Supply Ability | 20 Set/Sets per Month |
Packaging Details | wooden box |
Delivery Time | 90days |
Water Head(m) | 8.5-14.5 |
flow rate(m3/s) | 1.17-1.52 |
desigh speed(r/min) | 750-1000 |
power(kw) | 80-165 |
Model | T03-40 |
Keyword | Low Head Water Turbine |
Port | shanghai/shenzhen |
Place of Origin | Sichuan, China (Mainland) |
Brand Name | forster |
Model Number | T03-25 |
Certification | ISO9001/CE/TUV/From-E |
View Detail Information
Explore similar products
75KW To 165KW Low Head Tubular Water Turbine Micro Hydro Generators For Low Head
Tubular Type Low Head Water Turbine , Low Head Hydro Turbine Generator
5.5-21m Low Head Micro Hydro Turbine , Low Pressure Water Turbine Generator
High Efficiency Low Head Water Turbine Generator Long Service Life 380v 400v
Product Specification
Supply Ability | 20 Set/Sets per Month | Packaging Details | wooden box |
Delivery Time | 90days | Water Head(m) | 8.5-14.5 |
flow rate(m3/s) | 1.17-1.52 | desigh speed(r/min) | 750-1000 |
power(kw) | 80-165 | Model | T03-40 |
Keyword | Low Head Water Turbine | Port | shanghai/shenzhen |
Place of Origin | Sichuan, China (Mainland) | Brand Name | forster |
Model Number | T03-25 | Certification | ISO9001/CE/TUV/From-E |
High Light | low head hydro turbine ,low pressure water turbine |
Hot Sale Design Low Head Micro Bulb Tubular Turbine Generator For Micro Hpp
Our main products included:
1. Kaplan turbine generators series
2. Turgo turbine generators series, e.g. vertical type and horizontal type.
3. Tubular turbine generators series, e.g. Bulb type and shaft extension type
4. Francis turbine generators series
5. Pelton turbine generators series and double turbine generators series and so on.
Product features:
1. suitable for high head,small flow and flow changes in large runoff hydropower station,
2. With the power plant investment is small,compact units structure characteristics,
3. Has the efficiency changes smoothly,operating a wide range,even in the 15%-20%load is reduced efficiency,
4. Suitable for high head amall flow station in mountain area,
5. A unit construction,simple restrictions without cavitation condition,the advantages of stable ooperation,less investment,construction area,
Product parameters:
T03-40 turbine performance data and supporting table | ||||||||||
Model | Turbine Parameters | Generator Parameters | Driving mode | Speed Way | Water Intake | |||||
Design head(m) | Under the design head | Design speed (r/min) | The power of generator | Rated speed(r/min) | Vavel control | Guide vane control | Diameter (mm) | |||
Flow rate (m3/s) | The output(kw) | |||||||||
T03-40 | 4 | 0.64 | 21 | 750 | 20 | 750 | direct connection | 500 | ||
4.5 | 0.68 | 25 | 795 | 25 | 750 | |||||
5 | 0.72 | 29 | 839 | 25 | 750 | |||||
5.5 | 0.75 | 34 | 879 | 30 | 750 | |||||
6 | 0.78 | 38 | 919 | 35 | 1000 | |||||
6.5 | 0.82 | 43 | 956 | 40 | 1000 | |||||
7 | 0.85 | 48 | 992 | 45 | 1000 | |||||
7.5 | 0.88 | 54 | 1027 | 50 | 1000 | |||||
8 | 0.91 | 59 | 1061 | 55 | 1000 | |||||
8.5 | 0.93 | 65 | 1093 | 60 | 1000 | |||||
9 | 0.96 | 70 | 1125 | 70 | 1000 | |||||
9.5 | 0.99 | 76 | 1156 | 75 | 1000 | |||||
10 | 1.01 | 82 | 1186 | 80 | 1000 | |||||
10.5 | 1.04 | 89 | 1215 | 85 | 1000 | |||||
11 | 1.06 | 95 | 1244 | 90 | 1000 | |||||
11.5 | 1.09 | 102 | 1272 | 100 | 1000 | |||||
12 | 1.11 | 108 | 1299 | 105 | 1000 | |||||
12.5 | 1.13 | 115 | 1326 | 110 | 1500 | |||||
13 | 1.15 | 122 | 1352 | 120 | 1500 | |||||
13.5 | 1.18 | 129 | 1378 | 125 | 1500 | |||||
14 | 1.2 | 136 | 1403 | 135 | 1500 | |||||
14.5 | 1.22 | 144 | 1428 | 145 | 1500 | |||||
15 | 1.24 | 151 | 1452 | 150 | 1500 | |||||
15.5 | 1.26 | 159 | 1476 | 155 | 1500 | |||||
16 | 1.28 | 167 | 1500 | 165 | 1500 |
Product pictures:
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website address: www.fstgenerator.com
Q8,What is the difference between Tubular turbine and Kaplan tubine?
Tubular turbines can be connected by pipes, and the cost of civil works is low. The axial flow turbines need to excavate the canals, and the cost of civil works is high.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1956
Total Annual:
50000000-80000000
Employee Number:
100~120
Ecer Certification:
Active Member
Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Eu... Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Eu...
Get in touch with us
Leave a Message, we will call you back quickly!