China factories

China factory - KYE Mould Techenology Limited

KYE Mould Techenology Limited

  • China
  • Site Member

Leave a Message

we will call you back quickly!

Submit Requirement
China High Pressure 2 Plate PS ABS DME Die Casting Mould
China High Pressure 2 Plate PS ABS DME Die Casting Mould

  1. China High Pressure 2 Plate PS ABS DME Die Casting Mould
  2. China High Pressure 2 Plate PS ABS DME Die Casting Mould
  3. China High Pressure 2 Plate PS ABS DME Die Casting Mould

High Pressure 2 Plate PS ABS DME Die Casting Mould

  1. MOQ: 1 set
  2. Price: To Be Negotiation
  3. Get Latest Price
Payment Terms T/T
Supply Ability 50 Sets Mould Per Month
Delivery Time 30-50 working days
Packaging Details Wooden Case With Steel Frame
Part Mateiral A380/ADC12/A356/ADC12
Mold type 2/3 plate-mold
Mold material 1.2344/H13/738H
Mold base material S50C LKM, DME, LKM & HASCO & DME, HASCO, LKM Mould Base
Part surface powder coating and laser cutting
Tolerance ±0.005mm, 0.1mm
Shaping mode Die Casting
Brand Name KYE
Model Number OEM
Certification ISO9001, ISO
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 50 Sets Mould Per Month
Delivery Time 30-50 working days Packaging Details Wooden Case With Steel Frame
Part Mateiral A380/ADC12/A356/ADC12 Mold type 2/3 plate-mold
Mold material 1.2344/H13/738H Mold base material S50C LKM, DME, LKM & HASCO & DME, HASCO, LKM Mould Base
Part surface powder coating and laser cutting Tolerance ±0.005mm, 0.1mm
Shaping mode Die Casting Brand Name KYE
Model Number OEM Certification ISO9001, ISO
Place of Origin China
High Light DME Die Casting MouldABS DME Mould2 Plate DME Mould

High Pressure 2 Plate PS ABS DME Die Casting Mould

 

Product Details Description

Plastic materials Aluminum A380/ADC12/A356/ADC12, zinc...Metal...etc.
Quality ROSH and SGS standard
Size According to your drawing
Mould Base S50C HASCO standard, European standard, World standard
Mould Base Material LKM, FUTA, HASCO, DME, etc. or as per customer’s requirement.
Surface Finishing Texture (MT standard), high gloss polishing
Cavity / Core material P20, 2311, H13, 2344, Starvax 420, 236,AdC3, S136, 2312, 2379, 2316, 2083, Nak80, 2767 etc.
Cavity Number Single cavity, Muti Cavity, based on customer’s requirement.
Design & Program Softwares CAD, CAM, CAE, Pro-E, Solid works…etc.
Mold building lead time 30~50 days after mold 3D approved, parts measurement report (upon required).
Annual production 300-400 sets of mold
Quality ROSH and SGS standard
Size According to your drawing
Mould Base S50C HASCO standard, European standard, World standard
Mould Base Material LKM, FUTA, HASCO, DME, etc. or as per customer’s requirement.
Surface Finishing Texture, high gloss polishing,powder coating,laser cutting, Chrome, electro-plating
Cavity / Core material P20, 2311, H13, 2344, Starvax 420, 236,AdC3, S136, 2312, 2379, 2316, 2083, Nak80, 2767 etc.
Cavity Number Single cavity, Muti Cavity, based on customer’s requirement.
Hot / Cold Runner HUSKY, INCOE, YUDO, HASCO, DME, MoldMaster, Masterflow, Mastip,etc.
Design & Program Softwares CAD, CAM, CAE, Pro-E, Solid works…etc.
Mold building lead time 30~50 days after mold 3D approved, parts measurement report (upon required).
Annual production 300-400 sets of mold

 

 

KYE Mould Team is able to offer the full range of service from mold designing, making, plastic part molding to printing, assembly, package, and shipping arrangement.

1. Engineering/ Technical

Mold design

Mold flow analysis

Project management

Supplier Managed Inventory

Design for Manufacturing

Value Analysis

2. Mold Build

Mold up range from 50KG to 10 tons

Complex Surfaces

Assembly Fixtures

Hot-Runner Capability

3. Technical Injection Molding

Structural Foam

Small Precision and Large Cosmetic

High Pressure Thin wall

 

FAQ

Q: Are you trading company or factory?
A: We are factory.

Q: How soon can i get reply after sending inquiry?
A: All inquiries would be replied within 24 hours, except sleeping time in China; and our cell phones are standing by any calls at any time.

 

Q: What should I provide for price enquiry?

A: The 3d drawing (in STP/ STEP/ IGS/ X_T/ SLD format) with information about material, quantity, surface treatment, tolerance, and requires.

Q: If I don't have drawing, how can I get prototype?
A: If you don't have any drawing, you can send us your samples, we'll scan it and make the drawing first, then make prototype for you.

Q: What is your MOQ ( minimum order quantity)?
A: The MOQ is 1,000pcs for injetcion molding, you are welcome to send us trial order to test our quality and services.

Q: What is your payment term?
A: CIF, EXW or FOB Shenzhen, paid by T/T.

 

Q: Which material will your factory use to make a mold?
A. Our regular material has NAK80, S136, LKM, DAIDO, HASCO, DME

Q. What's your delivery time for molds and plastic injection products?
A. Our delivery time for mold: 3-5 weeks as mold structure complexity.

Q: Are you trading company or manufacturer?
A: We are a tool manufacturer specialized in customized injection molds, mold components, plastic products for foreign markets.


Q: I have a sample but don’t have drawing, what can I do?
A: Please send us some photos of the sample. And you can send us a sample and tell us your idea ,we will help to finish the 3D drawing design

 

Quality Assurance is the key to success for KYE Moulds, high-quality/defect free products is the reason KYE enjoys repeat business from our list of satisfied customers.We use high precision measurement tools and advanced video devices to check all parts and processes from incoming material till outgoing final inspection, to ensure only qualified products will be sent out to our customers.Thanks for the visit and looking for the inquiry!

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Exporter

  • Year Established:

    2008

  • Total Annual:

    2 Million-3 Million

  • Employee Number:

    50~80

  • Ecer Certification:

    Site Member

KYE Mould Technology Limited is set up at 2009, located in the well-known industrial town Chang`An,Dongguan city of China with convenient transportation and booming economy. We provide customer with one–stop service including product design,mold fabrication and second-processing(spray painting... KYE Mould Technology Limited is set up at 2009, located in the well-known industrial town Chang`An,Dongguan city of China with convenient transportation and booming economy. We provide customer with one–stop service including product design,mold fabrication and second-processing(spray painting...

+ Read More

Get in touch with us

  • Reach Us
  • KYE Mould Techenology Limited
  • #13 West of Zhen`an Road, Chang An Town, Dong Guan City, Guang Dong Province, China
  • https://www.oeminjectionmold.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement