China factories

China factory - QINGDAO SISOUL GRUOP

QINGDAO SISOUL GRUOP

  • China
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Concrete place boom
China Concrete place boom

  1. China Concrete place boom
  2. China Concrete place boom
  3. China Concrete place boom
  4. China Concrete place boom

Concrete place boom

  1. MOQ: 1 set
  2. Price: HGY 15--35
  3. Get Latest Price
Payment Terms L/C,T/T
Supply Ability
Delivery Time 5-8 days
Brand Name
Model Number HGY
Certification CE
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote

Explore similar products

  1. China Concrete Planetary mixer

    Concrete Planetary mixer

    Get Latest Price
  2. China Intensive concrete mixer

    Intensive concrete mixer

    Get Latest Price
  3. China Dry mortar mixing plant

    Dry mortar mixing plant

    Get Latest Price
  4. China Mobile concrete batching plant

    Mobile concrete batching plant

    Get Latest Price
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C,T/T Supply Ability
Delivery Time 5-8 days Brand Name
Model Number HGY Certification CE
Place of Origin China
The placing boom takes advantage of mature manufacturing platform of boom design of truck-mounted concrete boom from famous manufacturers. On the base of accuracy data, the boom structure is optimized through finite element analysis, modal analysis, dynamics simulation analysis and endurance test on model machine. The accuracy of design and data is assured through powerful test and industrial assess means. The same-class weld manufacturing technique is adopted for the boom, the quality is excellent. The placing range can be changed by assembling or disassembling the extension boom to meet different placing working condition more neatly.

Rotary table and slewing mechanism
The slewing support is a large-sized bearing which connects the boom and the column, and bears the overturning moment produced by the boom. It is a key component that directly affects the whole machine's safety. The motor redactor is from Comer in Italy. It is in a high speed rate, and long life span and reliable. The hydraulic motor can rotate the slewing table and the boom 365°through the redactor.----,,.Comer,,,.365°

Tubular column
The fortified tubular column is adopted. Deformation of the head of the tubular column is 20%~25% less than congener products, it improves the precision for pouring concrete and reduces vibration of the tube.,20%~25%,.The connecting structure parts are optimized, and the rigidity of the column is well and the vibration becomes less.


Climbing device

Two climbing modes are for choice: climbing device on floor and climbing device in elevator well. The climbing structure has been optimized and inclined block auxiliary structure is adopted in the tubular column. All can eliminate the error effectively for drilling holes in the floor.


Hydraulic system
The power system adopts electrical engine and plunger pump with high pressure, low flux pulse and low noise. Electro-hydraulic stacked directional valves arein good performance and good working condition.Balance valves are from Oil Control, they can support safe guard for boom movement.


Electric control system
The advanced and reliable electricity equipment: concrete placing boom has the advanced digital technology control. The electric control box has the flexible outside, excellent manufactory crafts. This equipment runs the high-smart control system reliable, steadily and safely in boom control.
It's all equipped with electric elements from aboard with high reliability. Electric control is comfortable for wired remote control and wireless remote control are all in.

Vulnerable part
Straight pipe adopts special quench heat treatment which makes the pipe's life is longer than 30000 m3
This series of concrete distributor have reasonable design and reliable structure. The placing structure adopts 360° rotary arm support. The machine is operated by hands and can rotate flexibly. The tower is of aproper height so you can change the placing position freely only by pulling the robe easily. So it is highly efficient, reliable and economic.


ModelUnitsHGY29C
PerformanceMax.radius of placing boomm28.9
Freestanding height (to the joint between the end of the boom and swivel table)
()
m22.7
Boom articulation°400
Slewing brake/always close
Working temperatureºC0ºC~60ºC
Total weightkg19100
Counter weightkgHave no
Power/380V/50HZ
MotorModel/Y2-160M-4
PowerkW11
Hydraulic systemPressureMPa30
Fluxl/min18
Hydraulic oilCircumstance temperature35ºC-50ºC35ºC-50ºC/L-HM 68
Circumstance temperature5ºC-35ºC5ºC-35ºC/L-HM 46
Circumstance temperature -15ºC-5ºC-15ºC-5ºC/L-HM 32
Control mode/Short-haul Control /radio remote control/
Pipeline cleaning/Wet cleaning/Dry cleaning
/
Structure of tower body/Tubular column
Section of tower bodym×m0.75×0.75
BoomShape/Three hydraulic foldable arms
R
Inner diameter of pipelinemmDN125
End hose″×mm5″×3000
1st sectionLengthm11.5
Articulation°0°~82.5°
2nd sectionLengthm9.3
Articulation°0°~180°
3rd sectionLengthm8.1
Articulation°0°~180°
ClimbingClimbing mode/By hydraulic cylinder climbing
Interval of climbingm0.52
Floor frame/Hole prepared in floor
Shaft framemHole prepared in floor
2.0~2.7
Min.Interval of climbing frameClimbingm3.0
Placing concretem6.0
Restm6.0
ModelUnitsHGY33E
PerformanceMax.radius of placing boomm33
Freestanding height (to the joint between the end of the boom and swivel table)
()
m22.7
Boom articulation°400
Slewing brake/always close
Working temperatureºC0ºC~60ºC
Total weightkg21200
Counter weightkgHave no
Power/380V/50HZ
MotorModel/Y2-160L-4
PowerkW15
Hydraulic systemPressureMPa30
Fluxl/min18
Hydraulic oilCircumstance temperature35ºC-50ºC35ºC-50ºC/L-HM 68
Circumstance temperature5ºC-35ºC5ºC-35ºC/L-HM 46
Circumstance temperature -15ºC-5ºC-15ºC-5ºC/L-HM 32
Control mode/Short-haul Control /radio remote control/
Pipeline cleaning/Wet cleaning/Dry cleaning
/
Structure of tower body/Tubular column
Section of tower bodym×m0.75×0.75
BoomShape/Three hydraulic foldable arms
R
Inner diameter of pipeline
m12.38
Articulation°0°~82.5°
2nd sectionLengthm10.93
Articulation°0°~180°
3rd sectionLengthm9.69
Articulation°0°~180°
ClimbingClimbing modeBy hydraulic cylinder climbing

Interval of climbingm0.52
Floor frame/Hole prepared in floor
Shaft framemHole prepared in floor
2.0~2.7
Min.Interval of climbing frameClimbingm3.0
Placing concretem6.0
Restm6.0




Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Year Established:

    1993

  • Total Annual:

    18000000

  • Employee Number:

    300-400

  • Ecer Certification:

    Active Member

 located in Qingdao,the beautiful seashore holiday city of China.Since we were founded in 1993,we combine technical research,production,sales and international sales together and become a manufacture specializes in construction machinery.  "Quality to survive, rely on scientific and technol...  located in Qingdao,the beautiful seashore holiday city of China.Since we were founded in 1993,we combine technical research,production,sales and international sales together and become a manufacture specializes in construction machinery.  "Quality to survive, rely on scientific and technol...

+ Read More

Get in touch with us

  • Reach Us
  • QINGDAO SISOUL GRUOP

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement