China factories

China factory - Chengdu Forster Technology Co., Ltd.

Chengdu Forster Technology Co., Ltd.

  • China,Chengdu ,Sichuan
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Hydroelectric 6000KW Pelton Water Wheel Generator
China Hydroelectric 6000KW Pelton Water Wheel Generator

  1. China Hydroelectric 6000KW Pelton Water Wheel Generator
  2. China Hydroelectric 6000KW Pelton Water Wheel Generator
  3. China Hydroelectric 6000KW Pelton Water Wheel Generator

Hydroelectric 6000KW Pelton Water Wheel Generator

  1. MOQ: 1 Set/Sets
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, D/A, T/T, D/P, Western Union, MoneyGram
Supply Ability 50 Set/Sets per Month
Delivery Time 90days
Packaging Details Wooden box
Design Head 50m to 240m
Design Flow 0.154 m³/s to 2.884m³/s
Power 1000KW KW to 6000KW
Connection method Straight league
Color According to customer choice
Volute Material Carbon steel
Runner Material Stainless steel
Rated speed 750-1000
Excitation device :S 5 in 1 integrated control panel
Brand Name Forster
Model Number CJ237-W-65
Certification ISO9001/CE/TUV/From-E
Place of Origin Sichuan, China (Mainland)

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, D/A, T/T, D/P, Western Union, MoneyGram Supply Ability 50 Set/Sets per Month
Delivery Time 90days Packaging Details Wooden box
Design Head 50m to 240m Design Flow 0.154 m³/s to 2.884m³/s
Power 1000KW KW to 6000KW Connection method Straight league
Color According to customer choice Volute Material Carbon steel
Runner Material Stainless steel Rated speed 750-1000
Excitation device :S 5 in 1 integrated control panel Brand Name Forster
Model Number CJ237-W-65 Certification ISO9001/CE/TUV/From-E
Place of Origin Sichuan, China (Mainland)
High Light 6000kw Pelton Turbine Generator240m Pelton Turbine Generator

Pelton Wheel Water Turbines Generator Sale

Pelton turbines are suitable for high-head and small-flow hydropower stations; large-scale bucket turbines have a head of about 300-1700 meters, and small ones can reach 40-250 meters; power stations with heads above 1000 meters in the world currently use buckets Turbine, the unit power can reach more than 400MW.

 

The structure of the Pelton turbine includes a water pipe, a spouting mechanism, a runner, a deflector and a casing. The applied head of Pelton turbine is generally 300-2000m, and currently the highest applied head has reached 1771.3m (Australia’s Reesek-Kreuzeck hydraulic storage power station, the turbine output P=22.8MW).

 

The jet flow mechanism is mainly composed of a nozzle, a nozzle, a spray needle (needle valve) and a spray needle moving mechanism; its function is to convert the potential energy of water flow into jet flow energy, and adjust the flow rate by moving the spray needle.
The runner is composed of a disc and a water bucket fixed on it. The jet rushes to the water bucket. The water bucket interactPelton Turbine Generator​ ​Product pictures:

 

Product Specifications

Pelton tubine generator unit Generator Gevernor or Regulating work Valve
Turbine
Type Water head(m) Discharge (m³/s) Output(kw) Speed (r/min) Type Capacity (kw)
CJA475-W-125/2x14 137 1.541 1739 375 SFW1600-16/2600 1600 CJWT- II BWT-6000 DN800
157 1.662 2151 SFW2000-16/2600 2000
183 1.783 2688 428.6 SFW2500-14/2600 2500
214 1.941 3422 SFW3200-14/2600 3200
248 2.082 4255 500 SFW4000-12/2600 4000 CJWT- II BWT-10000
287 2.237 5291 SFW5000-12/2600 5000
CJA475-W-140/2x14 116 1.429 1366 300 SFW1250-20/2600 1250 CJWT- II BWT-6000 DN800
137 1.541 1739 333.3 SFW1600-18/2600 SFW2000-18/2600 1600
157 1.662 2151 2000
183 1.783 2688 375 SFW2500-16/2600 2500
214 1.941 3422 428.6 SFW3200-14/2600 3200
248 2.082 4255 SFW4000-14/2600 4000 CJWT- II BWT-10000
287 2.237 5291 500 SFW5000-12/2600 5000
333 2.417 6632 SFW6300-12/2600 6300
400 2.495 8421 600 SFW8000-10/2600 8000
CJA475-W-140 /2x16 114 1.851 1739 300 SFW1600-20/2600 1600 CJWT- II BWT-6000  
132 1.977 2151 SFW2000-20/2600 2000  
153 2.132 2688 333.3 SFW2500-18/2600 2500  
179 2.32 3422 375 SFW3200-16/2600 3200 CJWT- II BWT-10000 DN 1000
207 2.495 4255 SFW4000-16/2600 4000
240 2.675 5291 428.6 SFW5000-14/2600 5000
279 2.884 6632 500 SFW6300-12/2600 6300

 

 

Company Information

 

Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Europe, Asia, South America, North America, etc., and as partners, we are qualified as long-term suppliers in many regions.

The capacity of hydro turbines is up to 5KW-300MW for a unit. The main hydro turbines are Turgo turbine ,pelton turbines, francis turbines, kaplan turbines ,bulb tubular turbines and other types of turbines.Foster also supplies governors, valves, transformers, monitoring systems, microcomputer integrated control panels and other equipment for hydroelectric power plants.

 

Our workshop

 

Advantages

 

FAQ

 

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

 

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

 

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

 

Q4, Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

 

Q5, How many an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

 

Q6, How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

 

Q7, Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

website address: www.fstgenerator.com

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    1956

  • Total Annual:

    50000000-80000000

  • Employee Number:

    100~120

  • Ecer Certification:

    Active Member

Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Eu... Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Eu...

+ Read More

Get in touch with us

  • Reach Us
  • Chengdu Forster Technology Co., Ltd.
  • Building No.4.Zhongtie Xicheng Third East Road of Guanghua, Qingyang District, Chengdu city,Sichuan,CHINA
  • https://www.hydro-turbinegenerator.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement