Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 50 Sets per Month |
Delivery Time | 15 working days |
Packaging Details | Wooden packaging,Carton packaging |
Fan Control Power | 110V/220V,50Hz/60Hz |
Max Protection Grade | IP32 |
Cooling | Forced air cooling, horizontal inlet air and upwards exhaust cooling |
Ambient Temperature | -10℃~+50℃ |
Dimensions | 750*800*1350 |
Load Resolution | Step:5KW |
Brand Name | Fullde |
Model Number | LB-45KW-380VAC |
Certification | CE, ISO9001 |
Place of Origin | Dongguan,China |
View Detail Information
Explore similar products
30KW 230V Weatherproof Resistive Load Bank / Dc Load Bank With PC Connection
500KW Generator Testing Dummy Variable Load Bank With Load Step Control
Indoor / Outdoor Generator Load Bank For Electrical Or Marine Load Testing
Continuous High Power Dummy Load Bank , Load Bank Testing Diesel Generators
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 50 Sets per Month |
Delivery Time | 15 working days | Packaging Details | Wooden packaging,Carton packaging |
Fan Control Power | 110V/220V,50Hz/60Hz | Max Protection Grade | IP32 |
Cooling | Forced air cooling, horizontal inlet air and upwards exhaust cooling | Ambient Temperature | -10℃~+50℃ |
Dimensions | 750*800*1350 | Load Resolution | Step:5KW |
Brand Name | Fullde | Model Number | LB-45KW-380VAC |
Certification | CE, ISO9001 | Place of Origin | Dongguan,China |
High Light | generator testing load bank ,generator dummy load bank |
45KW Three Phase 380VAC Generator Load Bank With Air-Cooling System
Application of generator Load Bank:
1. Large generator system testing in ocean engineering, drilling facilities,ship construction etc field;
2. Factory testing for generator, static voltage characteristic test, speed characteristic test;
3. Marine generator overload protection test,parallel operation test,reverse power and reverse current protection test;
4. Assist shipyard in mooring test,sea trial test;
5. Assist with the acceptance of the vessel generator test;
6. Eliminate the carbon deposition of generator;
7. As the generator loading system;
8. Periodic running test for standby generator;
9. UPS inspection and maintenance;
10. Ship battery charging/discharging system testing;
11. The acceptance of new system and testing of servicing equipment.
Why need load bank testing for your generator?
Generator is mostly for power back when there is power outage. So the regular load bank testing is to make sure your generator is functioning well when the power goes out one day. That is very important!
Specification | |
Rating voltage/frequency | 24-400VAC |
Max Load Power | Power:45kW |
Load Resolution | Step:5KW |
Power Factor | 1 |
Load Tolerance | ±5% |
Fan Control Power | 110V/220V,50Hz/60Hz |
Wire Connection | Load bank input——Copper bar |
Control power input——Connector-bar | |
Max Protection Grade | IP32 |
Way of Working | Continuous Working |
Cooling | Forced air cooling, horizontal inlet air and upwards exhaust cooling |
Transportation | Hoisting |
Color | RAL7032 |
Dimensions | 750*800*1350 |
Weight | 125KG |
Accessories | Switch: ABB, Siemens and Schneider, PLC: Panasonic and Siemens; |
Operating Environment Parameter | |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2006
Total Annual:
20,000,000-30,000,000
Employee Number:
300~500
Ecer Certification:
Active Member
Company Profile Guangdong Fullde Electrical Technology Co.,Ltd, is the leading manufacturer with more than 11 years experience, which locates in China fashion city – Humen Town, Dongguan city, and near by the High-speed rail station, registered capit... Company Profile Guangdong Fullde Electrical Technology Co.,Ltd, is the leading manufacturer with more than 11 years experience, which locates in China fashion city – Humen Town, Dongguan city, and near by the High-speed rail station, registered capit...
Get in touch with us
Leave a Message, we will call you back quickly!