China No Pollution Press Pile Machine Fast Piling Speed Long Working Lifespan
China No Pollution Press Pile Machine Fast Piling Speed Long Working Lifespan

  1. China No Pollution Press Pile Machine Fast Piling Speed Long Working Lifespan
  2. China No Pollution Press Pile Machine Fast Piling Speed Long Working Lifespan

No Pollution Press Pile Machine Fast Piling Speed Long Working Lifespan

  1. MOQ: 1 unit
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T, D/P, Western Union
Supply Ability 10 units per month
Delivery Time 30-45 days
Packaging Details Nude package by bulk vessel
Product Name Hydraulic Static Pile Driver
Max driving force 2800KN
Rated Piling Pressure 2800KN
Piling Stroke 1.8m
Piling Speed 7.7m/min
Total weight With counterweight total 280Ton
Brand Name T-works
Model Number ZYC280
Certification CE,GOST
Place of Origin HUNAN,CHINA

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, D/P, Western Union Supply Ability 10 units per month
Delivery Time 30-45 days Packaging Details Nude package by bulk vessel
Product Name Hydraulic Static Pile Driver Max driving force 2800KN
Rated Piling Pressure 2800KN Piling Stroke 1.8m
Piling Speed 7.7m/min Total weight With counterweight total 280Ton
Brand Name T-works Model Number ZYC280
Certification CE,GOST Place of Origin HUNAN,CHINA
High Light pile pressing machinesconcrete pile driving

T-works ZYC 280T Hydraulic Press In Pile Driver With Fast Piling Speed

 

1. Description:

T-works ZYC Series 280T Pile Foundation Equipment are featured with no noise, no vibration, no pollution and no rubbish left in construction site.It can work with H-piles, precast concrete and steel piles with different shapes,like round,square and tapered shape. There are series models range from 60T to 1200T.

It is adopted the hydraulic system design of large power and high flow,the precast pile entirely depends on the hydraulic static pressure so that the pile can be pressed into the ground steadily and quietly.

The pressing-pile speed amounting to 300-800 meters within 8hours, which it's quite more efficient than other conventional pile drivers.

This unique construction method with non-pollution has gradually taken place of the pile hammer.

 

2. Applications:

  • No limitation on pile length. Suitable for construction in clay soil, soft soil and sand bed foundation, or in the Karst areas with low earth covering, or by riversides, or in coastal areas with deep bearing stratum.

  • No noise, No pollution during construction, especially suitable for operations in areas with noise control such as schools, social communities, and urban areas.

  • No vibrations. Suitable for vibration-control areas such as subways, overpass, dangerous buildings, precision instrument buildings and those nearby banks.

3. Specifications:

Parameter/Model ZYC280
Rate piling pressure(KN) 2800
Piling speed(m/min) Fast 7.7
Low 1.8
Piling stroke(m) 1.9
Pace(m) Longitudinal 2.4
Horizontal 0.6
Angle range(°) 15
Rise stroke(m) 1.0
Square pile(mm) Max 500
Circle pile(mm) Max 500
Side piling(mm) 900
Corner piling space(mm) 1800
Lifting weight(t) 12
Pile hanging length(m) 14
Power(KW) Piling 60
Lifting 30
Main dimension(m) Work length 12
Work width 6.1
Transpot height 3.1
Total weight(t) 280

 

4. Features of Hydraulic static pile driver:

1)Civilized construction; Clean; No noise; No vibrations; No construction wastes.
2)Reliable Construction Quality; Piling process is similar to static load testing, where pile bearing force can be displayed. 100% pile success rate is guaranteed.
3)Fast piling and High efficiency; One HSPD can drive piles in total of 600~800m per 8 hours, much faster than other modes. Especially suitable for large-scale or time-constraint projects.
4)Walking and steering freely. Easy to align piles.
5)Compact conformation. Easy to disassemble & assemble.

 

 

5. After sale service and quality gurantee

1) To train operating,maintenance and construction people for our customers.

2) Always be ready to answer technical questions concerned from our customers.

3) Be responsible for the quality of our products and provide technical service of installing,making ajustment,testing and maintenance on the site in time.

4) To dispatch technicans to the worksite at short notice to solve problems or fix breakdowns.

5) Keep a record of our customers and be informed of the working performance of our products,feedback and suggestions of our customers so as to make a good cooperation with customers.
6) We guarantee to keep our Main Machine in good repair for 1 year after sale and 6 months for accessories. In the guarantee time, any quality problem caused by manufacturing after confirmation of us shall be repaired for free; Exceed the guarantee time, we can also supply repair services to our products charged for repair cost only.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2005

  • Total Annual:

    20000000-30000000

  • Employee Number:

    270~300

  • Ecer Certification:

    Active Member

    Changsha Tianwei Engineering Machinery Manufacturing Co.,Ltd is a modern joint -stock private  enterprise found in 2005, it is specialized in R & D and manufacturing series of Hydraulic Static Pile Driver and other piling machinery such as bored pile drilling rig, hydrau...     Changsha Tianwei Engineering Machinery Manufacturing Co.,Ltd is a modern joint -stock private  enterprise found in 2005, it is specialized in R & D and manufacturing series of Hydraulic Static Pile Driver and other piling machinery such as bored pile drilling rig, hydrau...

+ Read More

Get in touch with us

  • Reach Us
  • Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd.
  • No,21,Yongyang Road, Liuyang Hi-tech Industrial Development Zone, Changsha, Hunan, China 410323
  • https://www.hydraulicpilingmachine.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement