Payment Terms | T/T |
Supply Ability | 40 sets/Monthly |
Delivery Time | 45 days~60 days |
Packaging Details | protective film wrapped, and packed in carton or plywood case |
Process | Aluminum die casting |
Material | PET, BMC, or Aluminum |
Steel | 2344 and Dievar |
Design standard | DME or Hasco |
Design format | IGES, prt. step |
Export | US and Europe |
Incoterm | FOB |
Brand Name | Gennki |
Certification | ISO9001 / TS 16949 |
Place of Origin | China |
View Detail Information
Explore similar products
NAK80 P20 H13 Car Headlight Housing 2 Cavity Automotive Plastic Injection
CNC EDM Automotive Injection Mold P20 H-13 BMC Vehicle Head Light
PA PC 2344 Automotive Plastic Injection Moulding Steel Multi Cavity Soft Plastic
ABS Plastic Automotive Injection Mold 500L - 1M Shots Rear Fog Lights Parts
Product Specification
Payment Terms | T/T | Supply Ability | 40 sets/Monthly |
Delivery Time | 45 days~60 days | Packaging Details | protective film wrapped, and packed in carton or plywood case |
Process | Aluminum die casting | Material | PET, BMC, or Aluminum |
Steel | 2344 and Dievar | Design standard | DME or Hasco |
Design format | IGES, prt. step | Export | US and Europe |
Incoterm | FOB | Brand Name | Gennki |
Certification | ISO9001 / TS 16949 | Place of Origin | China |
High Light | Dievar Automotive Injection Mold ,metallization Automotive Injection Mold ,2344 reflector lights for cars |
Gennki, supply both the prototype tooling and production tooling for the automotive light series including the reflector, bezel, housing, light pipe for the predominant Tier automotive light supplier in the world. The skillful experience is of great essence to each mold. We have supplied a lot of these types of molds that run at our shop and customer's shop. Especially, the reflector that is essential for light reflection is made from injection molds through both thermoplastic, thermoset, and aluminum material.
We, highly efficient teamwork, coupled with a constant drive to achieve the target, has led to impressive results and short lead time for a new product. Has successfully demonstrated over the years a commitment to quality, customer satisfaction, and a program of continuous improvement in all aspects of quality, management, and production. Gennki also works internationally operating sales, marketing, and purchasing organizations for plastic, metal services. We represent companies from all over the world who distinguish
their service by innovative products and also assist the global customers to outsource their projects base on our service. Our customers base is in North America, Latin America, Europe, mainly in the area of Auto Industry, household, OA, Medical, Aerospace, and consumer part,
Parameter
Brand Name | Gennki Group |
Description | Plastic Injection Mould |
Material | Steel |
Plastic Material | PP,PC,PE,PA6,ABS,PET,PVC,POM,BMC.etc |
Gate system | Cold Runner/Hot Runner |
Ejection | Pin/Stripper Plate. Air pocket,etc |
Movement | Slider/lifter |
A.B plate | 1.1730/P20.etc |
Tool Life | 300K~500K shots (Prototype tooling 2000pcs) |
Mold Base | Copy DME or Hasco steel |
Cavity&Core | P20/H13/NAK80/S50C/S136/738H/Dievar.etc |
Surface Finish | Polish/Texture/Heat Treatment.etc |
Cavities | Single/Multiple/Family mold Lead Time: 3~8 weeks |
Place of Origin | China EAST |
Frequently Asked Question:
Q1. What is required of RFQ?
1) 3D formats with .stp.(preferred) igs,.prt.
2) 2D drawing for tolerance/material/surface finish/test requirement/regulations
3) Quantity (by order, month and Year)
Q2. How do you ensure product quality?
Gennki applies assessment, planning, monitors every single process. Some bullet points:
1) Apply APQP Product development analysis
2) Lay emphasis on prevention and planning
3) Quality Criteria (ISO and TS 16949)
Q3. How do you ensure on-time delivery?
1) Detailed planning, details per hour/person/machine number/stakeholder…
2) Main material is managed efficiently
3) Daily progress meetings, a recovery plan will be reviewed by the management team once any key chain is delay.
4) If a delay happens on delivery in the course, extra hours will help to turn it on schedule
Q4. How can you if we don’t have the CAD data?
Gennki is able to generate the CAD for your review and approval in terms of your 2D sketch, or certain samples.
Q5. Can we test the plastic injection mold?
You are always welcome to the company with us to try the molds in place in person. The testing video can be supplied for your checking with your absence.
Q6. How long does an injection mold last?
Generally, a plastic injection mold could complete anywhere between 100,00 to 1 million (or sometimes somewhat more than a million) cycles in its lifetime, so it's subject to customer’s expectancy.
Q7. How about your guarantee or aftersales?
The worn-easily spare parts will be freely provided during the warranty period. Gennki’s strategic associated American mold shop will assist you to handle the modification change if needed after the delivery.
Q8. How Can I visit your company from abroad?
Easy to find, you may take an international flight either land at PVG Airport or Hongqiao Airport from your workplace. The nearby high-speed train station to Hongqiao Airport will facilitate your trip to elsewhere in China.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2000
Total Annual:
3.2M-4M
Employee Number:
100~200
Ecer Certification:
Active Member
Gennki Group, the headquarter office located in the metropolitan city of Shanghai in the same town as the National Exhibition and Convention Center (Shanghai NECC), is 2 hours driving to PVG airport and nearby the Hongqiao Airport and Sation for national transfer. It will be convenient... Gennki Group, the headquarter office located in the metropolitan city of Shanghai in the same town as the National Exhibition and Convention Center (Shanghai NECC), is 2 hours driving to PVG airport and nearby the Hongqiao Airport and Sation for national transfer. It will be convenient...
Get in touch with us
Leave a Message, we will call you back quickly!