China factories

China factory - Hongya Power Generating Equipment To Utilities Limited

Hongya Power Generating Equipment To Utilities Limited

  • China
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Casting Steel Turgo Impulse Turbine 700kw Turgo Wheel Generator
China Casting Steel Turgo Impulse Turbine 700kw Turgo Wheel Generator

  1. China Casting Steel Turgo Impulse Turbine 700kw Turgo Wheel Generator
  2. China Casting Steel Turgo Impulse Turbine 700kw Turgo Wheel Generator

Casting Steel Turgo Impulse Turbine 700kw Turgo Wheel Generator

  1. MOQ: 1
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms T/T
Supply Ability 1+unit+4 months
Delivery Time 120 wordking days
Packaging Details plywood
runner material stainless steel
body steel casting
capacity 700kw
runner Dia 0.68m
flow 0.85
head 105m
Brand Name Wawushan
Model Number XJ-002
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 1+unit+4 months
Delivery Time 120 wordking days Packaging Details plywood
runner material stainless steel body steel casting
capacity 700kw runner Dia 0.68m
flow 0.85 head 105m
Brand Name Wawushan Model Number XJ-002
Place of Origin China
High Light Casting Steel Turgo Impulse Turbine700kw Turgo Wheel Generator700kw turgo turbine generator

700kw Turgo Wheel Generator For Micro Hydro Generator

 

overview

 

Turgo impulse turbines are well suited to power generation in South East Asia. Their robust design features and simple construction provide good reliability and availability. Machine efficiencies are maintained over a wide flow range and progressive efficiency reductions due to erosion by silt present in the water are minimal.

The simple and robust Turgo Impulse turbine provides reliable power generation even on water supplies with silt burdens.

It offers a number of advantages particularly over reaction turbines especially in SE Asia that have been covered above.

The Turgo has a higher specific speed than Pelton turbine resulting in smaller

faster rotating turbine generator unit for a given head and flow

High tolerance to erosive particles in the water with no significant reduction in efficiency

Low maintenance design

Deflector speed control giving a fast response to load / frequency changes

Modular design approach

Flexibility in turbine design, layout and configuration

No penstock surge in response to a change in load or frequency

No penstock surge on emergency shutdown on loss of grid

Operation possible down to 10% of rated flow

A higher annual energy may be possible than is available from reaction turbines

on projects with long periods of low flow

 

1.The package of Project


a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b.Regular maintenance and inspection
c.Technical Training Program for Power Plant Personnel
d.General Overhaul
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant
c.Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.

 

Specification

 

Name 700kw Turgo Water Turbine Generator
Water Head 105.0m
Runner Diameters 0.68 m
Capacity2 500KW
Frequency 50HZ
Generator Voltage 400V
Layout pattern vertical
Material(blades) Stainless Steel ZG0Cr13Ni4Mo
Excitation Brushless
Generator Insulation F/F
Lifespan 50 years
 

 

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2003

  • Total Annual:

    800-1000

  • Employee Number:

    70~110

  • Ecer Certification:

    Verified Supplier

  Established in 2003, Hongya power is an international company offering tailored solutions for “small”hydroelectric developments. Hongya power complete water to wire package includes design, manufacture,installation & commissioning. Hongya power offers a range of hydroe...   Established in 2003, Hongya power is an international company offering tailored solutions for “small”hydroelectric developments. Hongya power complete water to wire package includes design, manufacture,installation & commissioning. Hongya power offers a range of hydroe...

+ Read More

Get in touch with us

  • Reach Us
  • Hongya Power Generating Equipment To Utilities Limited
  • Anxi village, Yuping town,Hongya county, China
  • https://www.hydraulic-turbine.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement