Payment Terms | L/C, T/T |
Supply Ability | 50pcs/month |
Delivery Time | 10-20days |
Packaging Details | bubble package |
matirial | Q550 |
max digging reach | 30m |
processing | advanced equipment |
welding | auto machine |
quality | very reliable |
produce time | 45 day |
Brand Name | hongbang |
Model Number | |
Certification | CE,ISO9001 |
Place of Origin | China |
View Detail Information
Explore similar products
Sea Port Construction Excavator Boom And Stick 30m Max Digging For Excavator
12-30m Long Reach Excavator Booms Stick Machanized Processing One Year Warranty
Durable Digging Long Reach Excavator Booms And Stick For Dredging River Depth
Dredging River / Demolition Long Reach Arm Boom For Excavators CE Approval
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 50pcs/month |
Delivery Time | 10-20days | Packaging Details | bubble package |
matirial | Q550 | max digging reach | 30m |
processing | advanced equipment | welding | auto machine |
quality | very reliable | produce time | 45 day |
Brand Name | hongbang | Model Number | |
Certification | CE,ISO9001 | Place of Origin | China |
High Light | long reach boom and stick ,excavator boom and arm |
32 meter super long reach booms for excavator cat6018 to construction the port
1, Long reach boom are use for dredging rivers port construction, railway construction and groundwork construction, with high extensive operation scope, high efficiency and high security.
2, Our company established on years 2007, we have over 10 years experience in designing and customize the long reach boom for all brand excavators.
3, Applicable for all the excavator model,OEM service is also available.
4, Advanced manufacturing process, Technique is in the line with global standards.
5, We have all the installation dimensions of most excavator, we can customize this long reach boom for your excavator.
6, The main material of this long boom is Q345B + Q690D.
7, The long reach boom include lubricant pipe system, hydraulic system, 1 bucket, 1 bucket cylinder, 1 linkage, 6 pins and 4 hoses.
8, Before welding, we have use big edge milling machine mill(taper process) the edge of the sheet. So the welding can go to the internal of the steel-sheet and make the structure have higher performance. Also the inside have strength plate make it more stronger.
9, If necessary, extra pipeline can be added to suit to some extra application.
10, Stick cylinder of the long boom, can use your original stick cylinder to save the cost, if you need the stick cylinder, we also can prepare for you.
11, Some parts can be consolidated using thicker plate or overlapping another plate for heavy-duty application.
12, Welding is protective-gas welding, the protective gas is 80% Argon and 20% CO2 mixed. This is golden standard for protective gas.
13, Before welding, we have use big edge milling machine mill the edge of the sheet. So the welding can go to the internal of the steel-sheet and make the structure have higher performance.
14, For all base,joint and other main structure of the long boom, we use boring machine adjust the precision after welding, to avoid the welding-stress leading to big tolerance.
15, The manufacture time about 25 days. Warranty time 9 month after installation.
16, We will also supply parts list for the long reach boom, so it's easy for Maintenance and after-sales service.
Common Models:
Model | LDB120 | LDB200 | LDB220 | LDB300 | LDB350 | LDB400 | LDB450 |
Total length (mm) | 13000 | 15380 | 15380 | 18000 | 20000 | 22000 | 24000 |
Weight (kg) | 3000 | 4000 | 4200 | 5200 | 6000 | 6500 | 7000 |
Max dig depth (mm) | 9000 | 11340 | 11370 | 13000 | 15000 | 16500 | 18000 |
Max extensive Scope (mm) | 12500 | 15100 | 15100 | 17600 | 19600 | 21600 | 23600 |
Max dig height (mm) | 11300 | 12510 | 12610 | 13720 | 14920 | 16100 | 17300 |
Folding height (mm) | 2900 | 2980 | 3040 | 3210 | 3210 | 3400 | 3400 |
Bucket volume (m3) | 0.3 | 0.4 | 0.4 | 0.4 | 0.5 | 0.6 | 0.6 |
Excavator Tonnage(ton) | 12 | 20 | 22 | 30 | 35 | 40 | 45 |
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2014
Total Annual:
5,000,000-10,000,000
Employee Number:
100~120
Ecer Certification:
Active Member
Hui zhou hong bang construciton machinery company established in 2014. located in tie chang industry zone ,shi wan town ,bo luo county ,hui zhou city ,Guangdong province .it is 50 minutes' dirve to Shenzhen international air port and half a our to Shenzhen yantian sea port.very c... Hui zhou hong bang construciton machinery company established in 2014. located in tie chang industry zone ,shi wan town ,bo luo county ,hui zhou city ,Guangdong province .it is 50 minutes' dirve to Shenzhen international air port and half a our to Shenzhen yantian sea port.very c...
Get in touch with us
Leave a Message, we will call you back quickly!