China factories

China factory - Jinzhou City Shitan Machinery Equipment  CO. LTD.

Jinzhou City Shitan Machinery Equipment CO. LTD.

  • China,Jinzhou ,Hebei
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Sampling 3000kg ISO Crawler Track Undercarriage
China Sampling 3000kg ISO Crawler Track Undercarriage

  1. China Sampling 3000kg ISO Crawler Track Undercarriage
  2. China Sampling 3000kg ISO Crawler Track Undercarriage

Sampling 3000kg ISO Crawler Track Undercarriage

  1. MOQ: 1set
  2. Price:
  3. Get Latest Price
Payment Terms T/T, L/C, Western Union
Supply Ability 100/day
Delivery Time 5-7days
Packaging Details Wooden box
Drilling depth 200m
Condition new
Power Type: Diesel
Brand Name shitan
Model Number GK200
Place of Origin hebei,china
Certification ISO

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, L/C, Western Union Supply Ability 100/day
Delivery Time 5-7days Packaging Details Wooden box
Drilling depth 200m Condition new
Power Type: Diesel Brand Name shitan
Model Number GK200 Place of Origin hebei,china
Certification ISO
High Light 3000kg Crawler Track UndercarriageSampling Crawler Track UndercarriageISO rubber track undercarriage

Crawler Base Civil Engineering Core Sampling and Water Well Borehole Drilling Machine

 

 

Crawler Track Undercarriage Product Description

 

The chassis comes with four high-strength threaded legs(or Hydraulic high leg)the threaded legs install rate and adjust is fast and convenient, can be used for work plane leveling.It can make loading and unloading reduce the cost of to improve efficiency.It also can be used as auxiliary support when the track drilling rig is working. ·using 48V electric starting diesel engine is reduced the operate's labour intensity greatly.Especially in cold season,when diesel engine start hardly,it will show superiority vastly. ·the machine is equipped with BW-160 independent mud pump,the pump flow and pressure are big,the maintenance is convenient,the parts of the machine are convenient to buy all over the country.

 

Crawler Track Undercarriage parameter

 

GK200 crawler hydraulic core drilling rig
Drilling depth
200m
Maximum opening diameter
75-300mm
Final hole diameter
75mm
Kelly
53/59*4200mm
Drill pipe diameter
50/60mm
Drilling angle
90°-75°
Auxiliary power diesel engine
16.2kw 2200r/min
Structural weight/Size
3000kg 3800*1950*2700
Spindle
Spindle speed
64/128/287/557r/min
Spindle stroke
450mm
Windlass
Single rope lifting force
24kn
Single rope lifting speed
0.12/0.22/0.49/0.95m/s
Drum diameter
140mm
Wire rope diameter
13mm
Wire rope capacity
35m
Derrick
Rated load
5t
Effective height
6m
Tower leg specification
89mm

 

How to maintain a fully hydraulic water well drilling rig in winter

 

1. cleaning and maintenance:

The main parts for cleaning and maintenance of full hydraulic water well drilling rig in winter are the appearance of chassis and working device. Descaling and decontamination shall be carried out to keep the appearance of construction machinery clean and tidy. Meanwhile, attention shall be paid to whether the devices and components are damaged and whether the leakage parts are worn during the cleaning process, so as to make early preparations for the next maintenance.

2. replace gear oil and add lubricating grease:

The weather is dry in winter, especially the geological conditions of the construction site are complex, so it is more necessary to replace the gear oil of the full hydraulic water well drilling rig and add lubricant in time. While adding lubricant, check the wear condition, replace it in time, and clean the interior.

3. check the hydraulic system for leakage:

For most full hydraulic water well drilling rigs and anchor drilling rigs, the hydraulic system is used as the main component, and the role of the hydraulic system is extremely important. The temperature is particularly low in winter, and the seals of the hydraulic system of construction machinery will expand and contract, which is easy to cause leakage, and often has a certain impact on the normal operation of the hydraulic system. In order to avoid the leakage fault of the hydraulic system, the seals of the hydraulic system should be systematically inspected before entering the severe winter, and the seals at the leakage parts should be replaced in time.

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2010

  • Total Annual:

    8000000-15000000

  • Employee Number:

    100~120

  • Ecer Certification:

    Verified Supplier

Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers of si...

+ Read More

Get in touch with us

  • Reach Us
  • Jinzhou City Shitan Machinery Equipment CO. LTD.
  • Xiaoshang Village,Jinzhou City,Hebei province,China
  • https://www.drillingrigmachines.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement