China factories

China factory - Chengdu Forster Technology Co., Ltd.

Chengdu Forster Technology Co., Ltd.

  • China,Chengdu ,Sichuan
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Low Pressure And Low Rpm Hydroelectric Power Plant Generator 500 To 5000KW
China Low Pressure And Low Rpm Hydroelectric Power Plant Generator 500 To 5000KW

  1. China Low Pressure And Low Rpm Hydroelectric Power Plant Generator 500 To 5000KW
  2. China Low Pressure And Low Rpm Hydroelectric Power Plant Generator 500 To 5000KW
  3. China Low Pressure And Low Rpm Hydroelectric Power Plant Generator 500 To 5000KW

Low Pressure And Low Rpm Hydroelectric Power Plant Generator 500 To 5000KW

  1. MOQ: 1 Set/Sets
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, D/A, T/T, D/P, Western Union, MoneyGram
Supply Ability 50 Set/Sets per Month
Delivery Time 90days
Packaging Details Wooden box
Design Head 23.2m to 35.2m
Design Flow 3.41 m³/s to 25.71m³/s
Power 700KW to 8000KW
Connection method Straight league
Color According to customer choice
Runner Material Stainless steel
Excitation device 5 in 1 integrated control panel
Valve Butterfly valve
Rated speed 750-1000
Installation method Horizontal installation
Brand Name Forster
Model Number HL220-WJ-50
Certification ISO9001/CE/TUV/From-E
Place of Origin Sichuan, China (Mainland)

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, D/A, T/T, D/P, Western Union, MoneyGram Supply Ability 50 Set/Sets per Month
Delivery Time 90days Packaging Details Wooden box
Design Head 23.2m to 35.2m Design Flow 3.41 m³/s to 25.71m³/s
Power 700KW to 8000KW Connection method Straight league
Color According to customer choice Runner Material Stainless steel
Excitation device 5 in 1 integrated control panel Valve Butterfly valve
Rated speed 750-1000 Installation method Horizontal installation
Brand Name Forster Model Number HL220-WJ-50
Certification ISO9001/CE/TUV/From-E Place of Origin Sichuan, China (Mainland)
High Light small francis turbine francis water turbine

 

Low Pressure Turbine Low Rpm Hydro Francis Turbine Generator

 

Francis Turbine is a combination of both impulse and reaction turbine, where the blades rotate using both reaction and impulse force of water flowing through them producing electricity more efficiently. Francis turbine is used for the production of electricity in hydro power stations.

 

In addition to electrical production, they may also be used for pumped storage, where a reservoir is filled by the turbine (acting as a pump) driven by the generator acting as a large electrical motor during periods of low power demand, and then reversed and used to generate power during peak demand. These pump storage reservoirs act as large energy storage sources to store "excess" electrical energy in the form of water in elevated reservoirs.

 

hydro francis turbine

 

Francis Turbine Components

 

1. Spiral Casing
Spiral casing is the inlet medium of water to the turbine. The water flowing from the reservoir or dam is made to pass through this pipe with high pressure. The blades of the turbines are circularly placed, which mean the water striking the turbines blades should flow in the circular axis for efficient striking. So the spiral casing is used, but due to circular movement of the water, it looses its pressure.

To maintain the same pressure the diameter of the casing is gradually reduced, so as to maintain the pressure uniform, thus uniform momentum or velocity striking the runner blades.


2. Stay Vanes
Stay vanes and guide vanes guides the water to the runner blades. Stay vanes remain stationary at their position and reduces the swirling of water due to radial flow, as it enters the runner blades. Thus making turbine more efficient.

DSC00700-600x600-0.jpg

 

3. Guide Vanes
Guide vanes are not stationary, they change their angle as per the requirement to control the angle of striking of water to turbine blades to increase the efficiency. They also regulate the flow rate of water into the runner blades thus controlling the power output of a turbine according to the load on the turbine.

hydro turbine-600x600-0.jpg

 

4. Runner Blades
The performance and efficiency of the turbine is dependent on the design of the runner blades. In a Francis turbine, runner blades are divided into 2 parts. The lower half is made in the shape of small bucket so that it uses the impulse action of water to rotate the turbine.

The upper part of the blades use the reaction force of water flowing through it. These two forces together makes the runner to rotate.

 

5. Draft Tube
The pressure at the exit of the runner of Reaction Turbine is generally less than atmospheric pressure. The water at exit cannot be directly discharged to the tail race. A tube or pipe of gradually increasing area is used for discharging water from the exit of turbine to the tail race.

This tube of increasing area is called Draft Tube. One end of the tube is connected to the outlet of runner while the other end is sub-merged below the level of water in the tail-race.

 

Francis Turbine Generator Product parameters

HL-WJ-Francis tubine generator unit Generator Gevernor or Regulating work
Turbine
Type Water head(m) Discharge (m³/s) Speed (r/min) Power(kw) Efficiency(%)
HL220/
A153-
LJ-160
23.4 12.61 214.3 2657 91.4 SF2500-28 YWT-30000
27.6 13.62 250 3385 91.9 SF3200-24
32 14.71 250 4234 91.7 SF4000-24
36.9 15.96 300 5263 91.2 SF5000-20 YWT-38000
43 17.1 300 6636 92 SF6300-20
50.7 18.47 300 8377 91.9 SF8000-20
58.3 19.97 375 10416 91.3 SF10000-16 YWT-50000
67.4 21.43 375 13022 91.8 SF12500-16 YWT-56000
76.1 22.79 375 15550 91.8 SF15000-16 YWT-63000
HL220/
A153-
LJ-180
23.7 16 214.3 3385 91 SF3200-28 YWT-30000
27.1 17.33 214.3 4234 91.9 SF4000-28
31.9 18.5 250 5268 91 SF5000-24
36.6 20.08 250 6632 92 SF6300-24 YWT-38000
43.1 21.63 250 8377 91.6 SF8000-24 YWT-50000
49.6 23.32 300 10417 91.8 SF10000-20 YWT-56000
57.6 25.05 300 13022 92 SF12500-20 YWT-64000
65.6 26.52 300 15548 91.1 SF15000-20 YWT-73000
78.9 27.14 375 20728 91.9 SF20000-16 YWT-87000
HL220/
A153-
LJ-180
23.8 19.75 187.5 4233 91.8 SF4000-32 YWT-38000
27.4 21.3 200 5267 92 SF5000-30
32 22.94 214.3 6632 92.1 SF6300-28 YWT-50000
37.3 24.94 214.3 8378 91.8 SF8000-28 54000
43.2 26.72 250 10418 92 SF10000-24 63000
50.2 28.69 250 13026 92.2 SF12500-24 81000
57.1 30.31 250 15548 91.4 SF15000-24 90000
68 33.77 300 20725 92 SF20000-20 99000
79.5 36.23 300 25826 91.4 SF25000-20 120000
HL180/
A194-
WJ-50
39 1.06 1000 352 86.5 SFW320-6 DST-3000 Or YT-3000
44 1.19 449 87.3 SFW400-6
50 1.3 560 87.5 SFW500-6
H1180/ A194- WJ-50A 60 1.36 1000 690 86.5 SFW630-6 DST-3000 or YT-3000
72 1.5 890 84 SFW800-6
85 1.61 1090 81 SFW1000-6

 

 

Company Information

 

Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Europe, Asia, South America, North America, etc., and as partners, we are qualified as long-term suppliers in many regions.

The capacity of hydro turbines is up to 5KW-300MW for a unit. The main hydro turbines are Turgo turbine ,pelton turbines, francis turbines, kaplan turbines ,bulb tubular turbines and other types of turbines.Foster also supplies governors, valves, transformers, monitoring systems, microcomputer integrated control panels and other equipment for hydroelectric power plants.

 

Our workshop

Advantages

 

 

FAQ

 

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

 

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

 

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

 

Q4, Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

 

Q5, How many an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

 

Q6, How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

 

Q7, Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

website address: www.fstgenerator.com

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    1956

  • Total Annual:

    50000000-80000000

  • Employee Number:

    100~120

  • Ecer Certification:

    Active Member

Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Eu... Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Eu...

+ Read More

Get in touch with us

  • Reach Us
  • Chengdu Forster Technology Co., Ltd.
  • Building No.4.Zhongtie Xicheng Third East Road of Guanghua, Qingyang District, Chengdu city,Sichuan,CHINA
  • https://www.hydro-turbinegenerator.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement