China factories

China factory - Qingdao UKD Machinery Co., Ltd.

Qingdao UKD Machinery Co., Ltd.

  • China,Qingdao ,Shandong
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Two Direction Alloy Steel Guide Screw Precision Hot Forging IATF16949
China Two Direction Alloy Steel Guide Screw Precision Hot Forging IATF16949

  1. China Two Direction Alloy Steel Guide Screw Precision Hot Forging IATF16949
  2. China Two Direction Alloy Steel Guide Screw Precision Hot Forging IATF16949
  3. China Two Direction Alloy Steel Guide Screw Precision Hot Forging IATF16949

Two Direction Alloy Steel Guide Screw Precision Hot Forging IATF16949

  1. MOQ: 500 pieces
  2. Price: Dollar 1-1.2 per piece
  3. Get Latest Price
Payment Terms L/C, D/A, D/P, T/T, Western Union
Supply Ability 5000000 pieces per year
Delivery Time 4-5 weeks
Packaging Details wooden box
Material Alloy Steel
Surface treatment shot blast, Heat treatment
Lead time 30 days
Tolerance ± 0.02mm
Process Forging , CNC machining, Heat treatment
Standard DIN
Brand Name UKD
Model Number 186*25
Certification IATF16949
Place of Origin EU

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, D/A, D/P, T/T, Western Union Supply Ability 5000000 pieces per year
Delivery Time 4-5 weeks Packaging Details wooden box
Material Alloy Steel Surface treatment shot blast, Heat treatment
Lead time 30 days Tolerance ± 0.02mm
Process Forging , CNC machining, Heat treatment Standard DIN
Brand Name UKD Model Number 186*25
Certification IATF16949 Place of Origin EU
High Light custom machined partsprecision machined parts

Two Direction Alloy Steel Guide Screw Precision Hot Forging ,CNC Machining Part

 

The Product Description

 

Outline Dimension length Diameter Remark
 178  40  2 Directionlead screw
Weight(kg) 0.63
Raw material  Hot Forging 
Major Process  forging+ CNC machining +package+shipment
Surface Treatment  heat treatment
Usage  Driving System
Package  carton +wooden cage
related industry  machine 
Quality Control  IQC PQC OQC

 

 

Real Photos

 

 
 

Roughly Parameters

 

Product Specification & Other information List:
1 Item Name Custom Forging Parts
2 Size As per approval product drawings.
3 DRW Format DWG, PDF, IGS, STEP, SLDPRT, SLDDRW, PRT, DRW, DXF, X_T, etc...
4 Weight 0.1-200 kg
5 Material Differenty types of Steels, Carbon Steel, Stainless Steel, Alloy Steel etc; Aluminum alloy, copper alloy, titanium alloy, tungsten molybdenum alloy and other non-ferrous metals.
6 Application Industry Equipments, Autos, Construction machinery Parts, Agricultural machinery, Railway relevant Parts, Petrochemical machinery, Mining machinery, The power industry.
7 Surface Treatment Self color, Polishing, Painting, Powder Coating, Electrophoretic Coating, Anodizing, Nickel Plating, Zinc Plating, Hot DIP Galvanizing etc.
8 Quality Control 1. IQC , PQC, OQC
2.100% check before shipment
9 Packing Plastic bags, Cartons, Racks, Plywood Cases etc. accordingly
10 Logistics Shipping, Air Flight, International Express etc.
11 Process Die Forging, Free Forging, Hot forging, Cold forging, Heat Treatment, Machining, Surface Treatment etc.
12 Certificate ISO/9001 ISO/IATF16949
13 Service Custom OEM/ODM metal parts processing, Whole Product assembly, 2D & 3D drawings design, International Delivery Logistics, Serivce before & after sales etc.

 

 

Related Products

 

 

 

FAQ

1. What proportion of your goods are exported?
100% of our production are exported to all over the world.

2. How long does it take to receive samples?
a) Pattern:30-45days after order
b) Sample:30days after pattern finishing.
c) The lead time is the general production period and not include the transportation time.

3. New product development process
Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept. to confirm the developing schedule---Prepare Prototype and sending for confirmation, fixture and gauge and making them in our house---mold steel buying---Machining---Inspection---Send out the tooling sample with initial inspection report.

4. How long is the manufacturing lead time?
Mass Production: 50days after sample approval by yours.
The lead time is the general production period not including the transportation time.
We could make some special production arrangement effectively if customer has urgent need.

5. What basis can we buy goods?
We generally offer customers prices FOB& CIF (Carriage, Insurance & Freight). The CIF includes the freight cost to your nominated sea port.
We do provide clearance of goods which needs to be handled by a local freight forwarder.
All local costs and taxes are the responsibility of the buyer. We are happy to offer advisement on shipping if required.

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    1997

  • Total Annual:

    4,000,000-5,000,000

  • Employee Number:

    200~300

  • Ecer Certification:

    Active Member

•   Qingdao Ukd Machinery Co.,ltd Located Qingdao, The Beautiful Coast City. Our Factory Covered 8 Acres.the Building Area Is More Than 12000 Square Meters.   •   With Over 20 Years Experience,we Are Expert At Casting Parts, Sheet Metal And Welding Parts, Cnc... •   Qingdao Ukd Machinery Co.,ltd Located Qingdao, The Beautiful Coast City. Our Factory Covered 8 Acres.the Building Area Is More Than 12000 Square Meters.   •   With Over 20 Years Experience,we Are Expert At Casting Parts, Sheet Metal And Welding Parts, Cnc...

+ Read More

Get in touch with us

  • Reach Us
  • Qingdao UKD Machinery Co., Ltd.
  • No. 66, Jiading Road, Shibei District, Qingdao
  • https://www.metal-castingparts.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement