Payment Terms | T/T, L/C, D/A, D/P, Western Union |
Supply Ability | 10 Set / Month |
Delivery Time | 30 days after receiving 30% deposit |
Packaging Details | Wooden case or by container |
Drying Shaker | TRZS585*1pc |
Vertical Cutting Dryer | TRCD930C*1pc |
High Speed Centrifuge | TRLW355N-1*1pc |
Sand Pump | TRSB4*3-11J*2pcs |
Centrifuge Slurry Pump | 80YZ50-20B81pc |
Screw Conveyor | TRL350*3000 |
Shale Shaker Tank | 3000*2150*1300mm |
Decanter Centrifuge Tank | 9000*2200*1300mm |
Brand Name | TR Solids Control |
Model Number | TRDWM-1 |
Certification | API Certificate, ISO Certified |
Place of Origin | Xi'an, China |
View Detail Information
Explore similar products
82.8KW Drilling Mud System , Large Scale Mud Circulation System In Drilling
High Efficiency Mud Tank System with Dewatering Centrifuge Mud Cleaning Systems
120m3/h Compact Drilling Mud System for TBM Project / Tunnel Boring Machine Mud
API Standard 200 GPM Drilling Mud Treatment And Disposal System with 4
Product Specification
Payment Terms | T/T, L/C, D/A, D/P, Western Union | Supply Ability | 10 Set / Month |
Delivery Time | 30 days after receiving 30% deposit | Packaging Details | Wooden case or by container |
Drying Shaker | TRZS585*1pc | Vertical Cutting Dryer | TRCD930C*1pc |
High Speed Centrifuge | TRLW355N-1*1pc | Sand Pump | TRSB4*3-11J*2pcs |
Centrifuge Slurry Pump | 80YZ50-20B81pc | Screw Conveyor | TRL350*3000 |
Shale Shaker Tank | 3000*2150*1300mm | Decanter Centrifuge Tank | 9000*2200*1300mm |
Brand Name | TR Solids Control | Model Number | TRDWM-1 |
Certification | API Certificate, ISO Certified | Place of Origin | Xi'an, China |
High Light | mud recycling system ,mud treatment system |
New Technology Drilling Waste Oil Sludge Management Equipment for Sale
Introduction
Drilling waste management is our latest researched and manufactured unit for a better environment protection and high working efficacy. Just as we know, oil and gas wells drilling fields will create waste in the drilling progress, which will be harmful to the environment. Therefore, we need drilling waste management unit to solve this kind of problem. Normally, with a good waste managementpractice, the amount of waste and the toxicity of waste will be reduced and bring a good environment for drilling fields.
In the process of oil and gas drilling, general shallow wells would use water-based mud, and deep wells would use oil-based mud, that makes conventional solids control equipment work effectively on recovery of heavy metal and stone and useful drilling fluid. However, these cutting fluids containing heavy metals and solids (presumably oil content at 12%~18%) would caused great damage on nearby vegetation, soil, groundwater and other natural environment building and human living environment if they are not managed to emissions.
Main Features of Drilling Waste Management Scheme:
Equipment List of TR Drilling Waste Management
S/N | S/N | Description |
1 | Vertical Cuttings Dryer | TRCD930 with option for VFD or fixed speed |
2 | Decanter Centrifuge | TRGLW355Centrifuge 14inch bowl,Optional model as below: TRGLW355 Centrifuge with VFD drive. TRGLW355 standard with fixed speed |
3 | Screw Pump | Two sets TRG30A-075 Screw Pump with capacity:30m³/h for each pump. One for taking fluids from catching tank to feed the decanter centrifuge,the other for flushing the Vertical dryer. |
4 | Skid with catching tank | Fast move skid for mounting all the equipment One Catching tank with capacity:4m³ for catching fluid from vertical cuttings dryer. |
5 | Telescopic Skid | Two telescopic skid with walkways and handrails for safe operation. One for mounting the decanter centrifuge to a higher position in order to allow the centrifuge discharged fluids feed to active mud system by gravity. The other telescopic skid for mounting and adjusting the height of the vertical cutting dryer to allow the discharge of drying cuttings |
6 | Electric Cradle | 0.5 Tons electric cradle for lifting the components of vertical dryer |
7 | Electric Control System | Two lighting system,electrical control boxes and cables and plugs for operation the complete system. |
Competitive Advantages
1. We offer high quality products at competitive price.
2. Shortest delivery time.
3. Flexible payment terms.
4. Timely after-sale service.
5. Most of our equipment can be replaceable with international brands.
6. Our products have been exported to Argentina, Egypt, US, Australia, Romania, Pakistan, Dubai, Abu Dhabi, Iran, India, Indonesia, Vietnam, Malaysia and many other countries.
Company Tenet
Customer's satisfaction is the highest pursuit of TR Solids Control.
Company Details
Business Type:
Manufacturer
Year Established:
2010
Total Annual:
40 Million-50 Million
Employee Number:
350~450
Ecer Certification:
Verified Supplier
Xi'An TianRui Petroleum Machinery Equipment Co.,Ltd. (For short: TR Solids Control) is a professional manufacturer of solids control equipment and mud recovery system, located in Xi'an City, China. Since 2010, TR Solids Control focused on the development and production of... Xi'An TianRui Petroleum Machinery Equipment Co.,Ltd. (For short: TR Solids Control) is a professional manufacturer of solids control equipment and mud recovery system, located in Xi'an City, China. Since 2010, TR Solids Control focused on the development and production of...
Get in touch with us
Leave a Message, we will call you back quickly!