China factories

China factory - SHENZHEN JC RAPID MFG FACTORY

SHENZHEN JC RAPID MFG FACTORY

  • China,Shenzhen ,Guangdong
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Handle Plastic Auto Parts Mold Hot Runner Injection For Auto Decoration Parts
China Handle Plastic Auto Parts Mold Hot Runner Injection For Auto Decoration Parts

  1. China Handle Plastic Auto Parts Mold Hot Runner Injection For Auto Decoration Parts
  2. China Handle Plastic Auto Parts Mold Hot Runner Injection For Auto Decoration Parts

Handle Plastic Auto Parts Mold Hot Runner Injection For Auto Decoration Parts

  1. MOQ: 1 set
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms T/T Paypal
Supply Ability 30-50sets per month
Delivery Time 25-35 work days
Packaging Details wooden case
Material S136, P20, 718H,NAK80 , 2366,8407,S136H
Process quenching , nitriding , annealing , tempering
Mold life 200000-1000000 shots
gate type Sub , banana , side , direct , hot sprue , fan gates
part material PC+ABS , PPA , PA+30% , Grivory
Lead time 40 workdays
Shaping mode Plastic Injection Mould
Product material Steel
Product Auto Interior Parts
Mould base LKM
Mould life 250000-300000shots
Cavity Single/Multi
Design software UG,CAD
Runner Hot/Cold as per your requirement
Mould material H13
Product name Auto Interior Parts
Surface treatment Polishing
Color Can be discussed
Package Wooden Case/etc
Mould cavity Single Cavity/Multi Cavity
Name hot runner mold
Size customized
Brand Name RJCMOLD
Model Number RJC19007AM
Certification ISO 9001:2015 IATF16949
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Paypal Supply Ability 30-50sets per month
Delivery Time 25-35 work days Packaging Details wooden case
Material S136, P20, 718H,NAK80 , 2366,8407,S136H Process quenching , nitriding , annealing , tempering
Mold life 200000-1000000 shots gate type Sub , banana , side , direct , hot sprue , fan gates
part material PC+ABS , PPA , PA+30% , Grivory Lead time 40 workdays
Shaping mode Plastic Injection Mould Product material Steel
Product Auto Interior Parts Mould base LKM
Mould life 250000-300000shots Cavity Single/Multi
Design software UG,CAD Runner Hot/Cold as per your requirement
Mould material H13 Product name Auto Interior Parts
Surface treatment Polishing Color Can be discussed
Package Wooden Case/etc Mould cavity Single Cavity/Multi Cavity
Name hot runner mold Size customized
Brand Name RJCMOLD Model Number RJC19007AM
Certification ISO 9001:2015 IATF16949 Place of Origin China
High Light auto injection moldingmolding auto parts mould

Automotive Plastic Injection Molds For Auto Decoration Parts , Auto Handle Plastic Molds ,​

 

Auto Interior and handle plastic molds specification :

 

Product Name Plastic Phone Shell
Mold Shaping plastic injection molding, injection mold
Size Customer Customized
Product Material Customer Customized,PP,PC,PS,PAG,POM,PE,PU,PVC,ABS,PMMA,etc
Mold Material P20, NAK80, H13, S45C, 718H,718 etc.
Color Clear,Bule,Red and can be customized
Product design According to the client's drawing or samples
OEM /ODM Available, we can provide OEM/ODM service.
Uasge Automobiles, machinery, home appliance, electronic products, electric appliance, computers, sports equipment, Medical device, gifts, textile accessories, and more.
MOQ Negotiable
Delivery Time 10-45 days based on the different products
Payment Terms T/T, L/C, D/T, PAYPAL, WESTERN UNION and etc.
Product packaging Product always with plastic bag(pearl-cotton package for heavy or fragile products), outside with new carton and packing belt, or according to customer's requirement.

 

JC Rapid MFG Factory was established in 2002, after over 16 years development ,it has

grown up to beone of the highly reputable supplier in terms of the service of mold manufacturing ,

injection molding , CNCmachining ,CNC lathing and so on .

With considering new business strategy , JC Rapid decided to built up division of foreign

trading with cuttingdown domestic business in the meanwhile . To a great extent , JC Rapid

took advantage of businessopportunities to expanding business scope for enterprise further

development , and re-positioning companyobjective for the future .

Up to now , JC Rapid has dedicated team to support oversea business in terms of business

development ,engineering support and continuous improvement to guarantee better schedule

and quality delivered .

 

 

 

 

 

Q1:Where can I get product&price information?

 

A1:Send us inquiry e-mail , we will contact you as we receive your mail.

 

Q2:How long can i get the sample?

 

A2:Depends on your specific items , within 3-7 days is required generally.

 

Q3:What's kinds of information you need for quote?

 

A3:Kindly please provide the product drawing in PDF , and will be better you can provide in STEP or IGS

 

Q4: what's the payment terms?

 

A4: We accept 50% as payment deposit, when the goods is done, we take photoes for your check and you then pay the balance.

For small amount, we accept Paypal , Paypal commission will be added to the order. For big amount, T/T is preferred

 

Q5: How to delivery the goods?

 

A5:We deliver the products by courier company

Q6.Are you a trading company or factory?

 

A6:We are direct factory with 17 experienced engineers and more than 50 employees as well approximate 5,000 square meters workshop area.

 

Q7. What shall we do if we do not have drawings?

 

A7. Please send your sample to our factory , then we can copy or provide you better solutions. Please send us pictures or drafts with dimensions(Length , Hight , Width),CAD or 3D file will be made for you if placed order.

 

Q8. Can we get some samples before mass production?

 

A8:Absolutely

 

Q9. Will my drawings be safe after sending to you?

 

A9:Yes, we will keep them well and not release to third party without your permission.

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2002

  • Total Annual:

    7000000-10000000

  • Employee Number:

    100~120

  • Ecer Certification:

    Active Member

  JC Rapid Factory was established in 2002, after over 16 years development ,it has grown up to be one of the highly reputable supplier in termsof the service of mold manufacturing ,injection molding , CNC machining ,CNC lathing and so on .With considering new business strategy , JCRapid...   JC Rapid Factory was established in 2002, after over 16 years development ,it has grown up to be one of the highly reputable supplier in termsof the service of mold manufacturing ,injection molding , CNC machining ,CNC lathing and so on .With considering new business strategy , JCRapid...

+ Read More

Get in touch with us

  • Reach Us
  • SHENZHEN JC RAPID MFG FACTORY
  • 3rdFloor ,3Building, Beifang Yongfa Sci. &Tech Park, XinerZhuangCun 2Rd Shajing Town, Bao'an District Shenzhen city,Guangdong,China
  • http://www.injection-moldingmolds.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement