China factories

China factory - Chongqing Haike Thermal Insulation Material Co., Ltd.

Chongqing Haike Thermal Insulation Material Co., Ltd.

  • China,Chongqing ,Chongqing
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Yellow Fireproof 50mm Rockwool Thermal Insulation Slab OEM
China Yellow Fireproof 50mm Rockwool Thermal Insulation Slab OEM

  1. China Yellow Fireproof 50mm Rockwool Thermal Insulation Slab OEM
  2. China Yellow Fireproof 50mm Rockwool Thermal Insulation Slab OEM
  3. China Yellow Fireproof 50mm Rockwool Thermal Insulation Slab OEM
  4. China Yellow Fireproof 50mm Rockwool Thermal Insulation Slab OEM

Yellow Fireproof 50mm Rockwool Thermal Insulation Slab OEM

  1. MOQ: 100 Square Meter/Square Meters
  2. Price: 100-499 square meters $2.40
  3. Get Latest Price
Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability 1000000 Square Meter/Square Meters per Month
Delivery Time 15-30 work days
Packaging Details 1. There is a plastic bag inside. 2. Take a woven bag. 3. Vacuum waterproof packaging.
Product name Rock wool board
After-sale Service Online technical support, Other
Color Yellow
Thickness 30mm-200mm
Width Customizable
Density 40-200kg/m3
Brand Name HaiKe
Model Number Rock wool board
Place of Origin Chongqing, China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram Supply Ability 1000000 Square Meter/Square Meters per Month
Delivery Time 15-30 work days Packaging Details 1. There is a plastic bag inside. 2. Take a woven bag. 3. Vacuum waterproof packaging.
Product name Rock wool board After-sale Service Online technical support, Other
Color Yellow Thickness 30mm-200mm
Width Customizable Density 40-200kg/m3
Brand Name HaiKe Model Number Rock wool board
Place of Origin Chongqing, China
High Light 50mm Rockwool Thermal Insulation SlabFireproof 50mm Rockwool Thermal InsulationRockwool Thermal Insulation Slab OEM

Fireproof Thermal Insulation Sound-Absorbing Rock Wool Insulation Board

 

1.Product introduction

 

   Rock wool board, also known as rock wool insulation decorative board, is based on basalt as the main raw materials, through high temperature melting processing of inorganic fiber board, in June 1981 successfully tested rock wool board is a new type of insulation, fire insulation, sound absorption material.


   Rock wool board is an artificial inorganic fiber processed by high temperature melting, which has the characteristics of light weight, small thermal conductivity, heat absorption and non-combustion. The initial development is a common application type in buildings. It is mainly used in industrial buildings and should meet the provisions of "Application Types and Basic Requirements of building insulation Materials".

 

 

2.Characteristics

 

Fire prevention
Exterior wall rock wool board raw materials using natural volcanic rock, is non-combustible building materials fireproof materials.
Main fire protection characteristics:
A1, the highest fire classification, is ableto effectively prevent the spread of the fire.
The dimensions are very stable and do not extend, contract or deform in fire.
the abletemperature withstands the melting point above 1000℃.
No smoke or burning droplets/debris is generated in the fire.
No substances and gases harmful to the environment are released in the fire.


Heat preservation and insulation
Exterior w
all rock wool board fiber slender and flexible, low slag ball content. Therefore, low thermal conductivity, with excellent thermal insulation effect.


Sound absorption and noise reduction
Rockwool is an ideal sound insulation material. A large number of slender fibers form a porous connection structure, which determines that rockwool is an excellent sound absorption and noise reduction material.
hydrophobicity
Hydrophobic rock wool products hydrophobic rate can reach 99.9%; Very low water absorption, no capillary penetration.
Moisture resistance
When the relative humidity is high, the volume moisture absorption rate of rockwool is less than 0.2%, and the mass moisture absorption rate is less than 0.3% according to ASTMC1104 or ASTM1104M method.
non-corrosive
The chemical properties of rock wool are stable, PH value is 7-8, neutral or weakly basic, for carbon steel, stainless steel,
Aluminum and other metal materials are free from corrosion.


Safety and environmental protection
Rockwool tested does not contain asbestos, CFC, HFC, HCFC and other harmful substances to the environment. Will not be corroded or mildew and bacteria. (Rockwool has been recognized as non-carcinogenic by the international Cancer Research Authority)

 

 

 

 

3.Parameter table

 

Fire protection rating A1
Highest Working Temperature 800
Thermal Conductivity 0.034-0.044w/mk
Thickness 30mm-200mm
Function Heat preservation/fire prevention
Color Yellow
Density 40-200kg/m3
Material rockwool
Warranty More than 5 years

 

4.Key points of construction

 

(1) Before construction, a special construction plan for energy conservation and heat preservation of the project shall be prepared according to the design, requirements of this regulation and relevant technical standards, and the construction personnel shall be provided with technical disclosure and professional technical training.

 

(2) The construction of the rockwool board external insulation system for energy-saving insulation projects shall be carried out in accordance with the qualified construction drawing design documents and the approved energy-saving insulation special construction scheme for engineering projects.

 

(3) The manufacturer of rock wool board external insulation system should have professional personnel to provide on-site guidance in the construction process, and cooperate with the construction unit and on-site supervision to do a good job in construction quality control.

 

(4) Materials must be accepted in accordance with specifications, quantity and quality requirements before they can be stored, and they should be kept by specially-assigned personnel. Outdoor stacking is strictly prohibited. Curtain wall rock wool board should be stacked overhead moisture-proof.

 

(5) Construction shall meet the following conditions:

 

The basic wall and its cement mortar screed are treated and the embedded parts are installed.

 

Necessary construction machines and protective equipment should be ready.

 

construction of special scaffolding should be set up firmly, safety inspection qualified. The distance between the scaffolding pole and the horizontal pole and the wall and the corner should meet the construction requirements.

 

The base wall should be solid and flat, the surface is dry, there should be no cracking, empty drum, loose or causticity, the bond strength, flatness and verticality of the cement mortar screed layer should meet the quality requirements of the ordinary plastering project GB50210 (building decoration engineering quality acceptance code).

 

 

(6) During the external insulation construction of the exterior wall of the rock wool board, the construction shall not be carried out when the ambient temperature of the base and construction is lower than 5℃.Construction shall not be allowed in windy weather, rain and snow weather of grade 5 or above. During and after construction, effective measures should be taken to prevent rain erosion and sun exposure, and a protective layer should be made in time. In case of rain during construction, measures should be taken to prevent rain from scouring the wall; Winter construction should be in accordance with the relevant standards to take anti-freezing measures.

 

(7) Before large-scale construction, the sample wall shall be made of the same material, construction method and technology on site according to the regulations, and the construction can only be carried out after being confirmed by the parties concerned.

 

(8) When using rock wool board for construction, operators should wear protective equipment, do a good job of occupational health protection, and pay attention to construction safety.

 

(9) The required materials related to the rock wool board external insulation system shall be sent to qualified testing institutions for testing, and can be used only after passing the testing.

 

(10) The paste of rock wool board should adopt the strip adhesion method or the point adhesion method, and the adhesive area should not be less than 50%. Rock wool board after the adhesive, should be the bottom of the insulation board and the base paste, rock wool board should bottom up along the horizontal direction transverse laying, and should take side paving side anchoring, plate seam should be naturally tight, between the board gap shall not be greater than 2mm, such as seam width 2mm, should be filled with thermal insulation materials, adjacent board surface should be flat, height difference between the boards shall not be greater than 1.5mm.

 

(11) All wall-penetrating pipelines and components that can reach the rock wool board shall be filled with the same material at the outlet and then treated with waterproof sealing.

 

(12) If the veneer is found to fall off during the construction process, it should be fixed by bonding or anchoring with anchorage parts in time, and the construction of the external finishing layer should be carried out in time.

 

(13) Plastering layer construction shall meet the following requirements:

 

After pasting the rock wool board, the plastering surface of the board should be treated with a stainless steel spatula on the entire surface coated with scraping mortar (thickness 1~1.5mm), and pressed into the surface fibers of the rock wool board.

 

The plaster paste should be configured in strict accordance with the product instruction manual, the configured adhesive should avoid direct sunlight, and should be used up within 2h.

 

The plastering layer is divided into two layers. The thickness of the first layer of plastering glue is 2 ~ 3mm. It should be plastered with stainless steel serrated spatula first, then flattened with a large spatula, and pressed into the glass fiber mesh cloth while wet. When the glue is slightly dry and hard enough to touch, the anchor parts should be installed, and the plastic disc and its surrounding parts should be blocked with plastering glue. The first layer of plastering mortar slightly dry can be carried out on the second layer of plastering mortar construction, thickness of about 2mm, smooth and make the plastering layer thickness to meet the design requirements.

 

the laying of the net cloth should be smooched and straightened, and keep the square and perpendicularity of the Yin and Yang Angle. There should be lap joints between the upper and lower parts of the net cloth, and the lap width should not be less than 100mm; Glass fiber mesh cloth shall not be directly laid on the surface of the rock wool board, shall not be exposed, shall not dry lap.

 

The installation of anchoring parts shall be in accordance with the design requirements of the position, using a hammer drill or electric hammer drilling, drilling depth should be greater than the anchoring depth of 10mm, the anchoring nail into the wall during installation, the disc close to the first layer of mesh cloth, and timely with plaster mortar cover the disc and its surrounding.

 

 

5.FAQ

 

(1) who are we?

We are based in Chongqing, China, start from 2015,sell to Southeast Asia(20.00%),North America(10.00%),South

America(10.00%),Eastern Europe(10.00%),Africa(10.00%). There are total about 51-100 people in our office.

 

(2) How can we guarantee quality?

Always a pre-production sample before mass production;Always final Inspection before shipment;

 

(3) what can you buy from us?

Heat preservation,Material,Duct insulation,The walls are filled with cotton,Steel structure insulation and others.

 

(4) why should you buy from us not from other suppliers?

Our company is a professional company specializing in research and development, production and sales of thermal insulation

materials, with a number of patents, national new technology enterprises, with a complete and scientific quality management

system.

 

(5) what services can we provide?

Accepted Delivery Terms: FOB;

Accepted Payment Currency:USD,EUR,JPY,CAD,AUD,GBP,CNY;

Accepted Payment Type: T/T,L/C,D/P D/A,MoneyGram,Credit Card;

Language Spoken:English,Chinese,Spanish,Japanese,Portuguese,German,Arabic,French,Russian,Italian

 


6.Introduction of the company
 

   Chongging Haike Thermal Insulation Material Co..Ltd.is located in Yuzhong District, Chongging City. It is a national high-tech enterprise that develops technical processes and equipment related to glass wool manufacturing, and sells thermal insulation materials.


   It is a specialized and new enterprise in Chongging, and has a number of inventions. Patents and utility model patents and national computer software copvrights. and also have a complete and scientific quality management system.

 

   The main products sold by the company are: centrifugal glass wool and products. formaldehyde-free environmentally friendly glass wool,light steel structure insulation cotton, etc., and has OEM factories in Chengdu,Sichuan,Qingyuan,Guangdong,Guangde Anhui,and Jiulongpo District, Chongging City. With processing and storage bases.

 

   The company's series of products are widely used in construction petrochemical. electronics, electric power.metallurgyautomobile

energy,aerospace. transportation and other fields,and their thermal insulation. sound absorption and noise reduction effects are very significant.

 

   Over the vears, Chongging Haike Thermal Insulation Material Co. Ltd.has been highly recognized by the industry for its integrity strength and product quality. Friends from all walks of life are welcome to visit, guide and negotiate business.


 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Exporter,Trading Company,Seller

  • Year Established:

    1995

  • Total Annual:

    800000-36000000

  • Employee Number:

    200~350

  • Ecer Certification:

    Verified Supplier

Chongqing Haike Thermal Insulation Material Co., Ltd. was established in July 2015 and is located in Yuzhong District, Chongqing City. Our company is mainly engaged in the production of thermal insulation materials (the main products sold are: centrifugal glass wool series products, rock wool series... Chongqing Haike Thermal Insulation Material Co., Ltd. was established in July 2015 and is located in Yuzhong District, Chongqing City. Our company is mainly engaged in the production of thermal insulation materials (the main products sold are: centrifugal glass wool series products, rock wool series...

+ Read More

Get in touch with us

  • Reach Us
  • Chongqing Haike Thermal Insulation Material Co., Ltd.
  • 26-16, Building 12, Hengdu Metropolis Plaza, Shiyou Road, Yuzhong District, Chongqing, China
  • https://www.heatinsulationmaterials.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement