Payment Terms | T/T, L/C, D/P |
Supply Ability | 10000 pcs per Month |
Delivery Time | 4-8 weeks |
Packaging Details | Plywood Box/According to customer's requirement |
Use | Auto |
Type | Roller |
Material | Steel |
Product Name | Chinese Supplier Competitive Price Auto Parts Steel Casting of Roller |
Color | Siliver |
Size | Customer Size |
Surface treatment | Machining |
Process | Raw Material Machining |
Application | Automobile, |
Package | Plywood Case or Pallet |
Brand Name | OEM service available |
Model Number | OEM service available |
Certification | ISO9001 |
Place of Origin | Ningbo |
View Detail Information
Explore similar products
OEM Engine Parts 8kg Alloy Steel Investment Casting
Round Alloy Steel Flanges 0.2kg Automobile Spare Parts
Galvanized Sleeve Cap 12.5um Automobile Spare Parts
Water Glass Carbon Steel Casting of Washers
Product Specification
Payment Terms | T/T, L/C, D/P | Supply Ability | 10000 pcs per Month |
Delivery Time | 4-8 weeks | Packaging Details | Plywood Box/According to customer's requirement |
Use | Auto | Type | Roller |
Material | Steel | Product Name | Chinese Supplier Competitive Price Auto Parts Steel Casting of Roller |
Color | Siliver | Size | Customer Size |
Surface treatment | Machining | Process | Raw Material Machining |
Application | Automobile, | Package | Plywood Case or Pallet |
Brand Name | OEM service available | Model Number | OEM service available |
Certification | ISO9001 | Place of Origin | Ningbo |
High Light | 6.3um Automobile Spare Parts ,0.2kg Automobile Spare Parts ,6.3um car auto spare parts |
Chinese Supplier Competitive Price Auto Parts Steel Casting of Roller
1. Products Information:
Name | Chinese Supplier Competitive Price Auto Parts Steel Casting of Roller | Material | Steel | |
Weight | KG | Application | Auto Industry | |
Price | USD/KG | 3-4 | Currency | RMB USD EUR |
Surface treatment | Machining | Process | Raw Material Machining | |
Payment terms | 50% deposit, and 50%after see the copy of B/L | Packing | Put in the bubble pack firstly, then put in Non-fumigation Plywood box or at customer's requirment | |
Terms of Trade | EXW FOB CIF | ![]() | ![]() | |
Delivery Time | 60days for sample making,45 days for mass production |
2. Manufacturing Process:
Process design⇒ Buy the Rawing Material⇒Lay off material⇒Cutting off the raw parts with the size design⇒Do the machining⇒Inspect the goods⇒Packing&Delivery
3.Quality Insurance
Spectrograph Spectrum Analyse Chemical Analyse
Tensile Machine&Hardness Machine Shaping Machine Simple Hardness Test Machine
4.FAQ
a. Are you a factory or trading company?
We are have a factory and a trading department.
b. Where is your factory located?Can we have a visit?
Our factory is located in Fenghua District, Ningbo,China.You can fly to Shanghai Airport and take the train to ningbo, Also can fly to Ningbo Air port directly.All our clients, from home or abroad, are warmly welcome to visit us.
c. How does your factory to regarding quality control?
Quality is priority, we always attach great importance to quality controlling from the very beginning to the very end.We also has gained ISO9001:2008 Authentiation.
Company Details
Business Type:
Manufacturer,Seller
Year Established:
2007
Total Annual:
4,600,000-5,400,000
Employee Number:
100~1
Ecer Certification:
Site Member
Ningbo fenghua hengao machinery co., LTD is located in fenghua district, ningbo city, zhejiang province, close to ningbo international airport.The company adopts advanced precision casting technology, the production of carbon steel, alloy steel, stainless steel, wear-resistant steel and other materi... Ningbo fenghua hengao machinery co., LTD is located in fenghua district, ningbo city, zhejiang province, close to ningbo international airport.The company adopts advanced precision casting technology, the production of carbon steel, alloy steel, stainless steel, wear-resistant steel and other materi...
Get in touch with us
Leave a Message, we will call you back quickly!