Payment Terms | L/C, D/A, D/P, T/T |
Supply Ability | 5000000 pieces per year |
Delivery Time | 5-8 weeks |
Packaging Details | wood box |
Material | stainless steel |
process | lost wax investment casting |
surface treatment | Polish, wire polish Anodizing, |
dimensions | As Drawing |
Weight | 0.2 kg |
Standard | Din |
Brand Name | UKD |
Model Number | 70X60 |
Certification | ISO 9001 |
Place of Origin | EU |
View Detail Information
Explore similar products
Lost Wax Metal Casting Parts For Handle Ring , Investment Precision Casting
Precision Metal Casting Parts Four Fixing Stainless Steel Flange 80*20
Hardness Stainless Steel Edge Protection Precision Cnc Machining Parts
Metal Casting Products 4140 Cam Precision Investment Casting Part
Product Specification
Payment Terms | L/C, D/A, D/P, T/T | Supply Ability | 5000000 pieces per year |
Delivery Time | 5-8 weeks | Packaging Details | wood box |
Material | stainless steel | process | lost wax investment casting |
surface treatment | Polish, wire polish Anodizing, | dimensions | As Drawing |
Weight | 0.2 kg | Standard | Din |
Brand Name | UKD | Model Number | 70X60 |
Certification | ISO 9001 | Place of Origin | EU |
High Light | metal casting tools ,metal machining parts |
Door And Window Hinge Precision Lost Wax Casting , Investment Casting Part
Product Description
Model NO. | Jzd-011 | Main Process | Casting+CNC machining | |
Casting Method | Lost Wax Casting | Material | SUS304 | |
Surface Treatment | Polish or customized | Lead time | 45days | |
Surface Roughness | Ra3.2 | Tolerance | IT7 | |
Outline | 60*70 | Trademark | OEM | |
Transport Package | Carton+wood cage | Specification | Customized | |
Port | Qingdao,China | Quality control | APQP |
The Real Product Photos
Our Advantages
Common Product description:
The weights of casting parts | 0.10kgs - 300kgs. |
Machining | Turning, cutting, milling, grinding, drilling, reaming and threading. |
Tolerance: | 0.5mm, machining:0.05mm, finish machining:0.005mm |
Surface Treatment | Shot blasting, painting, chrome plating ,Oil, spraying, galvanization |
Material | Carbon steel, Stainless steel, Alloy Steel, aluminum alloy, Copper etc |
Product Processes | Wax injection ,tree assembly,dewax and sintering, casting, shock shell,shot blasting,cutting,grinding, Machining, Surface Treatment, Packing, all per request. |
(Made according to customers' drawing, specification and / or samples) | |
Specification:OEM & Custom According to Drawing or Sample |
The Process description
Our workshop corner
Our Capacity:
Item | Capacity monthly | Capacity yearly |
Forging parts | 200 tons | 2200 tons |
Die casting | 180tons | 2160 tons |
Sand casting | 500 tons | 5500 tons |
Wax lost casting | 300 tons | 3300 tons |
Quality Assurance:
Quality system | IATF16949 , 6Sigma |
Quality goal | Zero defects |
Quality control | Trained operator ,every process zero defects double check by operator & quality guy |
Final inspection | 100% check or like GP12 200% check |
FAQ
1. Q:What is the processing for the quote ?
A:We can quote from your 3d formats like IGS,STP,PARASOLID etc and 2D drawings as well;Quote the price
To clients after got the 2d or 3d drawings within 2 hours;
2. Q:How is the next ?
A:We will send the cost to you and get your confirmations for the quote;
3. Q:What is the software will you use for the proceeding ?
A:We make the 3D programm with Pro-Engineer, UGS, SOLIDWORKS, MasterCam, Catia etc ;
4. What proportion of your goods are exported?
100% of our production are exported to all over the world.
5. How long does it take to receive samples?
a) Pattern:30-45days after order
b) Sample:30days after pattern finishing.
c) The lead time is the general production period and not include the transportation time.
6. New product development process
Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept. to confirm the developing schedule---Prepare Prototype and sending for confirmation, fixture and gauge and making them in our house---mold steel buying---Machining---Inspection---Send out the tooling sample with initial inspection report.
Company Details
Business Type:
Manufacturer
Year Established:
1997
Total Annual:
4,000,000-5,000,000
Employee Number:
200~300
Ecer Certification:
Active Member
• Qingdao Ukd Machinery Co.,ltd Located Qingdao, The Beautiful Coast City. Our Factory Covered 8 Acres.the Building Area Is More Than 12000 Square Meters. • With Over 20 Years Experience,we Are Expert At Casting Parts, Sheet Metal And Welding Parts, Cnc... • Qingdao Ukd Machinery Co.,ltd Located Qingdao, The Beautiful Coast City. Our Factory Covered 8 Acres.the Building Area Is More Than 12000 Square Meters. • With Over 20 Years Experience,we Are Expert At Casting Parts, Sheet Metal And Welding Parts, Cnc...
Get in touch with us
Leave a Message, we will call you back quickly!