Payment Terms | T/T |
Supply Ability | 35 sets per month |
Delivery Time | 5-8 work days |
Packaging Details | Standard export package |
Features | Attractive And Durable |
Part Material | PC+ABS-GF30 |
Size Tolerance | +/-0.05mm |
Quality Control | Inspected and Reconfirmed Before Shipment |
Fitness | 100% Match |
Mould Material | According to Customer's Requirements |
Use for | Car Shiny Interior Trim Parts |
Mould Base Standard | Hasco, Dme, Meusburger, Futaba, Lkm, etc |
Mould Price | Cost-Effective and Competitive |
After-Sales Service | 12 Months for Free |
Brand Name | ERBIWA Mould |
Certification | ISO 9001: 2015 IATF 16949: 2016 |
Place of Origin | Guangdong, China |
View Detail Information
Explore similar products
Customed Automotive Mold, Black Durable Auto Spare Parts For Car Rearview Mirror
Custom Plastic Injection Mould For Certificated Car Parts Front Fog Lamp Cover
Custom Auto Lighting System Car Parts Mold , Headlight Molding Parts
ABS Car Parts Mould , Black Panel Below Steering Wheel for Obstructing
Product Specification
Payment Terms | T/T | Supply Ability | 35 sets per month |
Delivery Time | 5-8 work days | Packaging Details | Standard export package |
Features | Attractive And Durable | Part Material | PC+ABS-GF30 |
Size Tolerance | +/-0.05mm | Quality Control | Inspected and Reconfirmed Before Shipment |
Fitness | 100% Match | Mould Material | According to Customer's Requirements |
Use for | Car Shiny Interior Trim Parts | Mould Base Standard | Hasco, Dme, Meusburger, Futaba, Lkm, etc |
Mould Price | Cost-Effective and Competitive | After-Sales Service | 12 Months for Free |
Brand Name | ERBIWA Mould | Certification | ISO 9001: 2015 IATF 16949: 2016 |
Place of Origin | Guangdong, China | ||
High Light | Automotive Interior Components Mold ,Customized Automotive Interior Components Mold ,Precision Car Parts Mold |
High performance automotive interior parts injection moulds
Part 1: Mould Description
Certifications: IATF 16949 Certified - Ensuring Quality and Compliance for Automotive Interior Components with a Distinct Wood Finish.
Mould Types Offered: Plastic Injection, Overmolding, Interchangeable, Insert Molding, Compression, Stamping, Die Casting, and more.
Design Software: Utilizing Advanced CAD Tools including UG, ProE, AutoCAD, Solidworks for Precision Design.
Services Provided: Prototyping, Design, Manufacturing, Testing, and Low/High Volume Production.
Quality Assured: ISO9001:2015 and IATF16949:2016 Certified.
Steel Grades: High-Quality Materials such as 718H, P20, NAK80, S316H, SKD61 for Optimal Performance.
Plastic Raw Materials: Wide Selection including PP, PA6, PLA, ABS, PE, PC, POM, PVC, PET, PS, TPE/TPR for Versatile Applications.
Mold Base Standards: HASCO, DME, LKM for Compatibility and Durability.
Runner Systems: Efficient Cold and Hot Runner Systems, including YUDO Hot Runner Technology.
Cooling Systems: Water Cooling or Enhanced Beryllium Bronze Cooling for Rapid Cycle Times.
Surface Finishes: EDM, Texturing, High-Gloss Polishing for Aesthetic and Functional Excellence.
Hardness Range: Steel Hardness between 20~60 HRC for Customized Durability.
Production Equipment: State-of-the-Art CNC, EDM, Wire Cutting, Grinding, Lathe, Milling, and Injection Machines.
Lead Time: 35-55 Working Days from Design Approval.
Monthly Capacity: 50 Sets for Flexible Production Schedules.
Packing: Standard Export Wooden Cases for Safe Transportation.
Part 2: Mould Making Process
1. Quotation Request: Submit 2D/3D Drawings or Physical Samples for an Accurate Quote.
2. Design Review: Receive and Confirm Mould Design Drawings within a Week Post Down Payment.
3. Mould Fabrication: Commence Manufacturing Once Design is Approved.
4. Initial Sampling: Review First-Shot Samples for Quality Assurance.
5. Sample Approval: Confirm Samples Meet Specifications.
6. Progressive Payments: Second Payment upon Receipt of Initial Samples.
7. Customization: Modify Mould as Necessary Based on Feedback.
8. Delivery: Final Delivery Upon Receipt of Third Payment.
9. Warranty: Enjoy a Complimentary 12-Month Warranty for Peace of Mind.
10. Final Settlement: Balance Payment Two Months After Shipment.
Part 3: Why Choose Us
Expert Team: Skilled Professionals with Advanced Technical Expertise.
Cutting-Edge Technology: Latest Equipment for Precision and Efficiency.
Cost-Effective Solutions: Competitive Pricing with OEM Design Capabilities.
Design Support: Free Design Drawings and Assistance.
Industry Experience: Over 15 Years in Injection Mould Production.
Sustainability: Eco-Friendly Materials and Processes.
Quality Control: Stringent Quality Management System.
Timely Delivery: On-Time Delivery Guaranteed.
Transparency: Weekly Reports with Visual Updates Throughout Production.
Customer Engagement: Ongoing Communication Including Videos and Photos During Mould Testing.
Packaging Consultation: Collaborative Packaging Confirmation Prior to Delivery.
Warranty Coverage: Comprehensive Warranty with Free Maintenance.
Part 4: Frequently Asked Questions (FAQ)
Pricing: Quotes Issued within 24 Hours Upon Inquiry.
Lead Time: Tailored to Project Complexity, Typically 25-35 Days for Standard Moulds, Shorter for Simpler Designs.
Project Initiation: No 3D Drawings? Supply a Sample and We'll Create the Design for You.
Quality Assurance: Detailed Production Video, Report, Product Dimensions, Surface Inspection, and Packing Verification Provided Pre-Shipment.
Part 5: Showcasing Our Work
[Include images or links to a gallery showcasing previous work and sample moulds.]
For further inquiries or to discuss your specific requirements, please don't hesitate to contact us. We're here to support your automotive component manufacturing needs with precision and care.
Part 5: The Injection Mould & Samples
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller
Year Established:
2016
Total Annual:
3,200,000-5,000,000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
2021 ERBIWA Mould-Equipment List.pdf ERBIWA Mould Industrial Co., Ltd was established in 2016 in Changan Town, Dongguan City. It takes less than one hour from Shenzhen airport to our company. Therefore, our company has superior location and facilitated traffic and the logistics i... 2021 ERBIWA Mould-Equipment List.pdf ERBIWA Mould Industrial Co., Ltd was established in 2016 in Changan Town, Dongguan City. It takes less than one hour from Shenzhen airport to our company. Therefore, our company has superior location and facilitated traffic and the logistics i...
Get in touch with us
Leave a Message, we will call you back quickly!