit by TT when signing contract, 70% balance be paid by TT before shipment against final production material list.
---How to ship to job site?
Normally we use 40HQ, or 40OT.
---How about the erection?
We can provide 1 or 2 engineer supervise your erection if you need.
---Any others products can be supply?
All products about steel frame can be supplied, such as roofing sheet, wall panel, crane, door, window, down pipe and some accessories.
---Contact Information
Any questions, please contact Miss. Helen---008613712413260 --- helensun@hf-steel.com
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1993
Total Annual:
>100,000,000
Employee Number:
>1000
Ecer Certification:
Active Member
Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen... Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen...
Get in touch with us
Leave a Message, we will call you back quickly!