Payment Terms | T/T |
Supply Ability | 10000 pcs per month |
Delivery Time | 20-30 days |
Packaging Details | PP Bag, Paper Roll, Blister Box, Carton or According to Your Demand |
Material | Aluminum Alloy |
Keyword | Side-View Mirror Supporter |
View Angle | 120° |
Color | Black |
Mould Life | 50000-100000 Shots |
Tolerance | +/-0.01 mm |
Process | Die casting, CNC machining |
Quality Control | 100% Inspection |
Brand Name | JHPD |
Model Number | WID |
Certification | IATF16949 |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Black Anodizing Die Casting Parts / Round Aluminum Profile A380 For Heat Sink
Outdoor Aluminum Die Casting Parts Powder Coating 30K Customized
Anodized Aluminum Die Casting Parts Ra 3.2 1X1 mm For 3D Printer Equipment
Automotive Parts High Pressure Die Castings 50000 Shots Ra 6.3 ADC12
Product Specification
Payment Terms | T/T | Supply Ability | 10000 pcs per month |
Delivery Time | 20-30 days | Packaging Details | PP Bag, Paper Roll, Blister Box, Carton or According to Your Demand |
Material | Aluminum Alloy | Keyword | Side-View Mirror Supporter |
View Angle | 120° | Color | Black |
Mould Life | 50000-100000 Shots | Tolerance | +/-0.01 mm |
Process | Die casting, CNC machining | Quality Control | 100% Inspection |
Brand Name | JHPD | Model Number | WID |
Certification | IATF16949 | Place of Origin | CHINA |
High Light | 120 Angle Rear View Mirror Holder ,50000 Shots Rear View Mirror Holder ,SKD61 Auto Spare Parts |
Side-View Mirror Supporter Die Casting Outside Auto Spare Parts Rearview Mirror
Company Information
ShenZhen Johnhalm PDTec., Ltd and Shenzhen KaHeng Mould Manufacturer is a global manufacturer of both conventional and multi-slide die cast precision components. We offer solutions for a variety of industries including light of hoticulture and ballast, professional, stage lighting housings, LED light enclosures, motors, communication products, consumer electronics, automotive, healthcare, and more.
Mutiple Process
Products Description
Mold Material | SKD61, H13 |
Cavity | Single or multiple |
Mold Life Time | 50K times |
Product Material | 1) ADC12, A360, A380, A413, A356, LM20, LM24 2) Zinc alloy 3#, 5#, 8# |
Surface Treatment | 1) Polish, powder coating, lacquer coating, e-coating, sand blast, shot blast 2) Polish + zinc plating/chrome plating/pearl chrome plating/nickel plating/copper plating |
Size | 1) According to customers' drawings 2) According to customers' samples |
Drawing Format | step, dwg, igs, pdf |
Certificates | ISO 9001:2015 & IATF16949 |
Payment Term | T/T, L/C, Trade Assurance |
Lead Time | 1) Mold: 4-5 weeks 2) Mass production: <1000 2 weeks 1K-5K 3-4weeks |
Equipment list
Ka Heng Mould Manufactruring Limited Equipment list | ||||
No | Equipment name | Brand | Qty | Specification |
1 | Hot Chamber Die Casting Machine | LK | 1 | 88T |
Hot Chamber Die Casting Machine | LK | 1 | 160T | |
2 | Cold Chamber Die Casting Machine | LK | 1 | 500T |
Cold Chamber Die Casting Machine | LK | 2 | 280T | |
Cold Chamber Die Casting Machine | LK | 1 | 500T | |
Cold Chamber Die Casting Machine | LK | 1 | 800T | |
Cold Chamber Die Casting Machine | LK | 1 | 1250T | |
3 | CNC lathe Machine | TSUGAMI CHINA | 5 | |
4 | CNC Machining Centre | Brother and Taikan | 16 | |
5 | Milling Machine | FTM-4TA | 4 | |
6 | EDM Machine | CKEATE450 | 2 | |
7 | Radial drilling machine | Z3038X9 | 1 | |
8 | Grinding Machine | M618A | 3 | |
9 | Drilling Machine | SGM350 | 10 | |
10 | Tapping Machine | Z3038X9 | 10 | |
11 | Ultrosonic Machine | 1 | ||
12 | Sand Blast Machine | MQ3225 | 2 | |
13 | Lapping Machine | 2 |
Workshop
FAQ
1. How to ship the samples and production order ?
We will normally ship samples via DHL, UPS or FedEX via our cooperated forwarder or freight collect.
For the shipping of production order, it will be by sea or by air.
2. What is the solutions if the parts don't meet specification?
If we found the parts don't meet specification before shipment, our inspector will reject it and we will arrange remake the parts. If you received the parts and found problems, please let us know, we will recheck the remain, and find good solution to solve.
3. What is your warranty for the items?
Our inspector will check samples before mass production, after start production, we have inspectors check product every half an hour, before shipment, they will recheck parts to make sure it is good.
Company Details
Business Type:
Manufacturer,Exporter,Trading Company
Year Established:
2005
Total Annual:
7.6 Million -12.3 Million
Employee Number:
100~220
Ecer Certification:
Active Member
JHPD Mould Manufacturer was established in 2005, located in Tianluohu Industrial Park, Guanguang Road, Guanlan Town, Shenzhen (near the entrance of Meiguan Expressway, opposite of Chang'an Peugeot) which is very convenient to be in our factory. Since the establishment of the co... JHPD Mould Manufacturer was established in 2005, located in Tianluohu Industrial Park, Guanguang Road, Guanlan Town, Shenzhen (near the entrance of Meiguan Expressway, opposite of Chang'an Peugeot) which is very convenient to be in our factory. Since the establishment of the co...
Get in touch with us
Leave a Message, we will call you back quickly!