Payment Terms | T/T |
Supply Ability | 1 million sqm per week |
Delivery Time | 12WORKING DAYS |
Packaging Details | packed with shrink wrapped |
Name | 6 Mil Black Polyethylene Film Vapor Barrier Underlayment |
Material | LDPE |
Thickness | 0.06 mil |
Color | BLACK |
Size | 500 sqft/roll |
Roll width | 1.1m |
Application | subflooring |
Function | Waterproofing membrane |
Brand Name | No Brand |
Model Number | PE-6 |
Certification | SGS |
Place of Origin | China |
View Detail Information
Explore similar products
6 Mil Polyethylene Film Moisture Barrier Vapor Barrier Film 0.06mm Thickness PE
Black Vapor Barrier Film Moisturbloc Polyethylene Film For Subflooring
Plastic 6 Mil Black Vapor Barrier Film Durable Polyethylene Film Vapor Barrier
0.06mm Thickness Vapor Barrier Film SGS PE Moisture Barrier Film
Product Specification
Payment Terms | T/T | Supply Ability | 1 million sqm per week |
Delivery Time | 12WORKING DAYS | Packaging Details | packed with shrink wrapped |
Name | 6 Mil Black Polyethylene Film Vapor Barrier Underlayment | Material | LDPE |
Thickness | 0.06 mil | Color | BLACK |
Size | 500 sqft/roll | Roll width | 1.1m |
Application | subflooring | Function | Waterproofing membrane |
Brand Name | No Brand | Model Number | PE-6 |
Certification | SGS | Place of Origin | China |
High Light | 6 Mil Vapor Barrier Film ,1.1m width Vapor Barrier Film ,500sqft/roll black polyethylene film |
6 Mil Black Polyethylene Film Vapor Barrier Underlayment For Moisture Proofing
Introduction:
Description | PE flim | |||||
Color | Black | |||||
Covering size | 500 sqft/roll | |||||
Thickness | 0.15 mm | |||||
Application | subfloor |
How to Install
Step 1: Clean Your Subfloor
Clean your subfloor using your broom and dustpan so that it is free of any foreign objects.
Step 2: Roll Out Your Underlayment
Roll your underlayment next to the wall. Start in the corner to keep it as even as possible across the room.
Step 3: Cut the Section
Once you have your underlayment firmly in place, cut the section using your scissors or utility knife.
Step 4: Roll Out the Next Section
Roll out the next section with the tape side over the overlapping film on the previous section.
Step 5: Butt Underlayment
Butt your underlayment sections together so that the tape side is flush up against the other piece of underlayment and on top of the overlapping film.
Step 6: Cut Section
Cut the next section of underlayment.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Seller
Year Established:
2010
Total Annual:
150M-200M
Employee Number:
180~200
Ecer Certification:
Verified Supplier
With our own factory and professional service team,we have been positioning ourselves with a precise industry goal, and we are committed to building a national high-quality enterprise. Our goal is to striveto be the underlay supplier that all customers trust. We believethat we will do better wi... With our own factory and professional service team,we have been positioning ourselves with a precise industry goal, and we are committed to building a national high-quality enterprise. Our goal is to striveto be the underlay supplier that all customers trust. We believethat we will do better wi...
Get in touch with us
Leave a Message, we will call you back quickly!