Supply Ability | 20 sets per month |
Delivery Time | 40-50 working days |
Packaging Details | iron frame /plate |
Payment Terms | TT |
Processing | Beer Canning Line |
Filling material | Beer |
Filling type | CO2 Injecting, temperature 0-4 degree |
Filling container | Aluminum can, 33CL OR 500CL |
Cap | Easy-open lid |
Package | Manual collecting |
warranty | 12 months |
Brand Name | CGET |
Model Number | CGET- |
Certification | CE, UL,ISO |
Place of Origin | China |
View Detail Information
Explore similar products
Wine Brewery Production Line Automatic Bottle Washing Filling And Capping
100L Beer Production Line Wine Testing Equipment SUS 304 1 Year Warranty
Proposal Brewery Production Line Automatic Bottle Water Washing Filling Capping
Auto Stainless Steel Beer Canning Machine Adjustable Voltage 1000cph - 2000cph
Product Specification
Supply Ability | 20 sets per month | Delivery Time | 40-50 working days |
Packaging Details | iron frame /plate | Payment Terms | TT |
Processing | Beer Canning Line | Filling material | Beer |
Filling type | CO2 Injecting, temperature 0-4 degree | Filling container | Aluminum can, 33CL OR 500CL |
Cap | Easy-open lid | Package | Manual collecting |
warranty | 12 months | Brand Name | CGET |
Model Number | CGET- | Certification | CE, UL,ISO |
Place of Origin | China | ||
High Light | bottling production line ,brewery production line |
Semi Automatic Beer Canning Line Stainless Steel 304 1000 CPH - 2000 CPH
Brief technical date base of beer canning machine:
1. Rated capacity: 1000-2000CPH,
2. Filling material: Beer
3. Filling type: CO2 Injecting, temperature 0-4 degree
4. Filling container: Aluminum can, 33CL OR 500CL
5. Cap: Easy-open lid
6. Package: Manual collecting
7. Power generator: To be confirmed, same to China
8. Conveyor mode: Flat conveyor
9. Voltage: can be custom-made
10. Condition: Temperature: 2-25℃
Part three: Plant Layout for Reference
1) Two different working process for your reference
(1) Fully automatic line ( with can depalletizer )
(2) Semi- automatic line (manual unload cans)
2) Two different 3D layout drawing for your reference
(1) Fully automatic line ( with can depalletizer )
(2) Semi- automatic line (manual unload cans)
No. The above beer canning line is designed according to our former client’s workshop specification for your reference.
Part four. Equipment List and Quotation
Quotation:
NO. | Name | Model | Qty | Capacity | Price(USD) |
Beer Canning Machine(1000-2000CPH) | |||||
1 | Can Depallitizer | GD-XD-2000 | 1 | 1000-2000CPH | |
2 | Can rinser and twister | GD-CF-1 | 1 | 1000-2000CPH | |
3 | Can Filling-Sealing 2-in-1 machine | GD-GF-12/1 | 1 | 1000-2000CPH | |
4 | Level Detector | GD-YWJ-1 | 1 | 1000-2000CPH | |
5 | Can twister | GD-NF | 2 | 1000-2000CPH | |
6 | Can Dryer | GD-FG-02 | 1 | 1000-2000CPH | |
7 | Date Printer | GD-PM | 1 | 1000-2000CPH | |
8 | Download table | GD-XP | 1 | 1000-2000CPH | |
Total Price: |
Note:
1) Payment
Price term: EXW Jinan, China. It is valid within 14 working days.
Payment: T/T.
50%: The buyer should pay the deposit within 10 working days after signed contract.
50%: The buyer should pay after inspection.
The above quotation is based on machines only, not include related conveyors.
2) Production, Inspection, Delivery, Packing & Shipping, Installation, Debug, Training and After Sales
A. Production
The 1000-2000CPH beer canning line will be designed & produced according to your can’s specification. Therefore, you have to send us 100 cans and 200 caps sample for our designation & production and testing within 10 working days after signed contract.
B. Inspection
When this machine is finished, we will invite you to inspect and we will test this machine with water for you.
C. Delivery
Delivery time is 60 working days after receive the can and cap sample.
D. Packing and shipping
Packing way: Iron packing outside.
E. installation, debug
Time (30 working days):
This machine needs about 20 working days for installation & testing and 10 working days for training client’s related workers.
Related fees:
The buyer needs to supply the air tickets, accommodation, visa fees and salary. Salary for engineer is 120USD per day and 80USD per day for technician.
Preparing work:
Customer needs to place the equipments according to plane layout and prepare for related tools after equipment arrived. We will arrange seasoned engineer and technician to get visa in time for installation debug after equipment leaving our factory.
F. training
Our company offer technology training to customer. The content of training is structure and maintenance of equipments, control and operation of equipments. Training is in the workshop of customer. Seasoned technician will guide and establish training outline. After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures.
C. Quality guarantee
We promise that our goods are all new and not used. They’re made of suitable material, adopt new design. The quality, specification and function all meet the demand of contract. We promise that the products of this machine could storage for one year without adding any aseptic.
1. After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price. In quality guarantee, the technician of buyers should operate and maintain the equipments according to seller’s demand, debug some failures. If you could not solve the problems, we will guide you by phone or video within 24 hours; if the problems are still cannot solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician.
2. After quality guarantee, we offer technology support and after sales service. Offer wearing parts and other spare parts at favorable price; after quality guarantee, the technician of buyers should operate and maintain the equipments according to seller’s demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still cannot solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician.
4) Time consumption (about 120 working days):
Production: 60 working days.
Inspection: 2 working days.
Packing: 1 working day.
Shipping: 30 days from our workshop to your brewery.
Installation and training: 30 working days.
Part five: Beer Canning Line Introduction
1. Can Depallitizer
Can depalletizer are mainly used in unloading tinplate and aluminium cans operations. It stacks the empty cans on a pallet, pushes the top-down level by level to the conveyor, and then sends cans to the empty cans spray washing machine by conveyor. This machine replaces the manual way of putting cans in order and saves manpower.
The new fully automated can depalletizer reduces labor costs, removes continuous use of forklift for daily operations and decreases overall footprint. It also reduces can loading to twice per eight hour shift while easily adapting to any can format with no programming or equipment configuration changes.
The depalletizer is built with an all stainless steel frame for improved durability and extended product lifespan.
Automatically removes and stacks tier sheets.
Continuously adapts to canning system speed, with a touch screen panel control.
(3) Technology Data:
Depalletizer | ||
No. | 1 | |
Make | Gongda Packaging Technology | |
Capacity | cph | 1000-2000 @ 12 fl oz |
Machine efficiency at full speed | % | >98,5 |
Product | New aluminium cans | |
Dimension of pallet | mm x mm | 1.015 x 1.215 |
Mechanical or Robotic action | Mechanical | |
HMI screen available with fault diagnosis | Yes | |
Operation height machine can accommodate | mm |
< 2.100 free space |
Offered de-palletiser identical in design to offered palletizer | Yes | |
Maximum speed machine can run | 135% profile to be 135% of filler | |
Number of dropped cans during machine handling | % | < 0,05 |
Pallet conveyors with frequency control | Soft start will be minimum standard | |
Full pallet infeed conveyor | Yes | |
Empty pallet outfeed conveyor | Yes | |
Pallet lift system | Yes | |
Automatic device to remove sheet separator | Yes | |
Length of accumulation table | m | 2.5m |
Automatic pusher bar | Yes | |
Length | mm | 3,000 |
Width | mm | 2,000 |
Height | mm | 3,600 |
Weight (empty / in operation) | kg | About 450kg |
Installed power | kw | 3kw |
Operator staircase and platform | Yes |
2. Can rinser and twister
It is mainly wash and sterilize cans inside and surface, all materials are stainless steel.
Rinser | ||
Max/min diameter of containers to be handled | mm | 50-80 |
Max/min height of containers to be handled | mm | 100-180 |
Machine efficiency at full speed | % | >98,5 |
Rinsing time at full load | sec | 2-3s |
Dripping time at full load | sec | 1-2s |
No can - no rinsing function | Yes | |
Sterile filter for rinsing medium | Yes | |
Rinsing medium | water |
3. Can Filling-sealing 2-1 unit Machine
1) Introduction
The beer canning-sealing unity machine is designed especially for microbreweries with rotary working type not linear working type. It has been extensively used to fill beer. Rotary running type is working stable taking up small area and with high speed. In China, Gongda is the firstly and sole manufacturer beer canning line for microbrewery. If you find Gongda, you will be very luck!
Filling Sealing
It adopts isobaric filling principle and filling valve adopts high precision mechanical valve. It has advantages of high precision in liquid level and realizing that it only starts to filling when there is a can, otherwise it will stop filling. Using the device structure of filling valve precover device plus supporting can bottom device, it can guarantee the maximum stability of cans when they passing in and out of the filling machine. Filling cylinder braces use worm-gear box going up and down to satisfy cans of different height. Float switches in the filling cylinder ensure a smooth liquid inlet.
The main transmission adopts gear transmission belt and gear box type exposed drive combination with advantages of high efficiency, low noise and smooth operation. It adopts frequency conversion stepless speed regulation and is controlled by PLC industrial computers. Sealing machine and filling machine are connected by hooks coupling universal coupling to make sure them a same working pace.
As to sealing machine, the machine has the control system that caps only come down when there are cans and caps will not come if there is no can below to ensure the machine run normally and reduce the cover loss rate.
Filling flow as below:
2) Technology parameter
Production capacity | 1000-2000CPH |
Number of Filling valve | 12 |
Number of sealing valve | 1 |
Power of machine | 3KW |
Compressed air consumption | 1.2m3/h(0.3Mpa) |
Sterile air consumption | 1.8m3/h(0.4Mpa) |
Water consumption | 0.2m3/h |
PLC | Mitsubishi or Simens |
Pneumatic control components | AIRTAC |
Bearing Sealing Machine | NTN |
Valve spring,Seals | HALLITE |
Pneumatic control valves,Butterfly | made in Taiwan |
Bearing | FAG Germany |
Net weight | 2200 Kg |
Packed gross weight | 2500 Kg |
Measurements | 7.2CBM |
Size of the machine | 2000*1400*2100mm |
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Seller
Year Established:
1997
Total Annual:
20000000-40000000
Employee Number:
200~500
Ecer Certification:
Site Member
dehui established in 1997,headquartered in Jinan,Shandong provide,registered capital 52,300,000,with more than 800 staff.The company is a High-tech enterprise on the fermentation field,and the productive modern service enterprise on the fermentation field.Provide the customers with the systemic solu... dehui established in 1997,headquartered in Jinan,Shandong provide,registered capital 52,300,000,with more than 800 staff.The company is a High-tech enterprise on the fermentation field,and the productive modern service enterprise on the fermentation field.Provide the customers with the systemic solu...
Get in touch with us
Leave a Message, we will call you back quickly!