Ecer asks for your consent to use your personal data to:
Personalised advertising and content, advertising and content measurement, audience research and services development
Store and/or access information on a device
Your personal data will be processed and information from your device (cookies, unique identifiers, and other device data) may be stored by, accessed by and shared with 135 TCF vendor(s) and 65 ad partner(s), or used specifically by this site or app.
Some vendors may process your personal data on the basis of legitimate interest, which you can object to by do not consent. Contact our platform customer service, you can also withdraw your consent.
{"title":"ST180 Pneumatic Borewell Machine","imgUrl":"https:\/\/img.chinax.com\/nimg\/82\/ba\/31a5c25f6c2c60a4564d7e936417-200x200-1\/st180_pneumatic_borewell_machine.jpg","attrs":{"Brand Name":"shitan","Model Number":"ST-180","Certification":"iso","Place of Origin":"hebei china"}}
{"title":"Rubber Tire 17KN 200 Meters Water Well Drill","imgUrl":"https:\/\/img.chinax.com\/nimg\/0e\/aa\/8e3f725f10f8819f3739572b73df-200x200-1\/rubber_tire_17kn_200_meters_water_well_drill.jpg","attrs":{"Brand Name":"ShiTan","Model Number":"ST-300","Certification":"ISO,CE,SGS,TUV,BV","Place of Origin":"China"}}
{"title":"Civil Construction 2000m 75kw Water Well Drill Rig","imgUrl":"https:\/\/img.chinax.com\/nimg\/e8\/c7\/499340f72d14e3cd8e3130564d3c-200x200-1\/civil_construction_2000m_75kw_water_well_drill_rig.jpg","attrs":{"Brand Name":"ShiTan","Model Number":"ST-600","Certification":"ISO9001","Place of Origin":"CHINA"}}
ST 300 Crawler Type Small Water Well Drilling Rig 300 Meter Pneumatic Drill Rig
ST300 crawler type pneumatic drilling rig
1. The range of application of ST300 crawler type gas drilling rig
Applicable to civil engineering drilling, geothermal drilling, drilling with large diameter and deep drilling footage, fast, flexible and efficient.
2. The technical parameter of ST300 crawler type gas drilling rig
model
ST 300
Gross weight
T
8.8
Dimension
mm
4350*1850*2750
Aperture
mm
140-325
Drilling depth
m
300
Feed stroke
mm
6000
Travel speed
km/h
2
Grade ability
Max.
30°
Rising height from ground
mm
230
Wind pressure
Mpa
1.7-3.3
Air consumption
m³/min
23
Engine power
kw
85
Rotary speed
rpm
55-115
Rotation torque
N.m
7200-8500
How the drilling machine works and matters needing attention in the construction process
1. According to the water yield requirements of the well, the depth and diameter of the well are designed, and the drilling machine and corresponding auxiliary equipment are selected according to the formation conditions.
2. Before drilling, machine platform leveling, equipment layout, equipment storage, tower erection and drilling rig placement shall be done well.
3. Drilling in the loose formation, using percussive drilling machine water pressure step by step reaming construction technology.
4. Rotary core drilling is used to drill holes in bedrock aquifer.
5. In the process of drilling, the description should be made according to the technical requirements, and the layered soil samples, water samples and temperature measurement should be taken. The quality and quantity of sampling should be guaranteed.
There are seven points for attention in the construction process of drilling machine
1. The operators of water well drilling rig shall be trained and qualified and take up the post with certificate.
2. The equipment entering the site shall meet the construction requirements, and the trial operation test shall be conducted before the formal start-up of the well drilling rig, and the operation status shall be stated in time.
3. The specific drilling process should be prepared, the operation rules and standards of water well drilling equipment should be prepared, and the construction records should be made.
4. During the drilling process, it is not allowed to rotate until the planned elevation is reached. Maybe if the drill pipe needs to be rotated or raised under special circumstances, the drill pipe should be lifted to the surface, and the bit valve should be dredged and closed from the beginning. The operator should strictly control the descent speed and rotation speed of the threaded bit.
5. Before drilling, carefully check whether the air hole at the top of the core pipe is smooth, whether the concrete delivery hose joint is outstanding, and whether there is distorted appearance.
6. In the process of hole forming, when the drill pipe is found shaking or the footage is slow, the footage should be slowed down to avoid pile hole deflection, displacement and damage of drill pipe and drilling tool.
Company Details
Bronze Gleitlager
,
Bronze Sleeve Bushings
and
Graphite Plugged Bushings
from Quality China Factory
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
8000000-15000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and
processing company for core drilling rigs, crawler drilling rigs, various track chassis, various
types of mud pumps, various track transport vehicles, etc. It is one of the outstanding
manufacturers of si... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and
processing company for core drilling rigs, crawler drilling rigs, various track chassis, various
types of mud pumps, various track transport vehicles, etc. It is one of the outstanding
manufacturers of si...