Products
Manufacturer of a wide range of products which include OPGW Stringing Operations With Live Line Double Sheave Support Roller SH2 2.2kg,SKL Model Conductor Come Along Clamps Transmission Line Tools,32kn Tirfor Cable Puller Winch Ov...
MOQ: 20
Price: Get the latest
Packaging Details | Wooden case packed |
Delivery Time | 3-7days |
Payment Terms | T/T |
Supply Ability | 4000 sets/month |
Weight (kg) | 2.2 |
Working load (KN) | 2 |
Appication | OPGW Stringing Operations |
Name | Double Sheaves Replacer Roller |
Dimension (mm) L x W x H | 128 X 65 X 365 |
Model | SH2-OPGW2 |
Brand Name | NBLK |
Model Number | SH2-OPGW2 |
Place of Origin | NINGBO CHINA |
Certification | ISO CE |
MOQ: 10sets
Price: Get the latest
Payment Terms | T/T, L/C, Western Union |
Supply Ability | 10000 pcs/month |
Delivery Time | 3-8 work days |
Packaging Details | Wooden case |
Diameter of Conductor | Max 48mm |
Material | Aluminum alloy or alloy steel |
Type of Come along clamp | Automatic or Bolted |
Working load | Max. 15 Tons |
Description | Conductor Come along Clamps |
Model | SKL-40 SKL-50 SKL-60 SKGF-7A SKGF-9A |
Brand Name | Lingkai |
Model Number | SKL-40 SKL-50 SKL-60 SKGF-7A SKGF-9A |
Certification | ISO |
Place of Origin | Ningbo |
MOQ: 2 sets
Price: Get the latest
Payment Terms | L/C, T/T |
Supply Ability | 5000sets/month |
Delivery Time | 3-8 work days |
Packaging Details | Wooden case |
Working Load | 8/16/32 KN |
diameter of wire rope | 8/11.6/16 mm |
Hand operated force | 343 / 400 / 441 N |
Transmission line stringing tools | Tirfor hand winch |
Stroke | 40MM |
Standard length of wire rope | 20 Meter |
Weight | 6.8 / 13 / 25 kg |
Packing | plywood case |
Brand Name | Lingkai |
Model Number | HSS 408 416 432 |
Certification | ISO |
Place of Origin | NINGBO |
MOQ: 20
Price: Get the latest
Packaging Details | Wooden case packed |
Delivery Time | 3-7days |
Payment Terms | T/T |
Supply Ability | 4000 sets/month |
Appication | OPGW Stringing Operations |
Weight (kg) | 2.2 |
Name | Double Sheaves Replacer Roller |
Working load (KN) | 2 |
Dimension (mm) L x W x H | 128 X 65 X 365 |
Model | SH2-OPGW2 |
Brand Name | NBLK |
Model Number | SH2-OPGW2 |
Place of Origin | NINGBO CHINA |
Certification | ISO CE |
MOQ: 20
Price: Get the latest
Packaging Details | Wooden case packed |
Delivery Time | 3-7days |
Payment Terms | T/T |
Supply Ability | 4000 sets/month |
Appication | OPGW Stringing Operations |
Name | Double Sheaves Replacer Roller |
Weight (kg) | 2.2 |
Dimension (mm) L x W x H | 128 X 65 X 365 |
Working load (KN) | 2 |
Model | SH2-OPGW2 |
Brand Name | NBLK |
Model Number | SH2-OPGW2 |
Place of Origin | NINGBO CHINA |
Certification | ISO CE |
MOQ: 20
Price: Get the latest
Packaging Details | Wooden case packed |
Delivery Time | 3-7days |
Payment Terms | T/T |
Supply Ability | 4000 sets/month |
Model | SH2-OPGW2 |
Dimension (mm) L x W x H | 128 X 65 X 365 |
Appication | OPGW Stringing Operations |
Name | Double Sheaves Replacer Roller |
Working load (KN) | 2 |
Weight (kg) | 2.2 |
Brand Name | NBLK |
Model Number | SH2-OPGW2 |
Place of Origin | NINGBO CHINA |
Certification | ISO CE |
MOQ: 20
Price: Get the latest
Packaging Details | Wooden case packed |
Delivery Time | 3-7days |
Payment Terms | T/T |
Supply Ability | 4000 sets/month |
Name | Double Sheaves Replacer Roller |
Model | SH2-OPGW2 |
Weight (kg) | 2.2 |
Working load (KN) | 2 |
Dimension (mm) L x W x H | 128 X 65 X 365 |
Appication | OPGW Stringing Operations |
Brand Name | NBLK |
Model Number | SH2-OPGW2 |
Place of Origin | NINGBO CHINA |
Certification | ISO CE |
MOQ: 20
Price: Get the latest
Packaging Details | Wooden case packed |
Delivery Time | 3-7days |
Payment Terms | T/T |
Supply Ability | 4000 sets/month |
Dimension (mm) L x W x H | 128 X 65 X 365 |
Name | Double Sheaves Replacer Roller |
Weight (kg) | 2.2 |
Appication | OPGW Stringing Operations |
Model | SH2-OPGW2 |
Working load (KN) | 2 |
Brand Name | NBLK |
Model Number | SH2-OPGW2 |
Place of Origin | NINGBO CHINA |
Certification | ISO CE |
MOQ: 20
Price: Get the latest
Packaging Details | Wooden case packed |
Delivery Time | 3-7days |
Payment Terms | T/T |
Supply Ability | 4000 sets/month |
Dimension (mm) L x W x H | 128 X 65 X 365 |
Name | Double Sheaves Replacer Roller |
Working load (KN) | 2 |
Appication | OPGW Stringing Operations |
Weight (kg) | 2.2 |
Model | SH2-OPGW2 |
Brand Name | NBLK |
Model Number | SH2-OPGW2 |
Place of Origin | NINGBO CHINA |
Certification | ISO CE |
MOQ: 1
Price: Get the latest
Packaging Details | Wooden case packed |
Delivery Time | 3-5 days |
Payment Terms | T/T |
Supply Ability | 2000 sets/month |
Electric Motor | 100YYJ140-3 (140W) |
Dimension | 447x488x763 Mm. |
Running Speed (m/min) | 17 |
Wire Size Range (mm) | Ø9-26 |
Horizontal Tensile Strength (N) | 350 |
Climbing Angle | 31 Degree |
Petrol Engine Model | YK950/650W |
Remote Control distance | 300-500m |
Brand Name | NBLK |
Model Number | ZZ350 ZN350 |
Place of Origin | NINGBO CHINA |
Certification | ISO CE |
Explore more categories
Get in touch with us
Leave a Message, we will call you back quickly!