Payment Terms | L/C, T/T, Western Union |
Supply Ability | 600 sets/year |
Delivery Time | 30-40 days after receive your prepayment |
Packaging Details | The whole Rail Operated Ladle Transfer Vehicle will be packed by the tarp, the parts will be packed by polywood case. |
Product name | 75 Ton Steel Mill Slag Transport Rail Operated Ladle Transfer Vehicle With V-Groove Deck |
Power supply | Conductor Rail Power |
Key Words | Rail Operated Ladle Transfer Vehicle |
Load capacity | 1-500T |
Running speed | 0-20m/min |
Application | Steel Mill,Metal Ore Factory |
Warranty | 12 month |
Color | Customized |
OEM | Accepted |
Brand Name | Topleader |
Model Number | KPD-Ladle Transfer Car |
Certification | CE,ISO9001 |
Place of Origin | China |
View Detail Information
Explore similar products
Ageing Furnace Material Transport Liquid Steel Ladle Transfer Bogie With
50t Hydraulic Lifting Battery Power Scrap Transfer Car With Dumping Device
High temperature electric driven steel ladle transfer car on curved rail
100t Aluminum Scrap Bucket Trolley On Rail Casting Ladles Transfer Cart For
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 600 sets/year |
Delivery Time | 30-40 days after receive your prepayment | Packaging Details | The whole Rail Operated Ladle Transfer Vehicle will be packed by the tarp, the parts will be packed by polywood case. |
Product name | 75 Ton Steel Mill Slag Transport Rail Operated Ladle Transfer Vehicle With V-Groove Deck | Power supply | Conductor Rail Power |
Key Words | Rail Operated Ladle Transfer Vehicle | Load capacity | 1-500T |
Running speed | 0-20m/min | Application | Steel Mill,Metal Ore Factory |
Warranty | 12 month | Color | Customized |
OEM | Accepted | Brand Name | Topleader |
Model Number | KPD-Ladle Transfer Car | Certification | CE,ISO9001 |
Place of Origin | China |
The rail operated ladle transfer vehicle is an electric operated material transfer cart which is powered by conductor rail and running on the rails. This transfer vehicle is designed to transfer hot ladle with an external temperature up to 350° C: it has a suitable protection for engines and it is painted with an heat resistant paint
As the rail operated ladle transfer vehicles are equipped with steel wheels and move on steel rails they are suited to very high loading capacities thanks to the very low friction between steel and steel. The capacity load can up to 500 tons.
The kinds of rail operated ladle transfer vehicle, which is powered by conductor rails. It makes the AC electricity power is transformed into AC 36v two-phase and are respectively connected to the two rails. Then the rail operated ladle transfer vehicle conduct the AC 36v on rail into the electrical appliance box at the bottom of the vehicle. And then the AC 36v is transformed into DC 36v to control the DC motor. Use this principle to make the ladle transfer vehicle start, stop, go forward and backward, adjust the speed and so on.
1. High quality reducer, gears adopt CNC grinding technology, high precision, good contact, high transmission efficiency, high bearing capacity and long service life.
2. High quality motor, with a correspondingly fast, large starting torque, from zero speed to rated speed with rated torque performance.
3. The wheel adopts angular bearing seat for easy installation and adjustment, in order to properly improve the machining accuracy of the relevant parts to improve the accuracy of the vehicle's installation and manufacturing, to place the wheel deviation, the contact between the rim and the track intensifies the rim wear and increases the frictional resistance and so on.
4. High degree of automation, to achieve unmanned automated production processes.
Model | KPD-5T | KPD-20T | KPD-30T | KPD-40T | KPD-50T | KPD-63T | |
Rated load (T) | 5 | 20 | 30 | 40 | 50 | 63 | |
Table size | length(L) | 3500 | 4000 | 4500 | 5000 | 5500 | 5600 |
Width(W) | 2000 | 2200 | 2200 | 2500 | 2500 | 2500 | |
Height(H) | 450 | 550 | 600 | 650 | 650 | 750 | |
Wheel Base (mm) | 2500 | 2800 | 3200 | 3800 | 4200 | 4300 | |
Rail Inner Gauge (mm) | 1435 | 1435 | 1435 | 1435 | 1435 | 1435 | |
Wheel Diameter(mm) | Φ300 | Φ350 | Φ400 | Φ500 | Φ500 | Φ600 | |
Wheel Quantity(Nos) | 4 | 4 | 4 | 4 | 4 | 4 | |
Ground Clearance (mm) | 50 | 50 | 50 | 50 | 50 | 75 | |
Running speed (m/min) | 0-25 | 0-20 | 0-20 | 0-20 | 0-20 | 0-20 | |
Motor Power (Kw) | 1.2 | 2.2 | 3.5 | 4 | 5 | 6.3 | |
Transformer Power (KVA) | 5 | 6.8 | 10 | 10 | 10 | 20 | |
Transformer Quantity (Pcs) | 1 | 1 | 1 | 1 | 1 | 1 | |
Running Distance (m) | 80 | 80 | 80 | 60 | 50 | 50 | |
Max Wheel Load (KN) | 25.8 | 77.7 | 110.4 | 142.8 | 174 | 221.4 | |
Reference Weight (T) | 3.6 | 5.9 | 6.8 | 7.6 | 8 | 10.8 | |
Recommended Rail Model | P18 | P24 | P38 | P43 | P43 | P50 |
Safe and environment friendly
Big starting power
Small impact to the gear reducer
Can running on s-shape rail, arc-shape rails
Has no limit on working distance
Anti-explosion, anti-high temperature
Long lifetime.
CNC Cutting
Transport the steel plate from raw material warehouse to CNC cutting workshop for cutting. After the cutting, the workers will do some simple processing such as chip moving and setting out.
Preliminary Assembling
Put the cut steel plate together according to the design drawing
Welding
Weld the steel plate with automatic welding machine after the preliminary assembling
Post weld treatment
Test the welding section after the welding, polish and burring. Post weld treatment to eliminate welding stress
Spray Primer
Transport the structure part after processing to painting booth for spraying primer. The main component of the primer is zinc rich epoxy antirust paint. The primer is to two layers
Assembling
Assemble the structure parts after spraying primer with wheels, motors and gear box, etc.
Paint finish
Transport the assembled vehicle to painting booth, inspect the integrity of primer. After that paint the finish
Debugging
Debugging the vehicle after painting the finish with electric control system, after the debugging, the vehicle will test without load. And after the no load test, the cart will be tested with load. After the inspection, the cart will be transported to storage area.
tags:crane rail trailer,steel billet handling trailer
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter
Year Established:
2015
Employee Number:
>200
Ecer Certification:
Site Member
Xinxiang New Leader Machinery Manufacturing Co., Ltd is devoted to manufacture and sell lifting and material handling equipment with 15 years experience. NEWLD is a professional and international handling equipment company integrating R&D, design, production and sales. It has a modern manag... Xinxiang New Leader Machinery Manufacturing Co., Ltd is devoted to manufacture and sell lifting and material handling equipment with 15 years experience. NEWLD is a professional and international handling equipment company integrating R&D, design, production and sales. It has a modern manag...
Get in touch with us
Leave a Message, we will call you back quickly!