Payment Terms | T/T |
Supply Ability | 30 km per month |
Delivery Time | 15 working days |
Packaging Details | Normal |
Material | Hose |
Diameter | DN1450 |
Thickness | 14mm |
Length | 60m |
Environment | Environment protection |
Life | 50 years |
Brand Name | DAO |
Place of Origin | Jiangsu, China |
View Detail Information
Explore similar products
Pvc Pipe Trenchless Point Repair Relining Protective Bottom Film Installing
Underground Trenchless Pipeline Construction Machine UV CIPP Sewage Network
UV CIPP Trenchless Pipeline Construction Special Rope Guide Underground
Cast Iron Trenchless Drain Pipe Repair Inspection Cable Tray Reciprocating Shaft
Product Specification
Payment Terms | T/T | Supply Ability | 30 km per month |
Delivery Time | 15 working days | Packaging Details | Normal |
Material | Hose | Diameter | DN1450 |
Thickness | 14mm | Length | 60m |
Environment | Environment protection | Life | 50 years |
Brand Name | DAO | Place of Origin | Jiangsu, China |
High Light | trenchless rehabilitation of underground pipes ,DAO trenchless rehabs ,trenchless sewer rehabilitation |
Trenchless rehab construction for no-digging repair underground sewages
Liner pulls in
1) Before pulling in the hose, it is advisable to set up a roller or fixed pulley at the wellhead and pipe orifice where the traction direction is changed. The roller or fixed pulley should be positioned and fixed with a lead screw. In the process of pulling in the hose, the place that may be in direct contact with other objects should be padded with protective film.
2) The connection between the hose and the winch traction wire rope shall meet the following requirements:
The hoist shall be placed in the opposite well of the hose blanking opening. The hoist shall be reliably specified, and the power-on test shall be normal;
The universal hook shall be selected for the hook between the front end of the hoist wire rope and the material connecting part to ensure that the hose can smoothly enter the pipe during the traction of the hoist;
Pull the steel wire rope through the pipe and connect with the hose through the pull rope inserted during the bottom membrane insertion.
3) Pretreatment of the hose before blanking
First, fold the two sides of the hose material with the end length of about 0.5m inward by 1/3, then fold it longitudinally, and place a lifting belt at the bottom of the folding line (the lifting belt is connected with the winch hook);
The folded part shall be fastened with 2 straps, and the outside shall be wrapped with a bottom film for protection,
4) Pull the hose. The hose pulled into the old pipe shall meet the following requirements:
Start the hoist, the pulling speed shall be controlled within 5m/min, the inching operation can be carried out according to the feeding condition of the hose, and the contact between the hose end and the hoist operator shall be maintained. It is recommended to use the interphone for real-time call control;
In the process of pulling in the hose, the operators at the end of the hose shall ensure that the bottom film does not move, and check the laying of the hose to see if it moves smoothly on the bottom film;
When the length of the hose outside the well mouth is close to the depth of the well, the winch shall be stopped, the tail of the hose shall be fastened with the thick rope with a tie, and the thick rope shall be tightened in the direction, and the winch shall be started again until the tail of the hose exceeds the pipe mouth by about 0.5m.
How | No digging |
Application | Public or private sewers |
Length | Any length is possible |
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2012
Total Annual:
40000000-45000000
Employee Number:
150~200
Ecer Certification:
Verified Supplier
Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world. The product range covers four series and more than 20 models in ... Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world. The product range covers four series and more than 20 models in ...