Payment Terms | T/T |
Supply Ability | 100000Tons per year |
Delivery Time | 2-10weeks |
Packaging Details | Plywood Cases or Pallets |
Material | Carbon Steel |
Color | Black |
Standard | ASME,DIN,3A,JIS |
Type | Connection Reducer |
Brand Name | PengXin |
Model Number | A234 WPB |
Certification | ASME |
Place of Origin | China |
View Detail Information
Explore similar products
4inch SCH STD Steel Pipe Reducer , Eccentric Weld Reducer ASTM A234 WPB
18 Inch X 10 Inch ASME B16.9 Stainless Steel Concentric Reducer A860 WPHY60
Surface Treatment 3''X2'' ASME B16.9 Concentric Weld Reducer STD WPB
DN100 X 50 SCH 40S Steel Pipe Reducer , Butt Weld Reducer ASME B16.9
Product Specification
Payment Terms | T/T | Supply Ability | 100000Tons per year |
Delivery Time | 2-10weeks | Packaging Details | Plywood Cases or Pallets |
Material | Carbon Steel | Color | Black |
Standard | ASME,DIN,3A,JIS | Type | Connection Reducer |
Brand Name | PengXin | Model Number | A234 WPB |
Certification | ASME | Place of Origin | China |
High Light | ASME 14inch Carbon Steel Pipe Reducer ,ASME Standard Steel Pipe Reducer ,ASME 14inch socket weld reducer |
Reducer, used for connection between two pipes of different diameters. According to different shapes, it can be divided into two types: concentric reducer and eccentric reducer.
Process document of concentric eccentric reducer
1. Scope: suitable for pressing steel concentric and eccentric reducer.
2. Pressing: Steel concentric and eccentric reducers are usually cold worked, i.e. pressed on a hydraulic press in a cold state (sometimes hot working).
3. Process flow: re inspection of raw materials → blanking → shot blasting → lubrication → pressing → heat treatment → shaping → shot blasting → groove processing → nondestructive testing → finished product inspection → anticorrosion → identification → warehousing.
4. Pressing process:
4.1 concentric and eccentric reducers are large and small, and the deformation degree of each pass is calculated by necking coefficient D / D (D is the diameter after necking, D is the diameter before necking).
4.2 the necking coefficient of different materials is different. The strength of normalized steel pipe is higher, so it needs to be pressed after annealing, but generally it is not annealed, unless it is difficult to press.
4.3 the necking coefficient of stainless steel and carbon steel low alloy steel is different, the first pressing of stainless steel can reach 0.65 ~ 0.7, and the later several passes are 0.85 ~ 0.9. Sometimes, it is necessary to press after heat treatment. Carbon steel and low alloy steel are generally 0.7 ~ 0.9. Generally, continuous pressing can be carried out for 1 ~ 3 times. However, different material properties may lead to continuous pressing for 4 times.
4.4 lubrication during pressing: No.3 industrial grease + lime is used for stainless steel in pressed state, butter + graphite powder is used for carbon steel and low alloy steel, and graphite powder is used for hot pressing.
4.5 the pressing die can be pressed only after the die is processed and the mold test is qualified.
.4.6 for mold repair, check the mold after each pressing to repair the scratch on the inner surface of the mold, and the surface smoothness is 6.3 μ M.
5. Process document management:
5.1 process documents must be sent to the team before pressing.
5.2 contents of process documents: ① process flow card. ② The drawings and documents should reflect the standard requirements (including the special requirements of customers) and focus on the safety of products.
5.3 Who needs to sign in the manufacturing process.
5.4 process flow cards and drawings must flow with products in each process.
Main processing technology |
(Note: there is a pickling and passivation process for stainless steel pipe fittings after groove processing) |
Product specifications | DN15-DN2000 (The diameter of the large and small ends of the rolled seam buffer can reach 3000mm) |
Material range | Carbon steel, chromium molybdenum steel, low alloy steel, all kinds of stainless steel |
Guarantee of main equipment and tooling | 1,5000T Press (mainly used for molding) 2,500T Press (mainly used for molding) 3,315T Press (mainly used for molding) 4,150T Press (mainly used for molding) 5,2 gas heating furnaces 6,1 gas heating furnace 7,1 pipe blanking machine 8,Machining equipment:
9,heat treatment:
10,2 sets of sand blasting equipment 11,One set of air compressor and one set of liquid cooling pool 12,One 2.4m plate bending machine 13,14 argon arc welding and manual arc welding machines 14,2 welding rod drying equipment 15,260 sets of die pressing mould for reducer 16,One stainless steel pickling tank 17,One manual mouth grinding machine (for large diameter groove treatment) 18,Two plasma cutting machines |
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Trading Company,Seller
Year Established:
2002
Total Annual:
21000000-45000000
Employee Number:
100~200
Ecer Certification:
Active Member
HEBEI PENGXIN PIPELINE EQUIPMENT GROUP CO.,LTD.. was established in the early 1990s, is located in China elbow pipe capital "mengcun" golden hinterland New hope. Here north of Beijing and Tianjin, south of Jinan, east Huanghua port, excellent location, ease of access and the uniq... HEBEI PENGXIN PIPELINE EQUIPMENT GROUP CO.,LTD.. was established in the early 1990s, is located in China elbow pipe capital "mengcun" golden hinterland New hope. Here north of Beijing and Tianjin, south of Jinan, east Huanghua port, excellent location, ease of access and the uniq...
Get in touch with us
Leave a Message, we will call you back quickly!