China factories

China factory - KYE Mould Techenology Limited

KYE Mould Techenology Limited

  • China
  • Site Member

Leave a Message

we will call you back quickly!

Submit Requirement
China OEM 3 Cavity S50C Plastic Injection Molding Service
China OEM 3 Cavity S50C Plastic Injection Molding Service

  1. China OEM 3 Cavity S50C Plastic Injection Molding Service
  2. China OEM 3 Cavity S50C Plastic Injection Molding Service
  3. China OEM 3 Cavity S50C Plastic Injection Molding Service
  4. China OEM 3 Cavity S50C Plastic Injection Molding Service

OEM 3 Cavity S50C Plastic Injection Molding Service

  1. MOQ: 1 set
  2. Price: To Be Negotiation
  3. Get Latest Price
Payment Terms T/T
Supply Ability 50 Sets Mould Per Month
Delivery Time 30 working days
Packaging Details Wooden Case With Steel Frame
Part Mateiral PC
Mold material NAK80/S136, NAK80, S136, 718H
Mold base material S50C LKM, DME, LKM & HASCO & DME, HASCO, LKM Mould Base
Surface requirement polishing
Cavity number 1+1+1 family mold
Mold life 500,000 shots
Brand Name KYE
Model Number OEM
Certification ISO9001:ISO14001
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 50 Sets Mould Per Month
Delivery Time 30 working days Packaging Details Wooden Case With Steel Frame
Part Mateiral PC Mold material NAK80/S136, NAK80, S136, 718H
Mold base material S50C LKM, DME, LKM & HASCO & DME, HASCO, LKM Mould Base Surface requirement polishing
Cavity number 1+1+1 family mold Mold life 500,000 shots
Brand Name KYE Model Number OEM
Certification ISO9001:ISO14001 Place of Origin China
High Light S50C Plastic Injection Molding Service3 Cavity S50C Molding ServiceOEM S50C Molding Service

OEM 3 Cavity S50C Plastic Injection Molding Service

 

Product Details Description

Plastic materials PS, ABS, PP, PVC, PMMA, PBT, PC, POM, PA66, PBT+GF30%,Rubber, Silicone rubber, LSR, aluminum, zinc...Metal...etc.
Quality ROSH and SGS standard
Size According to your drawing
Mould Base S50C HASCO standard, European standard, World standard
Mould Base Material LKM, FUTA, HASCO, DME, etc. or as per customer’s requirement.
Surface Finishing Texture (MT standard), high gloss polishing
Cavity / Core material P20, 2311, H13, 2344, Starvax 420, 236,AdC3, S136, 2312, 2379, 2316, 2083, Nak80, 2767 etc.
Cavity Number Single cavity, Muti Cavity, based on customer’s requirement.
Hot / Cold Runner HUSKY, INCOE, YUDO, HASCO, DME, MoldMaster, Masterflow, Mastip,etc.
Mould Life 1,000 to 1,000,000 shots(according to your requirement)
Design & Program Softwares CAD, CAM, CAE, Pro-E, Solid works…etc.
Package Standard Artificial Wooden Box with Steel Frame
Mold building lead time 30~50 days after mold 3D approved, parts measurement report (upon required).
Annual production 300-400 sets of mold

Who we are?

KYE team is at your service offering professional expertise, flexibility and accuracy in assumed deadlines.We are able to offer the full range of service from mold designing, Engineering/ Technical,Mold Building,Technical Injection Molding and Plasting/die-casting molding, plastic part molding to printing, assembly, package, and shipping arrangement.

KYE can offer fast mold and part quote with reasonable cost, shot lead time and high quality including:

1. Engineering ;
2. Rapid Prototyping;
3. Mould Making;
4. Plastic injection mould

5. Die-casting mould
6. Massive Production
7. Pre Production Run
8. Precision Machining

9. Modling with assembly and package

 

What KYE can offer

KYE can help you realize an idea to real product.

- Product idea viability check
- Product engineering verification

- Engineering design

- Prototype
- Tooling and molding
- Order production

- Assembly and packaging

- Logistics and shipping

 

Project process

Quote
According to sample, drawing and specific requirement.
Discussion
Mold material, price, payment, etc.
Advance
Payment by proforma invoice.
Product Design Checking
We check the product design. If some position is not perfect, or can not be done on the mould, we will send customer the report.
Mold Tooling
We start to make mold after mold design confirmed.
Mold Processing
Send report to customer once each week.
Mold Testing
Send trial samples to customer for confirmation.
Mold Modification
According to customer’s feedback.
Delivery
Delivery by sea or air. The forwarder can be designated by your side.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Exporter

  • Year Established:

    2008

  • Total Annual:

    2 Million-3 Million

  • Employee Number:

    50~80

  • Ecer Certification:

    Site Member

KYE Mould Technology Limited is set up at 2009, located in the well-known industrial town Chang`An,Dongguan city of China with convenient transportation and booming economy. We provide customer with one–stop service including product design,mold fabrication and second-processing(spray painting... KYE Mould Technology Limited is set up at 2009, located in the well-known industrial town Chang`An,Dongguan city of China with convenient transportation and booming economy. We provide customer with one–stop service including product design,mold fabrication and second-processing(spray painting...

+ Read More

Get in touch with us

  • Reach Us
  • KYE Mould Techenology Limited
  • #13 West of Zhen`an Road, Chang An Town, Dong Guan City, Guang Dong Province, China
  • https://www.oeminjectionmold.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement