Payment Terms | T/T, Western Union |
Supply Ability | 50000PCS/Month |
Delivery Time | 6 Days |
Packaging Details | Cartons |
Material | Red Copper |
Current | 1000A |
Plant | Silver |
ID | 23.5mm |
Brand Name | QIUPU |
Model Number | GC4-1000A |
Certification | IEC |
Place of Origin | WENZHOU |
View Detail Information
Explore similar products
GC4-1250A Copper Electrical tulip jaw contact 15 Pins For Vacuum Circuit Breaker
GC4-2500A Copper Electrical tulip jaw contact 24 Pins For Vacuum Circuit Breaker
400A Electrical Tulip Jaw Copper Electrical Contacts 4 Pins VCB Vacuum Circuit
630A Copper Electrical Contacts 6 Pins For Medium Voltage Indoor Vacuum Circuit
Product Specification
Payment Terms | T/T, Western Union | Supply Ability | 50000PCS/Month |
Delivery Time | 6 Days | Packaging Details | Cartons |
Material | Red Copper | Current | 1000A |
Plant | Silver | ID | 23.5mm |
Brand Name | QIUPU | Model Number | GC4-1000A |
Certification | IEC | Place of Origin | WENZHOU |
High Light | tulip contacts ,silver plating electrical contacts |
GC4-1000A Copper Electrical tulip jaw contact 10 Pins For Vacuum Circuit Breaker
Installation requirements
(1) All parts and components before installation must pass the inspection.
(2) The tools and tools for installation shall be clean and meet the assembly requirements. When fastening the fastener, use a wrenches or clubs, socket wrenches, screw near the arc extinguisher room, and do not use live wrenches.
(3) The installation order shall comply with the installation procedure, and the fastener specifications installed in each component shall be adopted in accordance with the design requirements. In particular, the bolt fixed at the end of the static contact in the arc extinguishing chamber must not be mistaken in its length specification.
(4) The distance between the poles after assembly and the distance between the upper and lower qualifying lines shall meet the requirements of the size of the pattern. (5) After each rotating and sliding part is assembled, it shall move freely, and grease the moving friction place.
(6) After the adjustment test is passed, it should be cleaned and cleaned. The adjustable connection parts of each component should be marked with red paint, and the outlet end should be painted on the forest and sealed with clean paper.
Different uses, Zhongzhigui is commonly known as KYN28 cabinet, handcart type high voltage switchgear, generally used to protect back-end Transformers, or other high pressure load. The ring net cabinet is mainly used for the distribution of high voltage power supply. The cabinet is mainly used for high pressure load protection. Ring net cabinet with air insulation, and a fully closed filling cabinet? In both cases, the air insulation is connected to a system using a common SF6 load switch through a copper row, while a fully closed filling tank has a special connection device in addition to the power inlet and outlet line, and the cabinet is connected to the cabinet in a complete gas chamber filled with SF6 gases.The use of the cabinet is mainly 10KV system electrical distribution room, circuit breaker and metering unit can be removed, for handcart type structure, line and feed protection is more complete, rated current is 630 ~ 3150A; (1) The use of the cabinet is mainly 10KV system power distribution room, circuit breaker and metering unit can be removed, for the handcart structure, the line and feed protection is more complete, the rated current is generally 630 ~ 3150A, the ring network cabinet is generally used in the medium pressure secondary distribution or box change, the advantage is a fixed structure small volume, most of the vacuum or 6 gas insulation, but the rated 12 circuit breaker is less than the use of the general maintenance of the load, there is gas production of the switch. Mainly used in systems below 1000 KVA Transformers. The ring net ark originally serves as the ring net connection, this is the ring net ark name reason. Because it is the use of the ring network, it only needs to be divided rated current, short circuit current division does not need it(do not understand please consider carefully). So the loop cabinet just needs a load switch, not a fuse.
Company Details
Business Type:
Exporter,Trading Company,Seller
Year Established:
2016
Total Annual:
200000-500000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Wenzhou Qiupu Electric Power Co., Ltd. is located in Yueqing Economic Development Zone, Zhejiang Province. It is a high-tech enterprise specializing in the research and development, production and sales of electric power products such as circuit breakers, transformer... Wenzhou Qiupu Electric Power Co., Ltd. is located in Yueqing Economic Development Zone, Zhejiang Province. It is a high-tech enterprise specializing in the research and development, production and sales of electric power products such as circuit breakers, transformer...
Get in touch with us
Leave a Message, we will call you back quickly!