Payment Terms | T/T, L/C |
Supply Ability | 50 sets per Month |
Delivery Time | 2 months |
Packaging Details | Standard container, spare parts will be packed in wooden cases |
Max feeding size | 35mm-450mm |
Applicable Industries | Mineral crushing, Ore processing |
Online Service Time | 24 Hours online for your consultation |
Capacity | 30-1566t/h |
After Warranty Service | Video technical support |
Condition | New |
Brand Name | SANME |
Model Number | SMH120 , SMH250 , SMH350 , SMH550 |
Certification | ISO&CE |
Place of Origin | Shanghai, China |
View Detail Information
Explore similar products
German quality River pebble crushing and screening production line
complete river pebble production line cost
Professional limestone production line equipment manufacturer
Scheme Design Of Limestone Crushing And Screening Production Line
Product Specification
Payment Terms | T/T, L/C | Supply Ability | 50 sets per Month |
Delivery Time | 2 months | Packaging Details | Standard container, spare parts will be packed in wooden cases |
Max feeding size | 35mm-450mm | Applicable Industries | Mineral crushing, Ore processing |
Online Service Time | 24 Hours online for your consultation | Capacity | 30-1566t/h |
After Warranty Service | Video technical support | Condition | New |
Brand Name | SANME | Model Number | SMH120 , SMH250 , SMH350 , SMH550 |
Certification | ISO&CE | Place of Origin | Shanghai, China |
High Light | ISO Iron Ore Production Line ,1566t/H Iron Ore Production Line ,450mm Feeding Iron Ore Production Line |
Iron Ore Production Line Price , High Quality Iron Ore Production Line Equipment
According to customer needs
Suitable for processing nonferrous metal minerals such as iron ore, gold ore
Mineral crushing, Ore processing
Jaw crusher, cone crusher, vibrating feeder, vibrating screen, belt conveyor.
According to the kind and characteristic of ore, there are many different processes for iron ore dressing. In general, ore dressing plant may use primary, secondary and tertiary crushing processes for crushing iron ore. Jaw crusher is usually used for primary crushing; cone crusher is used for secondary and tertiary crushing. Through primary crushing, and then by secondary and tertiary crushing, ore will be crushed to the suitable size for feeding ball mill.
Iron ore will be evenly conveyed by vibrating feeder to jaw crusher for primary crushing, the crushed material will be conveyed by belt conveyor to cone crusher for further crushing, material after being crushed will be conveyed to vibrating screen for screening, and material with qualified particle size will be conveyed by belt conveyor to final product pile; material with unqualified particle size will be back from vibrating screen to cone crusher for secondary and tertiary crushing, to achieve a closed circuit. Particle size of final product can be combined and graded according to the requirement of client.
Company Details
Business Type:
Manufacturer,Seller
Year Established:
2005
Employee Number:
100~200
Ecer Certification:
Active Member
Shanghai SANME Mining Machinery Corp., Ltd. is a Sino-German JV holding company, total solution expert for green aggregates processing, and integrated service provider for solid waste recycling. SANME is headquartered in Shanghai with modern manufacturing workshop, research and developm... Shanghai SANME Mining Machinery Corp., Ltd. is a Sino-German JV holding company, total solution expert for green aggregates processing, and integrated service provider for solid waste recycling. SANME is headquartered in Shanghai with modern manufacturing workshop, research and developm...
Get in touch with us
Leave a Message, we will call you back quickly!