Type | bolted water storage tanks |
Application | waste water tanks |
Packaging Details | Standard export wooden box |
Delivery Time | 5~60 days |
Payment Terms | T/T, L/C, Western Union, MoneyGram |
Supply Ability | 20 sets per month |
Place of Origin | China |
Brand Name | MDS |
Certification | CE, ISO9001:2015 |
View Detail Information
Explore similar products
No Pollution Flexible Double Membrane Gas Holder Strong Tensile Strength
Auto Control Dual Membrane Gas Balloon On Digester Quick Installation
Anti Corrosion Dual Membrane Gas Domes Leak Proof For Biogas Storage
Anti Freezing Dual Membrane Gas Domes On Digester With Fire Protection
Product Specification
Type | bolted water storage tanks | Application | waste water tanks |
Packaging Details | Standard export wooden box | Delivery Time | 5~60 days |
Payment Terms | T/T, L/C, Western Union, MoneyGram | Supply Ability | 20 sets per month |
Place of Origin | China | Brand Name | MDS |
Certification | CE, ISO9001:2015 | ||
High Light | Corrosion Proof Bolted Steel Storage Tank ,Customized Size Bolted Steel Storage Tank ,Waste Water Bolted Steel Tanks |
Features
Bolted steel waste water storage tank is made of fiberglass steel material. The material is durable, versatile, easy to install, and recyclable with environmentally friendly properties.
Easy to install
Bolted steel storage tanks Unlike traditional concrete storage tanks that require a lot of labor and time to build, bolted steel storage tanks can be assembled quickly and easily.
Many specifications, can be customized size
Bolted steel waste water tanks come in a variety of shapes and sizes, while MODES can customize and design the tanks according to customer needs
Durability
versatility
Easy to install
Friendly
Municipal | Industrial | Agricultural | Mining | Bio fuel |
-Drinking water -Municipal waste -Leachate storage -Sewage treatment -Wastewater treatment -Anaerobic digestion
| -Industrial effluent Storage and process -Industrial effluent Digestion -Process water storage Bulk solids storage | -Slurry storage -Farm biogas production -Grain and forage silos
| -Diesel -Kerosene -Coal storage -Fly ash silo | -Biogas digester -Biogas biomass -Anaerobic reactor -Aerobic reactor
|
Double checking is required before packaging, confirm the plate's code and quality. The steel plates are separated with each other by PE foam, to avoid any damage on the coating surface. And the whole pallet is covered by a plastic film, tied by steel belt. Then the whole pallet is put inside a wooden box.
Packing: Sea-worth standard packing or as your requirements
Port of Loading: any port in China
Terms of Payment: Usually 30% payment by T/T in advance, 70% payment by T/T before shipment, (or L/C) according to order quantity
Production Period: 15-45 days according to order
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2015
Total Annual:
10 million-15 million
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Founded in 2015, Sichuan Mondes Green Technology Co., Ltd. stands proudly in Chengdu, the heart of Sichuan Province, a region celebrated as "the Land of Abundance." As the cornerstone subsidiary of Jiangxi Yitian Environmental Protection Equipment Co., Ltd., Mondes has carved out an illustrious repu... Founded in 2015, Sichuan Mondes Green Technology Co., Ltd. stands proudly in Chengdu, the heart of Sichuan Province, a region celebrated as "the Land of Abundance." As the cornerstone subsidiary of Jiangxi Yitian Environmental Protection Equipment Co., Ltd., Mondes has carved out an illustrious repu...
Get in touch with us
Leave a Message, we will call you back quickly!