Payment Terms | T/T |
Supply Ability | 500 units per year |
Delivery Time | 15 working days |
Packaging Details | Normal box |
Material | High strength steel |
Unit | Frame, motor |
Length | 20-40mm |
Weight | 3kg |
Color | Black and white |
Life | 10 years |
Brand Name | DAO |
Model Number | D18 |
Place of Origin | Jiangsu, China |
View Detail Information
Explore similar products
Drain Sewer Inspection Crawler Camera System Mini CCTV Small Pipe DN200-400
D18 CCTV Pipeline Crawler Sewer Camera Systems Drainage Inspection DN200-1200
D18s Mini Cctv Crawler Camera Pipe Video Inspection System For Underground
Automatic Cctv Pipe Crawler Plus Sewer Stormwater Pipe Inspection Camera
Product Specification
Payment Terms | T/T | Supply Ability | 500 units per year |
Delivery Time | 15 working days | Packaging Details | Normal box |
Material | High strength steel | Unit | Frame, motor |
Length | 20-40mm | Weight | 3kg |
Color | Black and white | Life | 10 years |
Brand Name | DAO | Model Number | D18 |
Place of Origin | Jiangsu, China | ||
High Light | Robotic CCTV Pipe Crawler DAO ,Robotic CCTV Pipes Crawler DAO ,pipeline crawlers DAO |
Special lifting frame of professional pipeline CCTV inspection equipment robot
Basic requirements of UV CIPP CCTV inspection trenchless technology
The enclosure of the construction site shall be closed without a gap, and the construction equipment and materials shall not be placed outside the enclosure area.
The temporary parking area for engineering vehicles and the storage area for testing equipment shall be set in the pipeline testing operation area, and the spacing of each zone shall not be less than 1m. See attached Fig. 32 for the plane layout
The local repair work area shall be provided with a work vehicle parking area, material stacking area, and tools and equipment storage area. The safe distance between each partition and enclosure shall not be less than 050m. See attached Fig. 3.3 for the plane layout
The layout of the overall repair work area shall comply with the following provisions a) work vehicle parking area, material stacking area, tool, and equipment storage area, emergency material stacking area, and waste material stacking area shall be set, and the safe distance between each partition and enclosure shall not be less than 0.5m; b) The layout of the operation area and the laying down of facilities shall comply with the figure.
1 - construction signboard (nine signboards and one drawing); 2. One-shot flashing lamp (for night construction); 3 - traffic bucket; 4 - construction vehicles; 5-6-a warning light (for night construction) in the blanking area of construction operation; 7 - placement of construction equipment; 8 - pipe section to be operated; 9 - emergency materials storage area; 10 - stacking area of construction materials; 11 a traffic cone; 12. Auxiliary vehicles for construction; 13 - temporary stacking area for construction waste; 14 - safety fence
Function: | Lifting CCTV camera |
Temperature: | -10°C-55°C |
Power | Motor |
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2012
Total Annual:
40000000-45000000
Employee Number:
150~200
Ecer Certification:
Verified Supplier
Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world. The product range covers four series and more than 20 models in ... Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world. The product range covers four series and more than 20 models in ...
Get in touch with us
Leave a Message, we will call you back quickly!