China Sewer Trenchless Pipeline Construction Rehabilitation No Digging Underground
China Sewer Trenchless Pipeline Construction Rehabilitation No Digging Underground

  1. China Sewer Trenchless Pipeline Construction Rehabilitation No Digging Underground
  2. China Sewer Trenchless Pipeline Construction Rehabilitation No Digging Underground
  3. China Sewer Trenchless Pipeline Construction Rehabilitation No Digging Underground
  4. China Sewer Trenchless Pipeline Construction Rehabilitation No Digging Underground

Sewer Trenchless Pipeline Construction Rehabilitation No Digging Underground

  1. MOQ: 40m
  2. Price: Variable
  3. Get Latest Price
Payment Terms T/T
Supply Ability 30 km per month
Delivery Time 15 working days
Packaging Details Normal
Material Hose
Diameter DN1450
Thickness 14mm
Length 60m
Environment Environment protection
Life 50 years
Brand Name DAO
Place of Origin Jiangsu, China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 30 km per month
Delivery Time 15 working days Packaging Details Normal
Material Hose Diameter DN1450
Thickness 14mm Length 60m
Environment Environment protection Life 50 years
Brand Name DAO Place of Origin Jiangsu, China
High Light trenchless rehabilitation of underground pipesDAO trenchless rehabstrenchless sewer rehabilitation

Trenchless rehab construction for no-digging repair underground sewages

 

Liner pulls in

 

1) Before pulling in the hose, it is advisable to set up a roller or fixed pulley at the wellhead and pipe orifice where the traction direction is changed. The roller or fixed pulley should be positioned and fixed with a lead screw. In the process of pulling in the hose, the place that may be in direct contact with other objects should be padded with protective film.

2) The connection between the hose and the winch traction wire rope shall meet the following requirements:

The hoist shall be placed in the opposite well of the hose blanking opening. The hoist shall be reliably specified, and the power-on test shall be normal;

The universal hook shall be selected for the hook between the front end of the hoist wire rope and the material connecting part to ensure that the hose can smoothly enter the pipe during the traction of the hoist;

Pull the steel wire rope through the pipe and connect with the hose through the pull rope inserted during the bottom membrane insertion.

3) Pretreatment of the hose before blanking

First, fold the two sides of the hose material with the end length of about 0.5m inward by 1/3, then fold it longitudinally, and place a lifting belt at the bottom of the folding line (the lifting belt is connected with the winch hook);

The folded part shall be fastened with 2 straps, and the outside shall be wrapped with a bottom film for protection,

4) Pull the hose. The hose pulled into the old pipe shall meet the following requirements:

Start the hoist, the pulling speed shall be controlled within 5m/min, the inching operation can be carried out according to the feeding condition of the hose, and the contact between the hose end and the hoist operator shall be maintained. It is recommended to use the interphone for real-time call control;

In the process of pulling in the hose, the operators at the end of the hose shall ensure that the bottom film does not move, and check the laying of the hose to see if it moves smoothly on the bottom film;

When the length of the hose outside the well mouth is close to the depth of the well, the winch shall be stopped, the tail of the hose shall be fastened with the thick rope with a tie, and the thick rope shall be tightened in the direction, and the winch shall be started again until the tail of the hose exceeds the pipe mouth by about 0.5m.

 

 

 How  No digging
 Application  Public or private sewers
 Length  Any length is possible

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2012

  • Total Annual:

    40000000-45000000

  • Employee Number:

    150~200

  • Ecer Certification:

    Verified Supplier

Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world.   The product range covers four series and more than 20 models in ... Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world.   The product range covers four series and more than 20 models in ...

+ Read More

Get in touch with us

  • Reach Us
  • Daoyunai Energy Saving Technology Limited
  • Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city 201616
  • https://www.cipp-uv.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement