Payment Terms | T/T, L/C, Western Union, T/T, Western Union, MoneyGram |
Supply Ability | 1000PCS |
Delivery Time | 15 working days |
Packaging Details | exported pallet or box |
Name | Excavator Track Adjuster |
Part Num | 201 - 30 - 62312 ,201 - 30 - 62311, 201 - 30 - 62310 |
Color | Black |
Product Keywords | track adjuster, recoil spring assy, excavator tensioner |
Material | Steel |
Aplication | Crawler Excavator/Bulldozer |
After-sales Service Provided | Video technical support, Online support |
MOQ | 1pcs |
Brand Name | JWX |
Model Number | PC120 |
Place of Origin | CHINA |
View Detail Information
Explore similar products
YN54D00014F1 Kobelco Track Adjuster Recoil Spring Replacement SK200-8
ZX330 Hitachi Excavator Track Adjuster Assy Tension Cylinder Recoil Spring
9310837 9311788 Hitachi Track Adjuster Tension Spring Assy Zx200-5G
pc60 komatsu excavator track adjuster Tension Recoil Spring Assy
Product Specification
Payment Terms | T/T, L/C, Western Union, T/T, Western Union, MoneyGram | Supply Ability | 1000PCS |
Delivery Time | 15 working days | Packaging Details | exported pallet or box |
Name | Excavator Track Adjuster | Part Num | 201 - 30 - 62312 ,201 - 30 - 62311, 201 - 30 - 62310 |
Color | Black | Product Keywords | track adjuster, recoil spring assy, excavator tensioner |
Material | Steel | Aplication | Crawler Excavator/Bulldozer |
After-sales Service Provided | Video technical support, Online support | MOQ | 1pcs |
Brand Name | JWX | Model Number | PC120 |
Place of Origin | CHINA | ||
High Light | PV3120 Excavator Track Adjuster ,PC120 Excavator Track Adjuster ,PV3120 Tension Recoil Spring |
PC120-6 Excavator Track Adjuster Assy PV3120 Tension Recoil Spring
Construction parts excavator PC120-6 track adjuster assy PV3120 tension recoil spring
Part name | track adjuster/ excavator track spring/ excavator recoil spring/ excavator tensioner |
Material | Steel |
Finish | Smooth |
Colors | Black |
Delivery Time | Within 15 days after contract established |
Packing | standard exported pallet or box |
Condition | New |
Payment | T/T or western union or other |
Shipping | Normally by sea, by air, DHL, UPS, FEDEX, TNT, ETC for small package |
Related parts | bottom roller, top roller, sprocket, front idler,track shoe, track link assy, track bolt nut, track adjuster and otherundercarriage parts |
MATCH TENSION TO OPERATING CONDITIONS
1. ADJUST TRACK TENSION ON-SITE
Make tension adjustments on the job site. The shop might have properly tensioned the track, but it could become too tight when packed with mud.
2.TEST PACKING CONDITIONS
To match track tension with the specific packing conditions of the job site, run your machine for a short while on the job site. Make the necessary adjustments after this evaluation.
3. MAKE FREQUENT ADJUSTMENTS
Weather changes can change the packing conditions of the job site throughout the day. Tension adjustments made during these changes can help reduce track wear and costs.
4. DO NOT OPERATE YOUR MACHINE WITH FROZEN TRACKS
If you try to use power to force the tracks to move, you could destroy them or damage your final drive.
Recoil Spring Assy
PC60-7: 201-30-62312, 201-30-62311, 201-30-62310,
PC120-6: 203-30-66250, 22B-30-11240, 203-30-66270,
PC200-6: 20Y-30-12111, 20Y-30-12111, 20Y-30-12112,
PC200-7: 20Y-30-12112, 20Y-30-12111,
PC220-6: 206-30-55172, 206-30-55171, 206-30-55170,
PC220-7: 206-30-55172, 206-30-55171,
PC300-6:207-30-54140, 207-30-54141, 207-30-74142, 207-30-74141
PC400-6: 208-30-54140, 208-30-54141, 208-30-74140
Track Adjuster failures
Function of a track adjuster assy is not only used to push the idler wheel forward to increase tension / reduce slack or droop but also to protect the undercarriage from damage when the tractor contact a large solid object i.e. rocks, trees, deep holes, broken ground, stumps etc. Shock loadings are absorbed on impact by the heavy recoil spring which is preloaded to between 50 to +100 tons, depending machine size.
When a track adjuster fails the undercarriage will start to suffer an excessive wear condition that will continue until something breaks, exacerbating the problem, adding downtime and expense to the repair bill. It is advisable to carry our remedial repairs as soon as practical.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company,Seller
Year Established:
2009
Employee Number:
400~500
Ecer Certification:
Verified Supplier
About Jinweixin Excavator Parts Guangzhou Jinweixin Excavator Parts Co., Ltd. we’re more than just a machinery parts supplier.Don't get us wrong, we are the top supplier for excavator parts, construction machinery parts, earthmoving machinery parts, heavy-duty machinery parts,... About Jinweixin Excavator Parts Guangzhou Jinweixin Excavator Parts Co., Ltd. we’re more than just a machinery parts supplier.Don't get us wrong, we are the top supplier for excavator parts, construction machinery parts, earthmoving machinery parts, heavy-duty machinery parts,...
Get in touch with us
Leave a Message, we will call you back quickly!