Payment Terms | T/T |
Supply Ability | 50 Sets Mould Per Month |
Delivery Time | 30 working days |
Packaging Details | Wooden Case With Steel Frame |
Part Mateiral | A380/ADC12/A356/ADC12 |
Mold type | 2 plate-mold |
Useage | Drum accessries |
Mold material | 1.2344/H13/738H |
Mold base material | LKM & HASCO & DME, HASCO,S50C LKM, DME, LKM Mould Base |
Part surface | Sand Blasting |
Brand Name | KYE |
Model Number | OEM |
Certification | ISO9001:ISO14001 |
Place of Origin | China |
View Detail Information
Explore similar products
Watch Frame 2 Plate Die Casting Mould LKM HASCO Material
Aluminum Alloy 2 Plate S136 718H Die Casting Mould
Chrome Electroplating HASCO H13 1.2344 Die Casting Mold
Aluminum Fitting S50C LKM Die Casting Mould For Chair
Product Specification
Payment Terms | T/T | Supply Ability | 50 Sets Mould Per Month |
Delivery Time | 30 working days | Packaging Details | Wooden Case With Steel Frame |
Part Mateiral | A380/ADC12/A356/ADC12 | Mold type | 2 plate-mold |
Useage | Drum accessries | Mold material | 1.2344/H13/738H |
Mold base material | LKM & HASCO & DME, HASCO,S50C LKM, DME, LKM Mould Base | Part surface | Sand Blasting |
Brand Name | KYE | Model Number | OEM |
Certification | ISO9001:ISO14001 | Place of Origin | China |
High Light | NAK80 S136 Die Casting Mould ,Sandblasting S136 Die Mould ,Sandblasting NAK80 Die Mold |
Sandblasting NAK80 S136 Die Casting Mould For Drum Accessries
KYE can offer fast mold and part quote (inserts must be quoted offline by a project manager),Low cost, quick build and high quality ,Mold frame sharing technology,Online project management:
1. Automotive mold
Automotive trim, Rearview mirror shell,Central glive box,Front and rear wheel brow,Door frame,Roof rack,Before and after the retaining bar
Round shel cover plate,front and rear pedal,Air outlet grille, Auto lamp,The front baffle,Cockpit,Plastic Spindle
2. Home appliance product mold
Kitchen Appliances,Coffee port cover,Baby Plastic Tray Covers,Home appliance component,Plastic Spoon,Plastic Filter Shim, Home appliance component,Bottle Cap
3. Medical injection mold
Rapid Cap for Insulin Pen,Sleep Posture Belt,Len Case,Dental deill cover,Orthotic foot cushions,Artificial nipples
4. Industrial product mold
Insert molding,Plug Lid,Plastic Belt Buckle, plastis base cover,Vacuum Cleaner Connection, Rail Connection,Traffice Guidepost Cap, Plunger Guide Cap,Instrument Frame,Plastic Leg,Machine support insert,Connection Box,Industrial Container
5. Electronic product mold
Digital Signal Processor Cover,Plastic Lampholder,Plastic Lamp Shade,Socket Cover, Enclosure Cover,Semi-transparent Lamp Shade,Electronic Product Shell,Heating Panel,Intelligent Touch-screen Cover and Base
6. Over-mould injection mold
Bi-color cap, remote control mold, Hand Grip/hold/knob/shank,Road Traffic Cones Base,Cosmetic Bi Color Fliptop Cap,Bi-color Screen Frame,Medical product hand Grip
7. Die casting mold
Camera Chassis,Radio Assembly for Satellite Systems,Camera Housing,Cartridge Adhesive Applicators,Tablet Frame,toothbrush base and shaft, heat sink for LED headlinghts, phone front cover,Aluminum Heat Sink Cover,Aluminum Motor Cover
Product Details Description
Part materials | Aluminum A380/ADC12/A356/ADC12, zinc...Metal...etc. |
Quality | ROSH and SGS standard |
Size | According to your drawing |
Mould Base | S50C HASCO standard, European standard, World standard |
Mould Base Material | LKM, FUTA, HASCO, DME, etc. or as per customer’s requirement. |
Surface Finishing | Texture (MT standard), high gloss polishing |
Cavity / Core material | P20, 2311, H13, 2344, Starvax 420, 236,AdC3, S136, 2312, 2379, 2316, 2083, Nak80, 2767 etc. |
Cavity Number | Single cavity, Muti Cavity, based on customer’s requirement. |
Design & Program Softwares | CAD, CAM, CAE, Pro-E, Solid works…etc. |
Mold building lead time | 30~50 days after mold 3D approved, parts measurement report (upon required). |
Annual production | 300-400 sets of mold |
Mould Base | S50C HASCO standard, European standard, World standard |
Mould Base Material | LKM, FUTA, HASCO, DME, etc. or as per customer’s requirement. |
Surface Finishing | Texture, high gloss polishing,powder coating,laser cutting, Chrome, electro-plating |
Cavity / Core material | P20, 2311, H13, 2344, Starvax 420, 236,AdC3, S136, 2312, 2379, 2316, 2083, Nak80, 2767 etc. |
Cavity Number | Single cavity, Muti Cavity, based on customer’s requirement. |
Design & Program Softwares | CAD, CAM, CAE, Pro-E, Solid works…etc. |
Mold building lead time | 30~50 days after mold 3D approved, parts measurement report (upon required). |
OUR ADVANTAGE
1. Owned mold making workshop
KYE has owned mold workshop with 2,000 squre meteres in house to make sure the high quality and lead time.
2. Professional Engineer team
10 year of full expereience in line of plastic mold and molding, their professional skill can offer you the best solution for the project and help you manage the project in the best effective way.
3. Various Service
Our service including Automotive parts, Home Appliance, Electronic and Medical parts with one stop service
including product design, mould fabrication and second processing,such as Spray painting,Printing, Chrome, Engrave and assembling,etc.
4. Injection molding workshop
KYE has around 40-50 sets of injection machine.
5. Thorough project management system
KYE has thorough project management system from sales team to engineer and worker team.
FAQ
Q1: Does your company make mold by yourself?
A: Yes, we have our owned mold workshop around 2000 square meters including mold and molding.
Q2: What is the software you use for design and mold making?
A: We usually use UG, PROE, CAD, CAD/ProE/UG/SOLIDWORKS for mold 2D and 3D design.
Q3: Will offer the free sample?
A: We offer 10-20pcs free sample for each mold trial and the customer could in charge of sample delivery cost.
Q4: What is your payment term and how do you pack the mold for delivery?
A: Usually, our payment term is 50% on PO, 30% on T1 sample and 20% on mold approval before delivery by T/T.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter
Year Established:
2008
Total Annual:
2 Million-3 Million
Employee Number:
50~80
Ecer Certification:
Site Member
KYE Mould Technology Limited is set up at 2009, located in the well-known industrial town Chang`An,Dongguan city of China with convenient transportation and booming economy. We provide customer with one–stop service including product design,mold fabrication and second-processing(spray painting... KYE Mould Technology Limited is set up at 2009, located in the well-known industrial town Chang`An,Dongguan city of China with convenient transportation and booming economy. We provide customer with one–stop service including product design,mold fabrication and second-processing(spray painting...
Get in touch with us
Leave a Message, we will call you back quickly!