Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 28000pcs per Month |
Delivery Time | 15-25 days |
Packaging Details | ITEM: VS-IHB-K25 LAMP SIZE : 223*472*201mmmm CTN SIZE: 33*43*17cm |
LED Driver | CB driver |
Color Temperature(CCT) | 3000-6500K |
Application | stadium/main road/courtyard |
Place of Origin: | Guangdong, China |
Brand Name | VS/OEM |
Model Number | VS-IHB-K25/50/75/100/125/150/200/250 |
Certification | CE, CB, ROHS, AS Required |
Place of Origin | Guangdong, China |
View Detail Information
Explore similar products
ODM Tennis Court Outdoor Led Sports Lighting 130lm/ W CRI
1200W LED Flood Lights Football Stadium High Mast LED Light IP65 6500K
1.2KW LED Outdoor Basketball Court Lighting 120 To 150lm/ W waterproof
26000lm Sports Field Led Flood Lights Football Pitch 200W 400W With Stand Arm
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 28000pcs per Month |
Delivery Time | 15-25 days | Packaging Details | ITEM: VS-IHB-K25 LAMP SIZE : 223*472*201mmmm CTN SIZE: 33*43*17cm |
LED Driver | CB driver | Color Temperature(CCT) | 3000-6500K |
Application | stadium/main road/courtyard | Place of Origin: | Guangdong, China |
Brand Name | VS/OEM | Model Number | VS-IHB-K25/50/75/100/125/150/200/250 |
Certification | CE, CB, ROHS, AS Required | Place of Origin | Guangdong, China |
High Light | 250w Stadium Lighting Led ,Ip65 Stadium Lighting Led ,Ip65 500 Watt Led Stadium Lights |
Q1: What's the watt per module of this module led reflector?
A: This module led reflector is 250w per module.
Q2: How to deal with the faulty ?
A: Firstly, Our products are produced in strict quality control system and the defective rate will be less than 0.2%.
Secondly, during the guarantee period, we will send new lights with new order for small quantity. For
defective batch products, we will repair them and resend them to you or we can discuss the solution including re-call according to real situation.
Q3. Do you support sample order for the module led reflector?
A: Yes, VS welcome sample order to test and check quality. Mixed samples are acceptable.
Q4. What about the VS lead time ?
A:Sample needs 5-7 days, mass production time needs 2-3 weeks for order quantity more than .
Company Details
Year Established:
2013
Total Annual:
25 Million-50 Million
Employee Number:
200~300
Ecer Certification:
Site Member
VIKSTARS CO.,LIMITED, founded in 2013, Overseas Marketing Center set in Shenzhen city, manufacturing base located in Zhongshan city. Our company specializing in production and export of Solar LED lighting, LED industrial lighting, LED smart lighting and ernergy storage system. Our main products inc... VIKSTARS CO.,LIMITED, founded in 2013, Overseas Marketing Center set in Shenzhen city, manufacturing base located in Zhongshan city. Our company specializing in production and export of Solar LED lighting, LED industrial lighting, LED smart lighting and ernergy storage system. Our main products inc...
Get in touch with us
Leave a Message, we will call you back quickly!