China factories

China factory - Hongya Power Generating Equipment To Utilities Limited

Hongya Power Generating Equipment To Utilities Limited

  • China
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Horizontal 2000kw Hydro Power Generator Water Turbine 6300v
China Horizontal 2000kw Hydro Power Generator Water Turbine 6300v

  1. China Horizontal 2000kw Hydro Power Generator Water Turbine 6300v
  2. China Horizontal 2000kw Hydro Power Generator Water Turbine 6300v

Horizontal 2000kw Hydro Power Generator Water Turbine 6300v

  1. MOQ: 1
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms T/T
Supply Ability 1+unit+4 months
Delivery Time 180 wordking days
Packaging Details plywood
shaft forged steel
layout horizontal
insulation class F/F
excitation brushless
voltage 6300v
capacity 2000kw
Brand Name Wawushan
Model Number SF-012
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 1+unit+4 months
Delivery Time 180 wordking days Packaging Details plywood
shaft forged steel layout horizontal
insulation class F/F excitation brushless
voltage 6300v capacity 2000kw
Brand Name Wawushan Model Number SF-012
Place of Origin China
High Light 2000kw Hydro Power Generator Water TurbineHydro Power Generator Water Turbine 6300v

2000kw Micro Hydro Power Generator For Micro Hydro Power Plant

 

overview 

 

Hydro turbine generator is droved directly or indirectly by hydro turbine. The rotating speed is less than 1500r/min, with horizontal and vertical arrangement. Excitation mode with brushless and static silicon type.

Components including stator, rotor,base frame, bearing, excitation motor or collecting ring. The outlet voltage from 400V to 13.8KV, and frequency could be 50Hz or 60Hz, output from 50Kw to 50Mw. Our generator are high efficiency, reliable, manufacture and tests all follow related IEC standards.

medium and large hydro generators are designed for run-of-river and high head hydropower plants.

Our knowledge and experience in Hydropower allows our team to match customers with the best technology for their site. 

Low-speed machines ideal for run-of-river plants in connection Kaplan turbines; and High-speed machines used with Francis and Pelton turbines for high head hydro power

All of our medium and large hydro generators are engineered to reduce thermo-mechanical stress on the generator structure, which contributes to

improved reliability and extended lifetime. Additionally, our generators come with a stator core pressing system to ensure that pressing force is

provided precisely where it is needed: in the core.

A closed loop air ventilation circuit is standard with our machines and, when necessary for the site conditions and generator

configuration, we offer state-of-the-art cooling systems.

 

Specification

 

Name 2000kw Hydro Electric Power Generator
Capacity2 2000KW
Frequency 50HZ
Generator Voltage 6300V
Layout pattern vertical
Material(coil) copper
Excitation Brushless
Generator Insulation F/F
Lifespan 50 years
 

 

our service package as follows

 

1.The Argumentation of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling) (Optional)
b.Regular maintenance and inspection (Optional)
c.Technical Training Program for Power Plant Personnel (Optional)
d.General Overhaul (Optional)
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant (Optional)
c.Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.(

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2003

  • Total Annual:

    800-1000

  • Employee Number:

    70~110

  • Ecer Certification:

    Verified Supplier

  Established in 2003, Hongya power is an international company offering tailored solutions for “small”hydroelectric developments. Hongya power complete water to wire package includes design, manufacture,installation & commissioning. Hongya power offers a range of hydroe...   Established in 2003, Hongya power is an international company offering tailored solutions for “small”hydroelectric developments. Hongya power complete water to wire package includes design, manufacture,installation & commissioning. Hongya power offers a range of hydroe...

+ Read More

Get in touch with us

  • Reach Us
  • Hongya Power Generating Equipment To Utilities Limited
  • Anxi village, Yuping town,Hongya county, China
  • https://www.hydraulic-turbine.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement