CertifiCAT-partsion | CE,GS,EPA,CARB,CSA |
Payment Terms | L/C,D/P,D/A, Alipay, West Union, TT. Cash,Paypal |
Supply Ability | 500 pieces per Month |
Delivery Time | one weeks on receipt of official sales contract |
Packaging Details | Standard plywood and wood package.the actual package size against goods size and handle requires. Si |
Port: | HongKong or ShenZhen,ShangHai,Dalian as required |
Output Type | AC Single Phase |
Starting | Electric Start |
Phase | Single-Phase |
Displacement(Cc) | 420 |
Trademark | Genour PowerValue |
certifiCAT-partse | CE, ISO |
Brand Name | GSKA |
Model Number | Small Gasoline Powered Generator |
Place of Origin | China OEM |
View Detail Information
Explore similar products
Recoil Start Portable Quiet Variable Frequency Gasoline Generator 220V
Portable Silent Inverter Gasoline Generators 1kw 2kw 110v
OEM Industrial Natural Gas Portable Generator AC Single Phase 50/60Hz
Industrial Natural Gas Powered Electric Generator AC Single Phase
Product Specification
CertifiCAT-partsion | CE,GS,EPA,CARB,CSA | Payment Terms | L/C,D/P,D/A, Alipay, West Union, TT. Cash,Paypal |
Supply Ability | 500 pieces per Month | Delivery Time | one weeks on receipt of official sales contract |
Packaging Details | Standard plywood and wood package.the actual package size against goods size and handle requires. Si | Port: | HongKong or ShenZhen,ShangHai,Dalian as required |
Output Type | AC Single Phase | Starting | Electric Start |
Phase | Single-Phase | Displacement(Cc) | 420 |
Trademark | Genour PowerValue | certifiCAT-partse | CE, ISO |
Brand Name | GSKA | Model Number | Small Gasoline Powered Generator |
Place of Origin | China OEM | ||
High Light | 15L Natural Gas Generator ,CSA Natural Gas Generator |
Portable Industrial Natural Portable Gas Generator AC Single Phase
High vibration:
(1) Poor docking with prime mover check and correct docking. After the bolts are fastened, ensure that the generator and the prime mover axis are straight and concentric.
(2) The rotor dynamic balance is not good, occurs after the rotor is rewound, should find the positive dynamic balance.
(3) Short-circuit of the excitation winding of the main generator measure the DC resistance of each pole and find out the short-circuit fault point. Replace the coil.
(4) Bearing damage, generally bearing cover overheating phenomenon, replace the bearing.
(5) If the prime mover is faulty, check the prime mover.
overheating:
(1) The generator is overloaded, so that the load current and voltage do not exceed the rated value.
(2) The load power factor is too low, adjust the load, so that the excitation current does not exceed the rated value.
(3) If the speed is too low, adjust the speed to the rated value.
(4) There is a short circuit in some windings of the generator. Find out the short circuit and correct or replace the coil.
(5) The air duct is blocked, the obstacles are removed, the motor is dismantled, and the air duct is thoroughly blown.
SpecifiCAT-parts-partsion:
Model | GSKA2500GX | GSKA3000GX | GSKA3800GX | GSKA6500GX |
Frequency | 50Hz/60Hz | 50Hz/60Hz | 50Hz/60Hz | 50Hz/60Hz |
AC Voltage | 230V/120V | 230V/120V | 230V/120V | 230V/120V |
Voltage Regulate | AVR | AVR | AVR | AVR |
Rated Power | 2.0kw/2.2kw | 2.5kw/2.8kw | 3.0kw/3.3kw | 5.0kw/5.5kw |
Max. Power | 2.2kw/2.5kw | 2.8kw/3.2kw | 3.5kw/3.8kw | 5.5kw/6.0kw |
Engine Model | GX160/GP160 | GX200/GP200 | GX270 | GX390 |
Starting system | Recoil/Electric start | Recoil/Electric start | Recoil/Electric start | Recoil/Electric start |
Fuel tank Capacity | 15L | 15L | 15L | 25L |
Oil Capacity | 0.6L | 0.6L | 0.6L | 1.1L |
Run time @ 100% load | 9.5h | 9.5h | 9.5h | 8.5h |
Noise db(7m) | <68DB | <68DB | <70DB | <75DB |
Dimensiones L*W*H (mm) | 605×450×460 | 605×450×460 | 605×450×460 | 700×535×570 |
Net/Gross weight | 40/42kg | 42/44kg | 44/46kg | 73/75kg |
20GP | 240units | 240units | 240units | 128units |
40HQ | 490 units | 490 units | 490 units | 272 units |
Advantages:
Ø 24 hours online
Ø 35 years experiences
Ø Sample chamber of each model
Ø Best price, fast delivery
Ø OEM, ODM
Ø Oversea offices
Ø Own import and export business license
Ø ISO,CE,UL,ASTM,DIN,EN,GB,BS,JIS,ANSI,TAPPI,AATCC,IEC,VDE
Company Details
Business Type:
Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company
Year Established:
1985
Total Annual:
4Million-5Million
Employee Number:
50~100
Ecer Certification:
Active Member
Since establishment in 1985, Guangdong ALI Testing Equipment Co., Ltd, a wholly-owned subsidiary of GSKA Group has been providing a wide and complete range of products and services to the society. GSKA has now 16 offices, warehouses and service centres in China, with head office loCAT-part... Since establishment in 1985, Guangdong ALI Testing Equipment Co., Ltd, a wholly-owned subsidiary of GSKA Group has been providing a wide and complete range of products and services to the society. GSKA has now 16 offices, warehouses and service centres in China, with head office loCAT-part...
Get in touch with us
Leave a Message, we will call you back quickly!