Payment Terms | T/T |
Supply Ability | 1 million sqm per week |
Delivery Time | 12WORKING DAYS |
Packaging Details | packed with shrink wrapped |
Material | rubber |
Thickness | 2mm thickness |
Density | 970kg/m3 |
Size | 10 sqm |
Color | green |
Coating | aluminum film |
Application | floating floor, floor heating system |
Feature | Heavy duty, easy installation |
Brand Name | No Brand |
Model Number | RUB 20-A |
Certification | SGS |
Place of Origin | China |
View Detail Information
Explore similar products
Golden Film Yellow 3mm Foam Underlay Floor For Floating Flooring
Silver Film High End Rubber Floor Underlayment Soundproof For Laminate Flooring
High Performance 2mm Foam Underlay Silver Film Anti Crush Acoustic Rubber
3mm Thick Rubber Floor Underlayment Gold Foam Underlay For Laminate Flooring
Product Specification
Payment Terms | T/T | Supply Ability | 1 million sqm per week |
Delivery Time | 12WORKING DAYS | Packaging Details | packed with shrink wrapped |
Material | rubber | Thickness | 2mm thickness |
Density | 970kg/m3 | Size | 10 sqm |
Color | green | Coating | aluminum film |
Application | floating floor, floor heating system | Feature | Heavy duty, easy installation |
Brand Name | No Brand | Model Number | RUB 20-A |
Certification | SGS | Place of Origin | China |
High Light | SGS heavy duty rubber underlay ,Crush resistant heavy duty rubber underlay ,Aluminum Film waterproof foam underlay |
2mm Heavy Duty Rubber Underlay With Aluminum Film For Water Proofing
Introduction:
Roll Cover: | 10m2 |
Roll Width: | 1000mm |
Roll Overlap | N/A |
Thickness | 2mm |
Moisture Resistance Foil | aluminum film |
Material: | Rubber |
Antimicrobial: | No |
Moisture Resistant | Yes |
Cushioning: | Yes |
Commercial / Residential: | Residential |
How to Install
Step 1: Clean Your Subfloor
Clean your subfloor using your broom and dustpan so that it is free of any foreign objects.
Step 2: Roll Out Your Underlayment
Roll your underlayment next to the wall. Start in the corner to keep it as even as possible across the room.
Step 3: Cut the Section
Once you have your underlayment firmly in place, cut the section using your scissors or utility knife.
Step 4: Roll Out the Next Section
Roll out the next section with the tape side over the overlapping film on the previous section.
Step 5: Butt Underlayment
Butt your underlayment sections together so that the tape side is flush up against the other piece of underlayment and on top of the overlapping film.
Step 6: Cut Section
Cut the next section of underlayment.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Seller
Year Established:
2010
Total Annual:
150M-200M
Employee Number:
180~200
Ecer Certification:
Verified Supplier
With our own factory and professional service team,we have been positioning ourselves with a precise industry goal, and we are committed to building a national high-quality enterprise. Our goal is to striveto be the underlay supplier that all customers trust. We believethat we will do better wi... With our own factory and professional service team,we have been positioning ourselves with a precise industry goal, and we are committed to building a national high-quality enterprise. Our goal is to striveto be the underlay supplier that all customers trust. We believethat we will do better wi...
Get in touch with us
Leave a Message, we will call you back quickly!